1 of 9

Bartlesville Public Schools

BOND OVERSIGHT COMMITTEE

July 2018 Secondary Schools Tour

Oversight Committee members see the flooring, paint, and lighting updates in the 1968 small gym at Bartlesville High School

2 of 9

What were originally auto shops in the 1939 Phillips Field House and later journalism and pom space was renovated into an auxiliary instrumental music room with stairway access to the band room in the adjacent Fine Arts Center

3 of 9

The original drafting room was renovated into a pom locker room and the 1968 auxiliary gym, which was most recently a weight room, became a pom practice room.

4 of 9

The last bay of the Bruin Activity Center indoor practice facility was renovated into an athletics weight room and a cheerleading practice room.

5 of 9

The Central Middle School auditorium has new seating on the main floor, carpet, paint, balcony rail, plaster repairs, and audiovisual updates.

6 of 9

The Madison Middle School auditorium also has new seating and carpet. The stage was repaired and audiovisual systems were updated.

7 of 9

The Madison cafetera was repainted.

8 of 9

The new softball locker room at Madison allowed former locker room space to be repurposed for a relocated choir room (shown here) and additional music practice rooms and storage.

9 of 9

Both gymnasiums at Madison have updated flooring, paint, and lighting.