1 of 21

230 Everett St.

MARC SAVATSKY (617)388-9336; KARINA MEJIA 617-888-1217

EAST BOSTON, MA

2 of 21

230 Everett St.

  • Introduction
  • Zoning Review
  • Site Plan + Building Layout
  • Solar Study
  • Exterior Detail, Façade & Materiality Review
  • Open Discussion

  • Marc Savatsky (617)388-9336; Karina Mejia 617-888-1217

3 of 21

Locus Map

  • Marc Savatsky (617)388-9336; Karina Mejia 617-888-1217

4 of 21

Erect a 4-story, five (x5) unit bldg. including six (x6) off-street parking spaces and increased setback at front yard for planting area behind sidewalk. Roofdecks have been removed.

  • Marc Savatsky (617)388-9336; Karina Mejia 617-888-1217

5 of 21

Zoning Information

  • Marc Savatsky (617)388-9336; Karina Mejia 617-888-1217

6 of 21

Site + Landscaping

  • Marc Savatsky (617)388-9336; Karina Mejia 617-888-1217

Second Floor

Planting

Area

7 of 21

Third Floor

  • Marc Savatsky (617)388-9336; Karina Mejia 617-888-1217

Fourth Floor

8 of 21

9 of 21

10 of 21

11 of 21

12 of 21

13 of 21

RESILIENT DESIGN PRINCIPLES & STRATEGIES

  • Wet Floodproofing - Designing for the movement of water through a space, which equalizes hydrostatic pressure and helps prevent structural failure.

  • Locate Critical Systems (water heater, electrical panels, and other critical systems) above DFE

  • Materiality - Use flood-damage-resistant materials below DFE

14 of 21

Groundwater Mediation Approach

  • Recharge – Captures runoff roofs, driveway,s etc. & diverts it back to groundwater table.

  • Recharge Structures (Dry Wells) will be installed to collect all water from impervious surfaces

  • Infiltrate the first inch of stormwater times the impervious areas on site.

  • Pre & Post Construction Drainage Calculations (leave it better than you found it )

15 of 21

RESILIENT DESIGN PRINCIPLES & STRATEGIES

  • Wet Floodproofing - Designing for the movement of water through a space, which equalizes hydrostatic pressure and helps prevent structural failure.

  • Locate Critical Systems (water heater, electrical panels, and other critical systems) above DFE

  • Materiality - Use flood-damage-resistant materials below DFE

16 of 21

Groundwater Mgmt.

  • Stormwater Retention/Calculations: Must infiltrate the first inch of stormwater times the impervious areas on site.
  • Provide Pre & Post Construction Drainage Calculations (Increase in net impervious cover).
  • Reduce surface water runoff and water pollution

  • Marc Savatsky (617)388-9336; Karina Mejia 617-888-1217

17 of 21

Foundation Approach

  • Helical Piles

  • Marc Savatsky (617)388-9336; Karina Mejia 617-888-1217

18 of 21

Foundation Approach

  • Ductile Iron Pipes

  • Marc Savatsky (617)388-9336; Karina Mejia 617-888-1217

19 of 21

  • Marc Savatsky (617)388-9336; Karina Mejia 617-888-1217

20 of 21

  • Marc Savatsky (617)388-9336; Karina Mejia 617-888-1217

21 of 21

Feedback? Ideas & Suggestions?

Thank you!

  • Marc Savatsky (617)388-9336; Karina Mejia 617-888-1217