SAP Project System

Create Project Copy from

Standard WBS with Standard Milestone

Process External Cost, Sales Order with

Milestone Billing, Execute Billing,

Settlement

(also refer to previous Blog Post)

WBS0103 Standard Milestones

WBS0104 Create Standard WBS with Standard Milestones

2 of 130

IDES Project Profile “0002 Cost Project” will be used for this demonstration.

The Principles behind Project System with WBS w/o Network is not covered entirely especially for Settlement Scenarios to Profitability COPA. Here, the main purpose is to show Milestone and its Billing Plan Execution methods as well as Cost collection and Settlement to Responsible Cost Center in a single Project Structure.

3 of 130

  • Create Operative Project copy from Standard WBS
  • Set Responsibility Cost Center (for Settlement)
  • Set Milestone Dates in the Operative Project
  • Release Project
  • Create Sales Order with Milestone Billing Plan
  • Check Revenue Report Planned via Sales Order
  • Debit Cost to Project Internal Work confirmation via ECP
  • Plan for External Work via ECP until PR and check Cost posted
  • PR to PO and GR to PO then check Cost for External work
  • Set Actual Dates for Milestones to Release Billing Plan dates
  • Execute Billing
  • Check Cost for Revenue generated via Billing
  • TECO Project
  • Generate Settlement Rule
  • Calculate Overhead and check cost reporting of overheads posted
  • Settlement
  • Check Cost Report after Settlement

4 of 130

5 of 130

New Operative Project E-1199

12.05.2018

15.07.2018

Use Project Profile

0002 Cost Projects

Copy from Std proj definition

E-0099

6 of 130

Save

7 of 130

  • Create Operative Project copy from Standard WBS
  • Set Responsibility Cost Center (for Settlement)
  • Set Milestone Dates in the Operative Project
  • Release Project
  • Create Sales Order with Milestone Billing Plan
  • Check Revenue Report Planned via Sales Order
  • Debit Cost to Project Internal Work confirmation via ECP
  • Plan for External Work via ECP until PR and check Cost posted
  • PR to PO and GR to PO then check Cost for External work
  • Set Actual Dates for Milestones to Release Billing Plan dates
  • Execute Billing
  • Check Cost for Revenue generated via Billing
  • TECO Project
  • Generate Settlement Rule
  • Calculate Overhead and check cost reporting of overheads posted
  • Settlement
  • Check Cost Report after Settlement

8 of 130

Double-click to Open Project E-1199

9 of 130

Goto

WBS element overview

10 of 130

Enter Cost Center 4290 as Responsibility Cost Center (as Settlement Receiver)

11 of 130

  • Create Operative Project copy from Standard WBS
  • Set Responsibility Cost Center (for Settlement)
  • Set Milestone Dates in the Operative Project
  • Release Project
  • Create Sales Order with Milestone Billing Plan
  • Check Revenue Report Planned via Sales Order
  • Debit Cost to Project Internal Work confirmation via ECP
  • Plan for External Work via ECP until PR and check Cost posted
  • PR to PO and GR to PO then check Cost for External work
  • Set Actual Dates for Milestones to Release Billing Plan dates
  • Execute Billing
  • Check Cost for Revenue generated via Billing
  • TECO Project
  • Generate Settlement Rule
  • Calculate Overhead and check cost reporting of overheads posted
  • Settlement
  • Check Cost Report after Settlement

12 of 130

Enter date for Milestone #1

13 of 130

Enter date for

15, Month+1 Milestone #2

14 of 130

Enter date for

15, Month+2 Milestone #3

SAVE

15 of 130

  • Create Operative Project copy from Standard WBS
  • Set Responsibility Cost Center (for Settlement)
  • Set Milestone Dates in the Operative Project
  • Release Project
  • Create Sales Order with Milestone Billing Plan
  • Check Revenue Report Planned via Sales Order
  • Plan for External Work via ECP until PR and check Cost posted
  • PR to PO and GR to PO then check Cost for External work
  • Set Actual Dates for Milestones to Release Billing Plan dates
  • Execute Billing
  • Check Cost for Revenue generated via Billing
  • TECO Project
  • Generate Settlement Rule
  • Calculate Overhead and check cost reporting of overheads posted
  • Settlement
  • Check Cost Report after Settlement

