A | C | |
---|---|---|
1 | Item - Short Description | Status |
2 | ShopVac front entrance | Anyone can do! |
3 | Put Wood, Aluminum, and Black Pipe in front entrance in Deep Storage | Anyone can do! Blue key is under the iPad behind the desk |
4 | Acquire Paint to de-gender Bathrooms | Thoughts? Anyone can do! |
5 | Bathrooms: Apply Painters Tape and Paint Trim / Edges as needed. | Anyone can do after paint is acquired |
6 | Bathrooms: Paint so bathrooms are no longer gender social norm colors! | Anyone can do after paint is acquired |
7 | Apply second coat of Grey Paint | Anyone can do! (Be detailed / careful : ) |
8 | Paint over splotches in Stairwell that don't match | Anyone can do! |
9 | Clean Non-White Pipes on the ceiling (especially the tops) | Anyone can do! |
10 | Paint Non-White Pipes on ceiling after they have been cleaned (Don't paint Copper Pipes) | Anyone can do! Paint is in front of the lockers |
11 | Apply second coat of Grey paint (Be liberal with the paint) | Anyone can do! |
12 | Sand lightly w/220 Grit, Wipe clean, and then apply second coat of polyurethane | Canyone can do! |
13 | Acquire Trac Lighting Cans (Cans point to ceiling & bulbs should not be visible to humans) | Anyone can pick up trac light cans for bulbs ; ) |
14 | Determine what Power Wheels equipment is actively used | Jacob? |
15 | Find or Print Fliers / Brochures to have at Open House | Anyone can search for our Tri-Fold brochures! |
16 | Fix Urinal or Call Plumber : ) | Thoughts? The handle leaks, and sometimes urinal does not stop flushing which results in gushing toilet water all over the floor. |
17 | Upstairs Front Door Sign: Make New (Vertical by Door) | Alex / Zach / Bill are working on this |
18 | Upstairs Front Door Sign: Awesome Sign that goes on the door | Alex / Zach / Bill are working on this |
19 | Downstairs Front Door Sign: Awesome Sign that goes on the door | Has to happen after door is painted either Grey or Fire Engine Red |
20 | Misc: Door Access: Design Spec! | Nate / Khevna? |
21 | Misc: Job Board Creation! | Has been posted on wall by desk! |
22 | Misc: Send out Thank You messages to donors! | Nate / Board! |
23 | Misc: September Events Listing: Design, Print, Post! | Dana can do |
24 | Prepare new member job email | Josh |
25 | Run Cat-5 from Comp. Lab to Front Desk. Cat 5 should NOT drape from ceiling. | Anyone can do - Zip Ties & Zip Tie Mounts are on table in front of locker |
26 | Etch / Clean Exposed concrete under / around Comp. Lab | Delayed till Sunday 9/15/2013 |
27 | Epoxy Paint over cleaned concrete under / around Comp. Lab | Delayed till Sunday 9/15/2013 |
28 | Run Cat-5 from Network Wall to Comp. Lab. Cat 5 should NOT drape from ceiling. | Anyone can do! |
29 | Belt Sand Desk Floor Smooth | Done |
30 | Put Hand Tools Away | Done |
31 | Match Paint of Stairwell (Grey) | Done |
32 | Match Paint of Stairwell (Light Blue) | Done |
33 | Print Job Board | Done |
34 | Bright Futures: Reduce & Organize | Done |
35 | Ceilings: Reduce & Organize Cabling | Done |
36 | Computer Lab: Organize & Hook Back Up | Done |
37 | Console Area: Console equipment > storage until further location determined. | Done |
38 | Craft Area: Organize inside bins, organize outside, label | Done |
39 | Dungeon Area: Reduce and Recycle/Trash | Done |
40 | Electronics Bench: Reduce & Organize | Done |
41 | Front Ceiling: Apply Painters Tape (We don't want to paint the track lighting) | Done |
42 | Front Ceiling: Apply Second Coat of Paint | Done |
43 | Front Ceiling: Paint Trim / Edges as needed w/Primer | Done |
44 | Front Ceiling: Paint w/Primer! | Done |
45 | Front Desk: Reduce & Organize (Remove Console equip) | Done |
46 | Front Floor: Prep & Epoxy Exposed Concrete Floor | Done |
47 | Front Side Wall: Apply Painters Tape & Paint Trim / Edges as needed w/primer! | Done |
48 | Front Side Wall: Paint w/Primer! | Done |
49 | Front Side Wall: Remove everything on wall up to pillar (42" LCD, etc.) | Done |
50 | Front Stairwell Entrance: Reduce & Organize > Deep Storage | Done |
51 | Hook computers back up with Care & Tender Organization | Done |
52 | Loud Noise Room: Brush Paint Trim on Black Edges/Corners & Ugly Spots | Done |
53 | Loud Noise Room: Fix lower shelf on standing workbench | Done |
54 | Loud Noise Room: Gut & Clean | Done |
55 | Loud Noise Room: Roll Paint on Black edges | Done |
56 | Misc: Drill Bits, Hex Bits, etc. Organize! | Done |
57 | Misc: Implement Computer Access? | Done |
58 | Misc: Revamp Floor Layout | Done |
59 | Move Comp. Lab temp to other side | Done |
60 | Prep - Purchase Paint & Supplies | Done |
61 | Prototyping Room: Gut & Clean | Done |
62 | Prototyping Room: Organize Tools | Done |
63 | Prototyping Room: Paint Ceiling & Walls | Done |
64 | Purgatory: Reduce and Recycle/Trash | Done |
65 | Trash Run | Done |
66 | BYB Area: Consolidate, Organize, Label! | Done |
67 | ||
68 | ||
69 | ||
70 | ||
71 | ||
72 | ||
73 | ||
74 | ||
75 | ||
76 | ||
77 | ||
78 | ||
79 | ||
80 | ||
81 | ||
82 | ||
83 | ||
84 | ||
85 | ||
86 | ||
87 | ||
88 | ||
89 | ||
90 | ||
91 | ||
92 | ||
93 | ||
94 | ||
95 | ||
96 | ||
97 | ||
98 | ||
99 | ||
100 |