Stars
Nuclei
Laboratory
Nuclear
Astrophysics
at CERN n_TOF
Expression of Interest for the CERN 20-year Roadmap of Non-Collider Physics
C. Domingo-Pardo, C. Lederer-Woods
on behalf of the n_TOF Collaboration
INTC Meeting · CERN, Geneva · 4 November 2026
CERN-INTC-2026-014 · INTC-EOI-002
Nuclear
Astrophysics
at CERN n_TOF
Expression of Interest for the CERN 20-year Roadmap of Non-Collider Physics
C. Domingo-Pardo, C. Lederer-Woods
on behalf of the n_TOF Collaboration
INTC Meeting · CERN, Geneva · 4 November 2026
CERN-INTC-2026-014 · INTC-EOI-002
3
Open questions on the origin of the heavy elements
4
(I) Stellar models and presolar grains
1xEoIs: EoI n_TOF facility upgrades, M.Bacak et al.
Programme: three physics pillars and the stations that serve them
5
(I) Stellar models and presolar grains
1xEoIs: EoI n_TOF facility upgrades, M.Bacak et al.
(II) s-process conditions in AGB and massive stars, first i-process nuclei
2xEoIs: EoI REAR, V. Alcayne et al.; EoI n_ACT, C. Lederer-Woods, A. Mengoni et al.
Programme: three physics pillars and the stations that serve them
6
(I) Stellar models and presolar grains
1xEoIs: EoI n_TOF facility upgrades, M.Bacak et al.
(II) s-process conditions in AGB and massive stars, first i-process nuclei
2xEoIs: EoI REAR, V. Alcayne et al.; EoI n_ACT, C. Lederer-Woods, A. Mengoni et al.
(III) i- and r-process nucleosynthesis
3xEoIs: EoI n_TOF facility upgrades, M.Bacak et al.; EoI n_ACT, C. Lederer-Woods, et al.; EoI ISR & Neutron Target, Y. Litvinov et al.
Programme: three physics pillars and the stations that serve them
7
Roadmap coverage of the s-, i- and r-process paths
Adapted from M. Wiedeking et al., Nat. Rev. Phys. (2025), doi:10.1038/s42254-025-00885-7
← Pillar I →
← Pillar II →
← Pillar III →
after 20y roadmap!
8
Courtesy of N. Liu
Pillar I · Presolar grains and stellar models need MACS to ≤5%
Presolar-grain isotope ratios are measured to a few ‰. Stellar models (AGB and massive-stars) have uncertainties of ≤5% → Nuclear data input also has to be accurate to the level of ≤5%
9
Figure courtesy of A. Mengoni
Pillar I · Many measured MACS still exceed 5% uncertainty
10
Only 129 of the 281 s-process isotopes in KADoNiS have MACS (kT = 30 keV) known to ≤5%. The remaining 152 are a priority of the 20-year roadmap.
Pillar I · Only 129 of 281 s-process isotopes are known to ≤5%
MACS uncertainty
11
EAR1
EAR2
Gen.#4 Target
Pillar I · Gen.#4 target and upgraded EAR1/EAR2 to close the gap
RMS < 2%
Roadmap priority: re-measure the ~150 isotopes still above 5% MACS uncertainty (Gen.#4 target, upgraded EARs).
12
Branching-point nuclei can be produced only in very small quantities. Existing TOF data typically cover a few % of the energy range relevant for stellar MACS (kT ≈ 5–100 keV).
Pillar II · Branching-point data cover a narrow energy range
94Nb(n,γ)
Measurements limited by:
13
DICER concept (LANL) → CERN
Pillar II · DICER-type transmission and REAR extend the reach
REAR beamlines
Scarce samples: DICER-type binocular transmission. En range limited by γ-flash and backgrounds: REAR low-background beamline.
14
Pillar II · Unmeasured s-process branchings within reach of REAR
A. Tarifeño-Saldivia et al., Phys. Rev. Accel. Beams (2026), doi:10.1103/5d87-m8bn
REAR beamlines
Backward extraction at REAR suppresses the γ-flash (>3× fewer prompt γ) and the high-energy neutron background, extending branching-point measurements in En.