16 of 130

Status

CRTD (Created)

17 of 130

Status

REL (Released)

SAVE

18 of 130

  • Create Operative Project copy from Standard WBS
  • Set Responsibility Cost Center (for Settlement)
  • Set Milestone Dates in the Operative Project
  • Release Project
  • Create Sales Order with Milestone Billing Plan
  • Check Revenue Report Planned via Sales Order
  • Debit Cost to Project Internal Work confirmation via ECP
  • Plan for External Work via ECP until PR and check Cost posted
  • PR to PO and GR to PO then check Cost for External work
  • Set Actual Dates for Milestones to Release Billing Plan dates
  • Execute Billing
  • Check Cost for Revenue generated via Billing
  • TECO Project
  • Generate Settlement Rule
  • Calculate Overhead and check cost reporting of overheads posted
  • Settlement
  • Check Cost Report after Settlement

19 of 130

User standard SD IDES order type

PS1

20 of 130

Sold-to-Part use

1600

Material T-20000

1

Press ENTER

21 of 130

Set $10,000 Sales Price in

Item - Condition

22 of 130

In the Item Detail

Account Assignment TAB

Enter WBS Element

E-1199

Click BACK

23 of 130

24 of 130

25 of 130

Select ALL

click COPY

26 of 130

Billing Plan dates, Values from Project Milestone

27 of 130

SAVE

28 of 130

Sales Order

15331

29 of 130

  • Create Operative Project copy from Standard WBS
  • Set Responsibility Cost Center (for Settlement)
  • Set Milestone Dates in the Operative Project
  • Release Project
  • Create Sales Order with Milestone Billing Plan
  • Check Revenue Report Planned via Sales Order
  • Debit Cost to Project Internal Work confirmation via ECP
  • Plan for External Work via ECP until PR and check Cost posted
  • PR to PO and GR to PO then check Cost for External work
  • Set Actual Dates for Milestones to Release Billing Plan dates
  • Execute Billing
  • Check Cost for Revenue generated via Billing
  • TECO Project
  • Generate Settlement Rule
  • Calculate Overhead and check cost reporting of overheads posted
  • Settlement
  • Check Cost Report after Settlement

30 of 130

Use GR55

to view

Plan Review via the Sales Order

31 of 130

Total Sales Review $10,000

(note Negative)

Cost Element

800000

Revenue GL

32 of 130

  • Create Operative Project copy from Standard WBS
  • Set Responsibility Cost Center (for Settlement)
  • Set Milestone Dates in the Operative Project
  • Release Project
  • Create Sales Order with Milestone Billing Plan
  • Check Revenue Report Planned via Sales Order
  • Debit Cost to Project Internal Work confirmation via ECP
  • Plan for External Work via ECP until PR and check Cost posted
  • PR to PO and GR to PO then check Cost for External work
  • Set Actual Dates for Milestones to Release Billing Plan dates
  • Execute Billing
  • Check Cost for Revenue generated via Billing
  • TECO Project
  • Generate Settlement Rule
  • Calculate Overhead and check cost reporting of overheads posted
  • Settlement
  • Check Cost Report after Settlement

33 of 130

Use IDES Cost Center & Activity Type

Version 0

Period 5 Year 2018 (depending)

Cost Center 4290

Activity Type 1421

Rate $100/Hour

34 of 130

Use Easy Cost Planning to Plan and Confirm Internal Works

35 of 130

Use IDES Costing Variant

PS06

36 of 130

For E-1100-2

Switch on

Costing Sheet Item VIew

37 of 130

Activity Type “E”

Cost Center 4290

Activity Type 1421

Quantity 20

Press ENTER

38 of 130

Back, SAVE

Note

Cost Element

619000

Read from KP26

$100/hour

Total $100 x 20 h

= $2000

39 of 130

Use GR55

to view

Plan Cost of Internal Works Planned via Easy Cost Planning

40 of 130

Total Internal Labor Cost

Total $100 x 20 h

= $2000

Cost Element

619000

41 of 130

Perform Internal Labor Confirmation via Easy Cost Planning tools

42 of 130

Select Execution Services

“Internal actiivty allocation”

