Insights from the Hill Air Force Base Resiliency Study
Easton Hopkins, PE
Steve Jones, PE
APA UT Fall Conference
September 9, 2026
HAFB – Water Resilience Study
HAFB – Water Resilience Study
https://sentinellandscapes.org/landscapes/great-salt-lake/#resources
Study to review water resilience in the region surrounding HAFB.
Develop “water budget”
Review:
HAFB – Water Resilience Study
OBJECTIVE
The goal of the study is to increase the resilience of HAFB and provide a reliable water supply to support operations, safeguard the riparian buffer, and ensure long-term sustainability.
This can be done by bolstering the resilience of the regional water supply and helping the surrounding environment
Phase 1:
Initial Assessment
Phase 2:
Implementation Strategy
WAIT…
There’s more that happened before this study — let’s rewind.
WHERE WE'RE HEADED TODAY
1
Mt. Nebo Groundwater Program
Why does a supply-first approach matter — and how do we work together?
2
M&I Conservation Opportunities
How do we bend the demand curve?
3
HAFB Water Resilience Study
A case study looking at both
MAIN MESSAGE
We need to work together to optimize our supply and demand
SUPPLY
Fixed
DEMAND
Can be altered
ONE FINITE SUPPLY, THREE COMPETING DEMANDS
FIXED SUPPLY
M&I
Agriculture
Environment (GSL)
Municipal & Industrial
Growth could add demand; conservation and smart land use planning bend the curve
Agriculture
Large water user — one of the biggest partner in stretching supply
Environment — Great Salt Lake
Receives what is left; shortfalls show up here first
The box cannot grow — more for one demand means less for another
*boxes not to scale*
ALIGNING DEVELOPMENT EXPECTATIONS WITH WATER REALITY
CASE STUDY: EAGLE MOUNTAIN CITY
Remaining Capacity
912,382,800 gallons
365 days
163 gcpm
Per capita assumption
15,335 people
Estimated Additional Population that can be Supported by Remaining Water Supply
Existing Population:
75,000
Transportation Master Plan
2060 Population Projection from UDOT:
152,500
Usage Period
SECTION 01
Groundwater Management
Mt. Nebo Water Agency
https://www.sciencedirect.com/science/article/pii/S0048969724006946
Danger
Zone
Empty
Full
Historic High
Healthy Operation
GROUNDWATER LEVEL GAUGE
Underused aquifer/increased evaporation
Path Forward
Data Collection
Model Development
Options Development
Technical Committee
Board Approval
GROUNDWATER PLAN COLLABORATION
Mt. Nebo Water Agency
Agriculture Community
Cities
Irrigation Companies
River Commissioner
SHORT AND LONG-TERM BENEFITS
Resilient & Optimized Sources
Community Partnerships
Cost Savings
Outputs of the Groundwater Management Program
1
Understand the aquifer condition and develop best management practices
2
Local water users collaborate in and own the program
3
Measure and monitor to make informed decisions
4
Updated annual groundwater management plan
5
A foundation for long-term surface, groundwater, and import water optimization for all users
Conclusions
Plan Around Available Supply
Build growth, land use, and development decisions around the water that is actually there. Supply is fixed.
Collaborate Regionally
Work with neighboring water users to optimize and stretch a limited, shared supply together.
SECTION 02
M&I Water Conservation Opportunities
Legislative Brief
~14 Pages
Appendix
~ 100+ pages
Two Pager
Links
Report
Fact Sheet
Recommendation
1
Develop water budgets based on water supply, demand, and depletion
2
Set an individual conservation goal
3
Utilize water conservation tools
DELIVERED THROUGH
Water policies
Water conservation programs
Historical Trends - Total Depletion
4%�INDOOR DEPLETION
AVERAGE: 2019–2023
INDOOR DEMAND
~280,000 ac-ft
OUTDOOR DEMAND
~415,000 ac-ft
INDOOR DEPLETION
~14,000 ac-ft
OUTDOOR DEPLETION
~333,000 ac-ft
Roughly 5% of indoor demand is depleted, compared with about 80% of outdoor demand.
Most water used indoors returns to Great Salt Lake, while most water used outside is depleted.
The Great Evaporator: Outdoor Water Use
50% total water �use depleted�through �evaporation
Existing Ratio
M&I Water Use Breakdown
40% �indoor
60% �outdoor
75% �indoor
25% �outdoor
15% total water �use depleted�through �evaporation
Future Predicted Ratio
The Great Evaporator: Outdoor Water Use
M&I diversion will increase but depletion needs to stay the same (or less).
Can only be achieved through depletion focused land use planning
Water Budget
A water budget balances water sources against water use within a basin — a fundamental input to water planning.