15
Nuclear Astrophysics priorities:
Pillar II · n_ACT@BDF:
→ enables new data for s-branchings, first i-process cases and galactic radioactivities
→ world leading neutron flux in astrophysical keV range (>103 x a-NEAR flux )
16
Adapted from M. Wiedeking et al., Nat. Rev. Phys. (2025), doi:10.1038/s42254-025-00885-7
← Pillar III →
Pillar III · i/r-process nuclei are too short-lived for targets
17
Pillar III · Conventional TOF requires long-lived samples
neutron beam
t1/2 > yr
Radioactive target
>1014 atoms
n_TOF so far:
18
Pillar III · Inverse kinematics: stored ions + neutron target
neutron beam
t1/2 > yr
Radioactive target
>1014 atoms
neutron target
109 n/cm2
n_TOF so far:
New approach:
Stored Radioactive Ion Beam
108 ions, 100 kHz, 1013 ions/s
(t1/2 = s-min-yr)
19
Pillar III · Two implementation options at CERN
injection
2 GeV
PSB
RIB
Neutron
Target
compact cyclotron
R. Reifarth, Y. Litvinov et al., Phys. Rev. Accel. Beams 20, 044701 (2017); A. Tarifeño-Saldivia et al., Phys. Rev. Accel. Beams 29, 061601 (2026)
Free-Neutron Target via spallation and 9Be(p,xn)
Phys. Rev. Accel. Beams 29, 061601 (2026)
21
Impact · s-, i- and r-process paths run far from stability
22
Figures courtesy of I. Dillmann (TRIUMF)
Impact · Measured stellar (n,γ) data stay close to stability
Direct stellar-energy (n,γ) data exist almost only for stable and long-lived nuclei; the i- and r-process paths rely on theory.
23
Figures courtesy of I. Dillmann (TRIUMF)
Impact · ISR + neutron target opens (n,γ) far from stability
ISR & Neutron Target
ISR & Neutron Target
Stored Radioactive Ion Beam
108 ions, 100 kHz, 1013 ions/s
(t1/2 = s-min-yr)
neutron target
109 n/cm2
Stored beams on a neutron target reach short-lived s-process branchings, i-process waiting points and selected r-process freeze-out nuclei.
24
Why CERN · Neutron source, stations and ISOLDE on one site
Neutron source
PS beam on a Pb spallation target with a low duty cycle: white spectrum from meV to GeV, high instantaneous flux and high resolution
Stations
EAR1 (resolution), EAR2 (flux), NEAR (activation); n_ACT, REAR and DICER in the future
ISOLDE on site
Radioisotopically pure samples for branching points; high-intensity RIBs; a possible ISR coupled to a neutron target in the same complex
Expertise
High-accuracy cross section methodology, spallation-target design, neutron-beam collimation and RIB production: the prerequisites for the ISR concept
Track record
More than two decades of investment in the facility, detectors and trained personnel
No other facility combines all of these elements on one site.
Run 4
LS4 / Run 5
Beyond
2028
2031
2034
2037
2041
2044
2046
Pillar 1
Precision stable
isotope measurements
(Pillar 1)
²²Ne, ⁸⁶Sr, Ba chain (EAR1)
Ca isotopic chain (EAR1+EAR2+NEAR)
Ongoing stable isotope programme: high accuracy & high resolution
sTED, STAR operational
Pillar 2-3
Radioactive
branching
points, cosmochronology, and selected i-process nuclei
¹³⁵Cs NEAR
¹³⁴Cs EAR2
107Pd EAR1/EAR2
¹⁸¹,¹⁸²Hf EAR2+n_ACT
¹³⁷Cs CYCLING
s-process branchings EAR2 + NEAR (ISOLDE) + REAR
n_ACT@BDF: s-, i-process cases [BIAS, BEAS stations]
CYCLING installed
n_ACT operational
Pillar 3
i- and r-process nuclei in inverse
kinematics
ISR full
programme
s/i/r-process
LANSCE demo spallation n-target
CRYRING demo cyclotron-driven n-target
CRYRING/TRISR early science
Experimental validation
ISR construction
ISR conceptual design + approval
Pillar 1 — stable isotopes
Pillar 2 — radioactive nuclei
Pillar 3 — inverse kinematics
Key milestone
n_ACT@BDF: s-, i-process cases [BRIS rabbit station]
ISR + Neutron Target operational
Timeline
26
Summary
Objective
Measure the neutron-capture data needed to explain where the heavy elements come from: s-, i- and r-process
Scope
Three pillars: ~150 stable isotopes at <5%; radioactive s-branchings; short-lived i/r nuclei in inverse kinematics
