2 of 9

Coupling Experiment to Accelerator Controls

2

CEAC-Moller

  1. ODU collaborators starting to discuss control algorithms based on tree-based models trained on CRex data
  2. Weekly meeting is being rescheduled due to faculty and student time constraints

TwinD

  • Fixed some bugs in the two person teams
  • Began iterating to get the harp scan working
    • Got claude to help make an autojudging script to begin quantifying trials
  • David mentioned a possible desire to “harden” the agents. Have begun thinking about that…

CEAC-GlueX

  • Validation of GNN for FCAL cluster classification (neutral vs hadronic showers) in progress
  • ECAL/FCAL calibrations integrated into SMOCS
    • Possible JANA2 producer integration (need to strategize with Nathan Brei)
  • David updated the data challenge roadmap

EPSCI Group Meeting August 18, 2026

3 of 9

EIC Computing and Software

3

Validation

  1. See ePIC integration notes on Hydra slide
  2. New meeting time needed to incorporate co-conveners schedule
  3. Stalled effort on validating tracking-level campaign plots because everyone is so busy

Accomplishments

  • one …
  • two …
  • three …

Reconstruction

  • Timeframe splitter PR with Takuya
    • Two rounds of reviews and responses to comments
  • Prepared a talk at ePIC workshop at ODU (Wed–Fri this week)
    • “JANA2 Updates: Hierarchical vs Batched Events”
  • Contributed to a paper for NIM-A
    • “ePIC Software and Simulations”
    • Sections on framework, timeframe splitting, and future work (e.g. heterogeneous hardware offloading)
  • Resumed work on BatchedArrow

EPSCI Group Meeting August 18, 2026

4 of 9

Hydra

4

Accomplishments

  1. one …
  2. two …
  3. three …

OPS

  • Beam off early due to a compressor failure.
    • GlueX and Hall C online operations have stopped.
    • ePIC, GSI, GlueX and HallC offline operations are ongoing
  • VM request ticket is in to get a VM to run ePIC’s deployment
  • Hydra summary stats provided for David L’s lab update

Development

  • CILogon almost done and ready
    • Deployed for ePIC
  • Restful api to allow ePIC production to integrate hydra
    • Notify of data and readback results
  • A number of merge requests in the queue due to CI/CD issues

EPSCI Group Meeting August 18, 2026

5 of 9

DAQ: Streaming Readout + CODA

5

CODA + ERSAP

  1. Began drafting the design requirements for a Virtual Crate CODA component
  2. Addressing new CODA requirements from Hall D
  3. Resuming work on the extended ERSAP paper
  4. Nathan Baltzell’s request to move EVIO’s java to Java 21

Streaming Readout

  • Initiated a GEMC digitization project to simulate VTP output for the CLAS12 detector.
  • Writing the CHEP paper.
  • Preparing the SC26 poster and accompanying paper: � submitted Aug 8
  • Had several chats on shift w/ Hall D and EIC groups about SRO@Hall D
    • Test platform (PS) supports SRO, in use
    • GlueX Inner ECAL: VTP/fADCs should support SRO(?)
  • LDRD (clas sro trigger): no update yet
  • News on JLab ejfat LBs?

EPSCI Group Meeting August 18, 2026

6 of 9

Genesis Mission / American Science Cloud

6

RFA

  1. Both of the RFAs Thomas is on have begun to move forward
    • Infrastructure, SOWs etc
  2. Torri unofficially advising on tasks, milestones, SOWs, and data sharing plans for polarized target RFA

Discovery Engine

  • Thomas drafted some content on how to access AmSC and MAG and has submitted a PR to include it in the knowledgebase

HAIDIS

  1. Implemented ERSAP observability support for the training set preparation workflow
  2. Workings on paper in progress

Nathan: AmSC-SUF

  • Attempted to reproduce EJFAT streaming from BNL IC2 for a SC paper
  • BNL->JLab, BNL->Perlmutter both failed
  • Quickly tested JLab EJFAT locally (JLab->JLab), worried that it might not be working at all right now

Nathan: MOSAIC

  1. Brainstormed ways to substantially contribute, received positive feedback from Torre on all counts

EPSCI Group Meeting August 18, 2026

7 of 9

7

LD2606 and AmSC Data Services - Data Movement

Aug/5 – Aug/18 Accomplishments

  1. IPDPS’27 submission (ddl: Oct 1, 10-page excluding References)
    • GPU variability (ongoing) - Internship & Me
      • 8-page draft (Background, Methodology, Microbenchmarking and initial AI training results).
      • Proof-write to redo the logic and confirm the findings.
    • LDRD paper (initiated).
  2. LDRD
    • DAOS (TODO) - Not working since Aug. Hardware failure?
    • DPU testbed (Ongoing)
      • DOCA v3.4 flashed to BF-3 and BF-2 but failed to SSH to them. BF-3’s default mode is NIC.
      • No IP for either DPU. 100+ Gbps Ethernet link not installed?
    • Raiqa: end-to-end data collection and visualization workflows.
  3. SC26 workshop
    • PDSW submitted on Aug/7. AD submitted on Aug/12.
      • This workshop has 25 full-paper submissions in total and it might only accept < 10.
    • W&M professor explored HPC-Quantum I/O problem.
  4. QCD-ZGEMM benchmarking (for Amitoj)
    • Ongoing - Meetings AMD (predict MI430 perf with ROCm profiling on MI350), NVIDIA and Google (using BF16 hardware doing FP64 computing)

EPSCI Group Meeting August 18, 2026

8 of 9

JANA2

8

LD2613: Distributed workflow steering

  1. Jon Zarling site visit!�
  2. Refactored Conductor to use Reactor/Listener abstractions�
  3. Ported the ERSAP BaseOrchestrator to C++, working on the CoreOrchestrator
    • Base <: Core <: Abstract <: Generic
    • Adventures leveraging Claude for this�
  4. Ongoing: Running the Conductor from a VM, communicating with MCP and code.jlab.org

JANA2

  • Issue: LLMs are complaining about nonexistent race conditions because they can’t figure out which JANA2 callbacks are called sequentially�
  • Issue: Input<>s are accessible from JEventProcessor::ProcessParallel, which _is_ a race condition if somebody uses them

EPSCI Group Meeting August 18, 2026

9 of 9

Miscellaneous

9

Accomplishments

  • one …
  • two …
  • three …

MCwrapper

  • Chewing through a backlog caused by outage
  • Discovered a bug (URL not updated) in the csh version (and fixed it)

SPINDLE

  • ERSAP + JANA2 integration discussions
  • No response yet from lab leadership about status of LDRD

AIOP-Target

  • Monibor (data science) is finishing up his portions of edits to the paper draft this week

EPSCI Group Meeting August 18, 2026