ORBIT 72 · NASA Space Apps 2026 · Team HDMK
Space Mission Design Game · NASA Space Apps Challenge 2026 · Hanoi
ORBIT 72
Build a satellite. Beat the storm. Keep everyone connected.
TEAM HDMK
MISSION PATCH
Ha Duyen Minh Khoi Ha Duyen Hung Ha Hoang Thu Ha Duyen Manh
The Problem
6,285
mobile stations offline in 15 provinces when Typhoon Yagi hit Vietnam (September 2024)
ORBIT 72 · NASA Space Apps 2026 · Team HDMK
CANNOT COMMUNICATE WITH RESCUE TEAM
Victims
19 million
school students in Vietnam learn orbits, energy and radio waves mostly as formulas
The Potential
Low-orbit communication satellites and ground stations are
STRATEGIC TECHNOLOGY PRODUCT
in Vietnam
Free in the browser · solo or co-op for 2–4 players · Vietnamese / English
ORBIT 72 · NASA Space Apps 2026 · Team HDMK
The solution
We have developed the game ORBIT 72 - the game challenges players to design, launch, and operate an emergency CubeSat constellation to restore critical SOS communications during the vital first 72 hours after landfall.
THE TARGET OF THE GAME : Students can gain a better understanding of how satellites operate to assist people during natural disasters.
Inside the Game
ORBIT 72 · NASA Space Apps 2026 · Team HDMK
05
Build the satellite
ILD
Design the orbit
Vote Go/No-Go
Read the debrief
IEF
NASA Data at the Core
Also from the challenge resources: JPL Concept Maturity Levels (players earn CML 1–4), the four mission segments, CubeSat 101. GPM is a joint NASA–JAXA mission.
ORBIT 72 · NASA Space Apps 2026 · Team HDMK
07
GPM IMERG V07 · HANOI SECTOR
NASA GPM IMERG V07 Final (rainfall of Typhoon Yagi, 7–10 Sep 2024)
Weights the rescue score hour by hour and draws the real rain map. Reference design: 48.1 % of SOS messages delivered within 1 hour.
NASA DONKI (space weather)
The solar-storm event uses the strongest storm of 2024: 10 May 2024, Kp 9.
NASA Small Spacecraft Technology State-of-the-Art 2026
Ranges for every satellite part.
OPS · RAIN LAYER
7–10 SEP 2024
Real Science, Verified
ORBIT 72 · NASA Space Apps 2026 · Team HDMK
08
300+
automated tests on every formula
97.4°
sun-synchronous inclination at 500 km, matches the flown FACSAT-2 satellite
93.0 min
orbital period at 420 km, matches the ISS
9.7 / 8.4 / 9.3 dB
link margins to the Hoa Lac ground station
Built for Students and Teams
Play together
4 mission roles, secret priority cards, a real Go/No-Go poll
Learn by trying
Plain-language explanations on every term, five stars with cause-and-effect feedback, edit and fly again
Develop more languages (Vietnamese,…) and more scenario about natural disasters in Asian countries (Bangladesh, Indonesia,..)
Development Target
Backup for Q&A
ORBIT 72 · NASA Space Apps 2026 · Team HDMK
11
RESOURCES
NASA :
NASA DATA
SPACE AGENCY PARTNER & OTHER DATA
OTHERS :
R1 | longest gap ≤ 3.5 h |
R2 | data produced ≤ data downlinked |
R3 | power margin ≥ 10 % and battery covers eclipse |
R4 | orbital lifetime 3–8 years |
R5 | cost ≤ 3,000k USD |
R6 | development ≤ 18 months |
R7 | link margin ≥ 3 dB |
R8 | all required parts |
A2 · The eight requirements
ORBIT 72 · NASA Space Apps 2026 · Team HDMK
A2
A3 · How it is built
ORBIT 72 · NASA Space Apps 2026 · Team HDMK
A3
FRONTEND
TypeScript + React + Vite
NASA DATA
data prepared with Python (earthaccess, NASA API)
DELIVERY
GitHub Actions → GitHub Pages · cost 0 · offline version available · MIT licence
More satellites on one launch barely help
Satellites in one orbital plane pass at the same times. Only more planes close the gap — and each plane needs its own launch (4 launches: 2,640k USD).
ORBIT 72 · NASA Space Apps 2026 · Team HDMK
06
Next Steps & Play Now
Student project for NASA Space Apps 2026. Not affiliated with or endorsed by NASA. AI use declared in AI_USAGE.md.
ORBIT 72 · NASA Space Apps 2026 · Team HDMK
10
Build a satellite. Beat the storm. Keep everyone connected.
01
Pilot in schools in storm-prone provinces
02
Teacher kit and full English version
03
New storm scenarios for the Philippines and Bangladesh
Play: holisurt.github.io/orbit72
Code: github.com/holisurt/orbit72