Today, we’re here to talk about water
Krish Emiliano Carlos Francisco IslanderHack 2026
AquaLoop AI
Water from air
Illustrative concept render
Team 67 Krish, Emiliano, Carlos, Francisco IslanderHack 2026
Surrounded by water
Freshwater is the challenge
~$1 billion
Inner Harbor desalination proposal
Big plans take time.
What can we do in the meantime?
Feb 2026 preliminary proposal: $978.77 million
Source: City of Corpus Christi
Corpus Christi, Texas. Illustrative coastal scene.
Water production, where people need it
50 gallons/day
Initial target per unit
Transparent modular enclosure
Purification and sealed storage
Concept render. 40 × 20 ft custom enclosure, not a standard shipping container. Engineering required.
Website demo: air into water
01
Air intake
Fans draw humid air
02
Air filtration
Filters remove particles
03
Condensation
Coils cool below dew point
04
Collection
Channels capture droplets
05
Purification
Sediment, carbon, UV, minerals
06
Storage
Sealed 150-gallon tank
07
Dispensing
Built-in bottle-filling tap
Drinking-water dispensing requires validated treatment, testing and safety approval.
One container. Then another.
Build
Transport
Install
Manufacture off-site
Move to suitable sites
Connect and commission
20 units
1,000 gallons/day
Proposed Corpus Christi network. Combined output target, subject to pilot results and site approvals.
Solar first. Gas when needed.
7.7
kW DC
14 standard 550 W panels
~31 kWh/day
Modeled solar generation
~114 kWh/day
Modeled AWG electricity demand
Long-term goal: 70% solar / 30% gas
Goal requires lower energy demand or more solar capacity
Planning model: 5 peak-sun-hours, 80% PV performance, 0.6 kWh/L. Actual energy needs vary.
More water from every unit of energy
Measure
Humidity and temperature
Solar and battery availability
Water storage and demand
Optimize
Choose favorable operating hours
Prioritize available solar
Coordinate battery and gas
The test: energy and cost per gallon
Proposed AI control. Simulated results do not establish measured savings.
The build plan
$167k–$465k
Previous estimate per unit
Includes manufacturing and installation labor,
equipment, transport and commissioning.
Budget needs revision for custom structure
and corrected solar specification.
4–8 months
First unit, engineering through deployment
6–12+ weeks
Repeat-unit construction
2–10 days
Transport
3–10 working days
On-site installation
1–4+ weeks
Commissioning
Preliminary planning ranges, not quotes or commitments. Phases may overlap.
A local bridge
to freshwater
AquaLoop AI
Water from air. Powered intelligently.
Krish Emiliano Carlos Francisco Team 01000011 (67)