SOURCES
Surface Water
Diverted from streams and reservoirs
Groundwater
Pumped from the aquifer
DEMANDS
Municipal & Industrial
Diverted and depleted by cities
Agricultural
Diverted and depleted by irrigation
A balanced water budget must be maintained to support M&I and agriculture, especially as both sectors see ongoing shifts in land use, demand, and market dynamics.
Water Budgets
Region-specific depletion budgets would account for the constraints that different regions experience with water supply and demand
A maximum allowed depletion and minimum return flow should be balanced between M&I and agriculture
Existing
Future
Recommendations
Conclusions
We must work together to reduce depletion and preserve a limited water supply
Outdoor water demand
HIGH DEMAND
HIGH DEPLETION
Several strategies exist to reduce demand
Programs
Focused on reducing existing demands
Policies
Focused on reducing future demands
SECTION 03
HAFB Water Resilience Study
STUDY AREA
MASS BALANCE: SUPPLY & DEMAND
MASS BALANCE: SUPPLY & DEMAND
MASS BALANCE: SUPPLY & DEMAND
Runoff
MASS BALANCE: SUPPLY & DEMAND
700,000 ac-ft deficit
* GSL strike team report
Runoff
MASS BALANCE: SUPPLY & DEMAND
Great Salt Lake Basin
Weber Delta Region
MASS BALANCE: SUPPLY & DEMAND
2
5,000,000 ac-ft
precipitation runoff
700,000 ac-ft
depletion deficit
Great Salt Lake Basin
Weber Delta Basin
75,000 ac-ft
precipitation runoff
??? ac-ft
depletion deficit
10,500 ac-ft
depletion deficit
Weber Delta Deficit =
Water Supply
Groundwater
Average Recharge: 104,927 ac-ft/yr
Safe Yield: 52,464 ac-ft/yr
Average Well Discharge: 46,853 ac-ft/yr
WELLS
Wells built 1985 - 2025
Wells built prior to 1985
Surface Water
SURFACE WATER
| Volume (ac-ft) |
Estimated Annual Precipitation | 386,000 |
Preliminary Annual Runoff Volume | 73,000 |
Weber River | 327,000 |
Ogden River |
Preliminary estimates for runoff derived from study: HB 429 Great Salt Lake Stormwater Study by Hansen, Allen & Luce and Utah Division of Water Resources
https://water.utah.gov/wp-content/uploads/2024/02/GSL-Stormwater-Study-Report.pdf
SURFACE WATER
| Volume (ac-ft) |
Irrigation Production Estimate | 236,000 |
Drinking Water Sources | 32,000 |
Total | 268,000 |
Drinking water sources accounts for mostly municipal purchases from WBWCD, alongside some municipal sources
PRELIMINARY FINDINGS: SURFACE WATER
4
From PRISM datasets
Mean: 20.7 inches
PRELIMINARY FINDINGS: SURFACE WATER
PRELIMINARY FINDINGS: SURFACE WATER
Days
PRELIMINARY FINDINGS: SURFACE WATER
Days
PRELIMINARY FINDINGS: SURFACE WATER
267,000 ac-ft ≈ 268,000 ac-ft
Demand is usually equal to annual surface water supply.
Total Outdoor Use (M&I + Ag) ≈ Surface Water Supply
Any additional diversions would negatively impact the existing ecosystem
Water Rights Analysis
WATER RIGHTS ANALYSIS
Groundwater: 228,000 ± 29,200 ac-ft
Surface Water: 3.42 million ± 0.584 million ac-ft
Process:
WATER RIGHTS ANALYSIS
WATER RIGHTS ANALYSIS
Cumulative groundwater rights by year
Next Steps: Phase 2 Discussion
NEXT STEPS
Potential Options
NEXT STEPS
Water Conservation
Groundwater Recharge
Groundwater Management Program
Agricultural Optimization
Phragmites Removal
*Invasive species
Storm Drain Optimization
Education
Resilient
Water Supply
NEXT STEPS
Potential options, ranked by unit cost
1
Agricultural Optimization
$310 / ac-ft
2
Water Conservation
$1,250 / ac-ft
3
Phragmites Removal
$2,350 / ac-ft
4
Groundwater Recharge
$4,810 / ac-ft
Cost estimates pending
Groundwater Management Program
Storm Drain Optimization
Outreach
Questions?
Thank you
Steve Jones | 801-718-8217 | steve@halengineers.com
Easton Hopkins | 801-664-0901 | ehopkins@halengineers.com
WATER CONSERVATION
Conservation Programs | Unit Savings (ac-ft/irrigated acre) | Cost ($/ac-ft) |
Turf Conversion | 1.36 - 1.62 | $2,280 - $7,380 |
Weather-Based Irrigation Controllers | 0.31 - 1.00 | $30 - $510 |
Landscape Irrigation Audits | 0.23 – 0.79 | $30 - $1,060 |
Secondary Meters | 0 – 0.77 | $90 - $1020 |
Allotment-Based Tiered Rates | 0 – 1.55 | $90 - $1020 |
Unit Savings
(ac-ft / irrigated acre)
Cost
($ / ac-ft)
0
1.7
$0
$7,500
WATER CONSERVATION
WATER CONSERVATION
Secondary metering is required at the state level (much of this area already has it)
Tiered based rates will now have to be adopted. Savings will range from 0 to 20%.
