1 of 19

CASTING DEFECTS

K.PRIYADHARSHINI

Senior Lecturer

Department Of Prosthodontics

2 of 19

INTRODUCTION

DISTORTION

SURFACE ROUGHNESS

IRREGULARITY

DISCOLOURATION

AIR BUBBLES

WATER FILMS

RAPID HEATING RATES

UNDER HEATNG

PATTERN POSITION

POROSITY

LOCALIZED SHRINKAGE POROSITY

MICROPOROSITY

PINHOLE POROSITY

GAS INCLUSION POROSITY

SUBSURFACE POROSITY

CONTENTS

3 of 19

4 of 19

DISTORTION

PROPER MANIPULATION OF WAX AND HANDLING THE PATTERN

CASTING FITS BEST WHEN THE PATTERN IS INVESTED IMMEDIATELY AFTER ITS REMOVAL FROM THE PREPARATION

NONUNIFORM OUTWARD MOVEMENT OF INVESTMENT [SETTING AND HYGROSCOPIC EXPANSION ]

DISTORTION THICKNESS OF THE PATTERN DECREASES

WHEN HOT WAX COOLS IT SHRINKS TOWARDS THE CENTER,PULLED AWAY FROM LUBRICATED SURFACE

5 of 19

SURFACE ROUGHNESS, IRREGULARITIES AND DISCOLORATION

PARTICLE SIZE OF INVESTMENT AND ITS ABILITY TO REPRODUCE THE WAX PATTERN IN MICROSCOPIC DETAILS

6 of 19

AIR BUBBLES AND WATER FILMS

TO USE VACUUM INVESTING TECHNIQUE

USE OF A MECHANICAL MIXER WITH VIBRATION BOTH BEFORE AND AFTER MIXING

APPLY THIN LAYER OF WETTING AGENT –AIR DRIED-EXCESS LIQUID DILUTES THE INVESTMENT [ SURFACE ROUGHNESS]

WATER FILM FORM IRREGULARLY OVER THE SURFACE

IT OCCURS IF THE PATTERN IS SLIGHTLY MOVED OR VIBRATED AFTER INVESTING

TOO HIGH LIQUID POWDER RATIO

7 of 19

RAPID HEATING

FINS OR SPINES ON CASTING

FLAKING OF THE INVESTMENT WHEN THE WATER OR STEAM POURS INTO THE MOULD [ SURFACE ROUGHNESS]

MOULD SHOULD BE GRADUALLY HEATED – 60 MINS

Greater the bulk of the investment more slowly it should be heated

UNDER HEATING

INCOMPLETE ELIMINATION OF WAX RESIDUES- GAS FORMED WHEN HOT ALLOY COMES IN CONTACT WITH CARBON RESIDUES

INCOMPLETE CASTING

8 of 19

POROSITY

SOLIDIFICATION DEFECTS

LOCALIZED SHRINKAGE POROSITY

MICROPOROSITY

TRAPPED GASES

PINHOLE POROSITY

GAS INCLUSIONS

SUBSURFACE POROSITY

RESIDUAL AIR

9 of 19

LOCALIZED SHRINKAGE POROSITY

PREMATURE TERMINATION OF FLOW OF MOLTEN METAL DURING SOLIDIFICATION

LINEAR CONTRACTION OF NOBLE METAL ALLOY-1.25%

Continuous feeding of molten metal through sprue should must occur to compensate of metal volume during solidification

Sprue freeze before last portion of casting that solidifies

Small chill-set sprue ensure that solidification begins within the sprues-cooling pins to carry heat away from the pontic

Generally occur near sprue cast junction

10 of 19

SUCK-BACK POROSITY

11 of 19

MICROPOROSITY

SOLIDIFICATION IS TOO RAPID FOR THE MICROVOIDS TO SEGREGATE TO THE LIQUID POOL

MOLD OR CASTING TEMPERATURE IS TOO LOW

12 of 19

PINHOLE AND GAS INCLUSION POROSITY

METALS DISSOLVE OR OCCLUDE GASES WHILE THEY ARE MOLTEN

[EG copper and silver dissolve oxygen , platinum and palladium dissolve hydrogen and oxygen.

On solidification absorbed gases are expelled.

Large voids occurs as the gases are mechanically trapped by the molten metal.

13 of 19

BACK PRESSURE POROSITY

SUBSURFACE POROSITY

14 of 19

INCOMPLETE CASTING

MOLTEN ALLOY HAS BEEN PREVENTED FROM COMPLETELY FILLING THE MOLD

-INSUFFICIENT VENTING –BACK PRESSURE POROSITY-CANNOT FILL BEFORE IT SOLIDIFY-INSUFFICIENT CASTING PRESSURE

-HIGH VISCOSITY OF THE METAL

EG – ROUNDED INCOMPLETE MARGINS

INCREASE IN TEMPERATURE-DECREASES SURFACE TENSION AND VISCOSITY

15 of 19

16 of 19

SPRUE POSITION

17 of 19

18 of 19

REFERENCES

Philips’ science of dental materials,anusavice, 11th edition

Craig’s restorative dental materials,Power and sakaguchi, 12 th edition

19 of 19

THANK YOU