43 of 130

44 of 130

Document Posted

45 of 130

Use GR55

to view

Plan Cost of Internal Works Planned via Easy Cost Planning

46 of 130

Actual Confirmation of Internal Activities Cost posted via ECP

47 of 130

  • Create Operative Project copy from Standard WBS
  • Set Responsibility Cost Center (for Settlement)
  • Set Milestone Dates in the Operative Project
  • Release Project
  • Create Sales Order with Milestone Billing Plan
  • Check Revenue Report Planned via Sales Order
  • Debit Cost to Project Internal Work confirmation via ECP
  • Plan for External Work via ECP until PR and check Cost posted
  • PR to PO and GR to PO then check Cost for External work
  • Set Actual Dates for Milestones to Release Billing Plan dates
  • Execute Billing
  • Check Cost for Revenue generated via Billing
  • TECO Project
  • Generate Settlement Rule
  • Calculate Overhead and check cost reporting of overheads posted
  • Settlement
  • Check Cost Report after Settlement

48 of 130

Prepare Material Group Purchasing Info Record

for MatGroup 00710

Vendor 1000

Pur.Org 1000

Plant 1000

Initial screen ME11

do not enter Material Group,

Press ENTER, then Enter Material Group Here

49 of 130

50 of 130

Material Group Info Record

5500000287

51 of 130

Plan External IT Services for E-1199-3

in

Easy Cost Planning

52 of 130

F4

Item Category “F”

Quantity 1

53 of 130

Double-click to select into ECP

54 of 130

Back, SAVE

55 of 130

Use GR55

to view

Plan Cost for External Activity

56 of 130

Plan Cost for External Activity

57 of 130

To generate PR for External Work Planned Earlier

58 of 130

59 of 130

Enter a valid Purchasing Group and POST

60 of 130

Note Purchase Requisition

61 of 130

Use GR55

to view

Commitment Cost (Internal) created due to the PR creation

62 of 130

At PR status, $3000 is Internal Commitment, click “Call up report”

63 of 130

64 of 130

Account Assignment “P”

65 of 130

  • Create Operative Project copy from Standard WBS
  • Set Responsibility Cost Center (for Settlement)
  • Set Milestone Dates in the Operative Project
  • Release Project
  • Create Sales Order with Milestone Billing Plan
  • Check Revenue Report Planned via Sales Order
  • Debit Cost to Project Internal Work confirmation via ECP
  • Plan for External Work via ECP until PR and check Cost posted
  • PR to PO and GR to PO then check Cost for External work
  • Set Actual Dates for Milestones to Release Billing Plan dates
  • Execute Billing
  • Check Cost for Revenue generated via Billing
  • TECO Project
  • Generate Settlement Rule
  • Calculate Overhead and check cost reporting of overheads posted
  • Settlement
  • Check Cost Report after Settlement

66 of 130

67 of 130

Note PO

4500017263

created

68 of 130

Use GR55

to view

Commitment Cost (EXternal) created due to the PO creation

69 of 130

PO now as External Commitment Cost

70 of 130

GR to PO

71 of 130

72 of 130

Note Material Document

5000000001

73 of 130

Use GR55

to view

Actual Cost posted due to the GR of External Activities

74 of 130

Actual Cost due to GR of External Activities,

click “Call up report”

75 of 130

76 of 130

77 of 130

  • Create Operative Project copy from Standard WBS
  • Set Responsibility Cost Center (for Settlement)
  • Set Milestone Dates in the Operative Project
  • Release Project
  • Create Sales Order with Milestone Billing Plan
  • Check Revenue Report Planned via Sales Order
  • Debit Cost to Project Internal Work confirmation via ECP
  • Plan for External Work via ECP until PR and check Cost posted
  • PR to PO and GR to PO then check Cost for External work
  • Set Actual Dates for Milestones to Release Billing Plan dates
  • Execute Billing
  • Check Cost for Revenue generated via Billing
  • TECO Project
  • Generate Settlement Rule
  • Calculate Overhead and check cost reporting of overheads posted
  • Settlement
  • Check Cost Report after Settlement