Why CERN
n_TOF flux + resolution, ISOLDE samples and RIBs, n_ACT@BDF, storage-ring know-how: an ecosystem found nowhere else
Needs
Beam time; facility upgrades; n_ACT (~6 MCHF); REAR; ISR + neutron target (cost pending design)
Main challenge
Pillar III: from separate building blocks to a working ISR + neutron target, fundamental demo studies
Status
Pillars I–II ready and running into Run 4; Pillar III relies on n_Act and demonstrator phase (LANSCE, GSI)
27
BACKUP
28
Open questions · Example measurements
Sites and evolution
22Ne: neutron poison at low metallicity. 42–48Ca: several sites; 48Ca from supernovae or the i-process? 107Pd: galactic chemical evolution
Stellar conditions
s: 134,135Cs, 94Nb, 79Se, 147Pm, 163Ho, 171Tm, 179Ta, 205Pb. i: 137Cs, 144Ce, 90Sr, 75Ga, 80Ge, 85Br. r: 132Sn
Presolar grains and spectra
86Sr: ±10% MACS gives ~200‰ on δ(88Sr/86Sr), half the ~400‰ grain spread. 134–136Ba, 134Cs: δ(134,138Ba/136Ba). 94Nb: 94Mo in grains
Radioactivities and chronometers
181,182Hf (182Hf–182W), 205Pb (205Pb–205Tl), 107Pd (107Ag), 135Cs/133Cs in the Early Solar System. 60Fe, 182Hf via double capture at n_ACT
Beyond Pb/Bi and fission
Accurate Ns fixes the r-process residuals Nr = N⊙ − Ns. s-share of 206–208Pb, 209Bi sets the r-flow beyond Bi (next slide)
Big-Bang nucleosynthesis
7Be(n,α) and 7Be(n,p) measured at n_TOF with ISOLDE samples; full cosmological energy range at an ISR (7Be: 2.8×1010 ions/s)
Precise s-process data also test r-process yields, models and their reliability.
s-Process branching points: still a lot to do!
s-process path (blue) with the branching point at ¹⁴⁷Nd, compared with the i-process (green) and r-process (red) paths. Figure from [2], Fig. 2.
~60
branching points can be activated along the s-process path [1, 2]
21
flagged in [1] as priority TOF targets (Käppeler et al. 2011)
Branching flow
Neutron capture competes with β-decay on nuclei with half-lives of days or more.
Stellar probes
Set by temperature, electron and neutron density: ¹³⁴Ba/¹³⁶Ba, Rb, ⁹⁶Zr, ¹⁸²Hf.
Challenge to measure
TOF and activation usually need half-lives above a few years; MACS needed to ~10%.
[1] M. Lugaro, A. Chieffi, in Astrophysics with Radioactive Isotopes, ASSL 453, Springer (2018), Ch. 12, p. 643
[2] M. Lugaro, M. Pignatari, R. Reifarth, M. Wiescher, Annu. Rev. Nucl. Part. Sci. 73, 315 (2023)
Branching points turn s-process abundances into stellar probes.
Branching points (1/4) · From ³⁵S to ⁸⁵Kr
Isotope | T½ (lab → 300 MK) | Astrophysical relevance | n_TOF route |
³⁵S | 87 d | Rare ³⁶S in stars and S-rich meteorites | only ISR & NT |
³⁶Cl, ⁴¹Ca | 0.30 Myr; 0.10 Myr | Long-lived; ⁴¹Ca EC is T- and ρ-dependent | |
⁴⁵Ca | 163 d | Rare ⁴⁶Ca in Ca-rich meteoritic material | only ISR & NT |
⁵⁹Fe | 44.5 d | Production of long-lived ⁶⁰Fe | n_Act (double capture on 58Fe) |
⁶³Ni ★ | 101 yr → ≃12 yr | Rare ⁶⁴Ni and the ⁶⁵Cu/⁶³Cu ratio | |
⁶⁴Cu | 12.7 h | Comparable β⁺/β⁻ rates; ⁶⁴Ni and ⁶⁵Cu | only ISR & NT |
⁶⁵Zn | 244 d (β⁺) | Production of ⁶⁵Cu | only ISR & NT |
⁷¹Ge | 11.4 d (β⁺) | Production of ⁷¹Ga | only ISR & NT |
⁷⁹Se ★ | 0.33 Myr → ≃4 yr | Isomer gives T-dependence; ⁸¹Kr, ⁸¹Br/⁷⁹Br | Measured, EAR2 |
⁸⁰Br | 17.7 min | β⁺/β⁻ split; production of ⁸¹Kr | only ISR & NT |
⁸¹Kr ★ | 0.23 Myr → 2300 yr | Behaves as stable; decays to ⁸¹Br | ISR & NT |
⁸⁵Kr ★ | 10.7 yr | Opens at Nₙ > 5×10⁸ cm⁻³; ⁸⁶Kr, ⁸⁷Rb | ISR & NT |
★ Priority TOF candidates (Käppeler et al. 2011), as marked in [1] · T½ terrestrial; → value at 300 MK where given in [1]
n_TOF route: as proposed in the n_TOF post-LS4 White Book · NT = neutron target in a storage ring
[1] M. Lugaro, A. Chieffi, in Astrophysics with Radioactive Isotopes, ASSL 453, Springer (2018), Ch. 12, p. 643
⁸⁵Kr opens already at neutron densities above 5×10⁸ cm⁻³.