Existing outdoor demand: ~110,000 ac-ft
Possible total reduction: 22,000 ac-ft
Existing average use per irrigated acre: ~4.0 ac-ft/irr-ac
Could be: 3.2 ac-ft/irr-ac
GROUNDWATER RECHARGE
Northern Utah County Aquifer Council
Managed Aquifer Recharge (MAR) Study
GROUNDWATER RECHARGE
Existing Groundwater Recharge: 105,000 ac-ft
Existing Groundwater Safe Yield: 52,500 ac-ft (1/2 of recharge)
Potential Increase in Recharge (15%): 15,750 ac-ft
Potential Increase in Safe Yield (15%): 7,850 ac-ft
* Could fill the gap
PRELIMINARY ESTIMATED COST: $7,500,000 to $144,000,000
Average: $75,750,000
GROUNDWATER MANAGEMENT PROGRAM
Framework from Mt. Nebo Water Agency Groundwater Management Program
Data Collection
- Collect data from member agencies
- Work on identifying large users and gathering their data
Model Development
- Update model with data
- Model existing and future ground water trends
Options Development
- Review management alternatives for short- and long-term goals
Technical Committee
- Meet once a year before the spring to review options
- Develop plan and agreements
Board Approval
- Review plan and vote for approval
Quick glance indicates that a lot of systems are looking to develop more groundwater supply
AGRICULTURAL OPTIMIZATION
Conservation Programs | Cost ($/ac-ft) |
Wheel-line to pivot LESA and LEPA | $176 - $209 |
MESA to LESA | $148 |
Wheel-line to SDI | $509 |
Alfalfa to winter wheat | $276 |
Alfalfa to corn | $424 |
https://water.utah.gov/wp-content/uploads/2026/05/GSL-BIP_AgWaterOptimizationReport_FINAL_2026-04-21.pdf
AGRICULTURAL OPTIMIZATION
Best options and preliminary cost to save 30,000 ac-ft
Irrigation System Upgrades
Convert inefficient systems to more efficient irrigation
~$133 – $508 per ac-ft saved
$4.0M – $15.25M
Switch Crop Type
Shift from alfalfa to corn / winter wheat
~$275 – $425 per ac-ft saved
$8.25M – $12.75M
PHRAGMITES REMOVAL
Unit savings: 2.07 ac-ft/acre
Cost: $610-$4,050 per ac-ft
STORM DRAIN OPTIMIZATION
Derive numbers from this study: https://water.utah.gov/wp-content/uploads/2024/02/GSL-Stormwater-Study-Report.pdf
STORM DRAIN OPTIMIZATION
Baseline Values
Assume 11,000 acres of ag develops
*LID helps with water quality concerns, while traditional SD does not
CONCLUSION
There is not enough water to support significantly more drinking water demand (maybe all demand)
Demand matches supply, and both are far below what is available through water rights
4
DEMAND��*RESULTS ARE PRELIMINARY, MAY CHANGE WITH FURTHER ANALYSIS*
DEMANDS
110,000 ac-ft
32,000 ac-ft
M&I
Ag
160,000 ac-ft
M&I: Indoor Demand
M&I: Outdoor Demand
Ag
Indoor Estimate: Based on end use meter data (sewer flows)
Outdoor Estimate: Based on remaining drinking water not used indoor & remaining secondary water not used for agriculture
Agriculture Estimate: Based on NDVI analysis
DEMANDS
M&I: Indoor Demand
M&I: Outdoor Demand
Ag
Total Water Demand
Drinking Water and Secondary Water Systems
Drinking Water
Secondary Water
M&I DEMANDS – SEWER FLOWS
Method | Component | Central Weber Water Improvement District | Central Davis Sewer District | North Davis Sewer District |
Approach 1: population and estimated flow per capita | People Served | - | 65,000 | 238,000 |
GPD/Person | 100 | 100 | 100 | |
Average Estimated Demand | 34 | 7,281 | 26,659 | |
Total | 33,974 | |||
Approach 2: measured sewer flows | Sewer Flow Estimates | 34 | 7,054 | 22,194 |
Total | 29,282 | |||
Average | 31,628 | |||
NDVI
M&I
Ag
Area: 27,500 acres
Demand: 107,000 ac-ft
4.02 ac-ft/irr-ac
Area: 46,200 acres
Demand: 160,000 ac-ft
3.47 ac-ft/irr-ac
NDVI
M&I
NDVI
Ag
AG DEMANDS
Process:
Total: 160,000 ac-ft