78 of 130

Milestones Billing Dates are BLOCKED as Actual WBS dates are yet to be reported

79 of 130

As an example, we will report Actual dates for all Milestones

80 of 130

Milestone#1

Report

Actual date

81 of 130

Milestone#2

Report

Actual date

82 of 130

Milestone#3

Report

Actual date

83 of 130

SAVE

84 of 130

  • Create Operative Project copy from Standard WBS
  • Set Responsibility Cost Center (for Settlement)
  • Set Milestone Dates in the Operative Project
  • Release Project
  • Create Sales Order with Milestone Billing Plan
  • Check Revenue Report Planned via Sales Order
  • Debit Cost to Project Internal Work confirmation via ECP
  • Plan for External Work via ECP until PR and check Cost posted
  • PR to PO and GR to PO then check Cost for External work
  • Set Actual Dates for Milestones to Release Billing Plan dates
  • Execute Billing
  • Check Cost for Revenue generated via Billing
  • TECO Project
  • Generate Settlement Rule
  • Calculate Overhead and check cost reporting of overheads posted
  • Settlement
  • Check Cost Report after Settlement

85 of 130

Once Actual Dates posted in WBS, Billing Plan dates are

Un-Blocked

86 of 130

Sales Order Doc,

Pree ENTER

87 of 130

SAVE

As All WBS with Milestones were reported with Actual Dates, All relevant Milestone Billing dates are now Un-Blocked for Billing

88 of 130

Note Billing Document created

89 of 130

Review Document Flow

90 of 130

Billing Document

91 of 130

  • Create Operative Project copy from Standard WBS
  • Set Responsibility Cost Center (for Settlement)
  • Set Milestone Dates in the Operative Project
  • Release Project
  • Create Sales Order with Milestone Billing Plan
  • Check Revenue Report Planned via Sales Order
  • Debit Cost to Project Internal Work confirmation via ECP
  • Plan for External Work via ECP until PR and check Cost posted
  • PR to PO and GR to PO then check Cost for External work
  • Set Actual Dates for Milestones to Release Billing Plan dates
  • Execute Billing
  • Check Cost for Revenue generated via Billing
  • TECO Project
  • Generate Settlement Rule
  • Calculate Overhead and check cost reporting of overheads posted
  • Settlement
  • Check Cost Report after Settlement

92 of 130

Check FI

postings

93 of 130

Debit Customer

Credit Revenue

94 of 130

Use GR55

to view

Revenue Posting against Cost Postings

95 of 130

-$10,000

shows Revenue Postings

96 of 130

  • Create Operative Project copy from Standard WBS
  • Set Responsibility Cost Center (for Settlement)
  • Set Milestone Dates in the Operative Project
  • Release Project
  • Create Sales Order with Milestone Billing Plan
  • Check Revenue Report Planned via Sales Order
  • Debit Cost to Project Internal Work confirmation via ECP
  • Plan for External Work via ECP until PR and check Cost posted
  • PR to PO and GR to PO then check Cost for External work
  • Set Actual Dates for Milestones to Release Billing Plan dates
  • Execute Billing
  • Check Cost for Revenue generated via Billing
  • TECO Project
  • Generate Settlement Rule
  • Calculate Overhead and check cost reporting of overheads posted
  • Settlement
  • Check Cost Report after Settlement

97 of 130

Set TECO

Current status

REL (Release)

98 of 130

SAVE

Current status

TECO (Technical Completion)

99 of 130

  • Create Operative Project copy from Standard WBS
  • Set Responsibility Cost Center (for Settlement)
  • Set Milestone Dates in the Operative Project
  • Release Project
  • Create Sales Order with Milestone Billing Plan
  • Check Revenue Report Planned via Sales Order
  • Debit Cost to Project Internal Work confirmation via ECP
  • Plan for External Work via ECP until PR and check Cost posted
  • PR to PO and GR to PO then check Cost for External work
  • Set Actual Dates for Milestones to Release Billing Plan dates
  • Execute Billing
  • Check Cost for Revenue generated via Billing
  • TECO Project
  • Generate Settlement Rule
  • Calculate Overhead and check cost reporting of overheads posted
  • Settlement
  • Check Cost Report after Settlement

100 of 130

Check Settlement Rules for

E-1199-1

E-1199-2

E-1199-3

101 of 130

102 of 130

Settlement Rule not yet created

103 of 130

Strategy 11 (see slide 103)

(see slide 104)

104 of 130

105 of 130

“3” is looking for Responsibility Cost Center

106 of 130

Account Assignment Based WBS will be Settled to Responsibility Cost Center

Billing based WBS will be settled to Profitability Segment

107 of 130

108 of 130

109 of 130

110 of 130

SETC = Settlement Rule Created

111 of 130

112 of 130

Responsibility Cost Center becomes the Settlement Receiver

113 of 130

  • Create Operative Project copy from Standard WBS
  • Set Responsibility Cost Center (for Settlement)
  • Set Milestone Dates in the Operative Project
  • Release Project
  • Create Sales Order with Milestone Billing Plan
  • Check Revenue Report Planned via Sales Order
  • Debit Cost to Project Internal Work confirmation via ECP
  • Plan for External Work via ECP until PR and check Cost posted
  • PR to PO and GR to PO then check Cost for External work
  • Set Actual Dates for Milestones to Release Billing Plan dates
  • Execute Billing
  • Check Cost for Revenue generated via Billing
  • TECO Project
  • Generate Settlement Rule
  • Calculate Overhead and check cost reporting of overheads posted
  • Settlement
  • Check Cost Report after Settlement

114 of 130

Use GR55

to view

the current Actual Overhead (not yet Calculated)

115 of 130

Next step is to calculate the Overheads

116 of 130

117 of 130

118 of 130

Overhead Calculations are done via a COSTING SHEET which will be dealt with at other Blog Posts.

119 of 130

Overheads calculated

120 of 130

  • Create Operative Project copy from Standard WBS
  • Set Responsibility Cost Center (for Settlement)
  • Set Milestone Dates in the Operative Project
  • Release Project
  • Create Sales Order with Milestone Billing Plan
  • Check Revenue Report Planned via Sales Order
  • Debit Cost to Project Internal Work confirmation via ECP
  • Plan for External Work via ECP until PR and check Cost posted
  • PR to PO and GR to PO then check Cost for External work
  • Set Actual Dates for Milestones to Release Billing Plan dates
  • Execute Billing
  • Check Cost for Revenue generated via Billing
  • TECO Project
  • Generate Settlement Rule
  • Calculate Overhead and check cost reporting of overheads posted
  • Settlement
  • Check Cost Report after Settlement

121 of 130

In our example, we shall be settling WBS E-1100-2

122 of 130

and also settling WBS E-1100-3

123 of 130

Settlement for E-1199-2 & E-1199-3 only

124 of 130

A Variant “Z” that includes only E-1199-2 & E-1199-3 to be Settled

125 of 130

126 of 130

127 of 130

  • Create Operative Project copy from Standard WBS
  • Set Responsibility Cost Center (for Settlement)
  • Set Milestone Dates in the Operative Project
  • Release Project
  • Create Sales Order with Milestone Billing Plan
  • Check Revenue Report Planned via Sales Order
  • Debit Cost to Project Internal Work confirmation via ECP
  • Plan for External Work via ECP until PR and check Cost posted
  • PR to PO and GR to PO then check Cost for External work
  • Set Actual Dates for Milestones to Release Billing Plan dates
  • Execute Billing
  • Check Cost for Revenue generated via Billing
  • TECO Project
  • Generate Settlement Rule
  • Calculate Overhead and check cost reporting of overheads posted
  • Settlement
  • Check Cost Report after Settlement

128 of 130

Use GR55

to view

Cost after Settlement

129 of 130

All costs in E-1199-2 Settled

130 of 130

All costs in E-1199-3 Settled