Branching points (2/4) · From ⁸⁶Rb to ¹⁴³Pr
Isotope | T½ (lab → 300 MK) | Astrophysical relevance | n_TOF route |
⁸⁶Rb | 18.6 d | Opens at Nₙ > 10¹⁰ cm⁻³; ⁸⁷Rb, Rb in stars | only ISR & NT |
⁸⁹,⁹⁰Sr, ⁹¹Y | 51 d; 29 yr; 59 d | Lowers ⁹⁰,⁹¹Zr vs ⁹²Zr; Zr in SiC grains | ⁸⁹Sr, ⁹¹Y: only ISR & NT |
⁹³Zr | 1.6 Myr | Behaves as stable; decays to ⁹³Nb | |
⁹⁵Zr ★ | 64 d | Opens at Nₙ > 5×10⁸ cm⁻³; ⁹⁶Zr in stars, SiC | only ISR & NT |
⁹⁴,⁹⁵Nb | 20 kyr → ≃9 d; 35 d | Bypasses the p-only ⁹⁴Mo | ⁹⁴Nb: measured, EAR2; n_ACT; ⁹⁵Nb: only ISR & NT |
⁹⁹Tc | 0.21 Myr → 4.5 yr | Mostly open; ⁹⁹Ru in SiC grains | |
¹⁰⁷Pd | 6.5 Myr → ≃700 yr | Behaves as stable; ¹⁰⁷Ag, ESS clock | EAR1 / EAR2 |
¹²⁸I | 25 min | β⁺/β⁻ split; s-only ¹²⁸Xe/¹³⁰Xe | only ISR & NT |
¹³³Xe | 5.2 d | ¹³⁴Xe; Xe-S component in SiC grains | only ISR & NT |
¹³⁴⁻¹³⁷Cs ★ | 2.1 yr; 2.3 Myr; 13 d; 30 yr | s-only ¹³⁴Ba/¹³⁶Ba; long-lived ¹³⁵Cs (★ ¹³⁴,¹³⁵Cs) | ¹³⁴: EAR2 + NEAR; ¹³⁵: NEAR; ¹³⁶: only ISR & NT; ¹³⁷: EAR2, CYCLING, n_ACT |
¹⁴¹Ce | 32.5 d | ¹⁴²Ce, skips s-only ¹⁴²Nd | only ISR & NT |
¹⁴²,¹⁴³Pr | 19 h → ≃4 d; 13.6 d | Skips ¹⁴²,¹⁴³Nd; Nd isotopes | only ISR & NT |
★ Priority TOF candidates (Käppeler et al. 2011), as marked in [1] · T½ terrestrial; → value at 300 MK where given in [1]
n_TOF route: as proposed in the n_TOF post-LS4 White Book · NT = neutron target in a storage ring
[1] M. Lugaro, A. Chieffi, in Astrophysics with Radioactive Isotopes, ASSL 453, Springer (2018), Ch. 12, p. 643
The Cs chain spans EAR2, NEAR, CYCLING and n_ACT.
Branching points (3/4) · From ¹⁴⁷Nd to ¹⁷⁷Lu
Isotope | T½ (lab → 300 MK) | Astrophysical relevance | n_TOF route |
¹⁴⁷Nd ★ | 11 d | r-only ¹⁴⁸Nd; Nd in SiC grains | only ISR & NT |
¹⁴⁷,¹⁴⁸Pm ★ | 2.6 yr → ≃1 yr; 5.4 d | Skips ¹⁴⁷Sm, s-only ¹⁴⁸Sm; Sm in SiC | ¹⁴⁷: NEAR; ¹⁴⁸: only ISR & NT |
¹⁵¹Sm ★ | 90 yr → ≃3 yr | Strong T-dependence; ¹⁵³Eu/¹⁵¹Eu | Measured (2004) |
¹⁵³Sm | 46 h | ¹⁵⁴Sm; ¹⁵³Eu/¹⁵¹Eu ratio | only ISR & NT |
¹⁵²Eu | 13.5 yr | T,ρ-dependent β±; p-only ¹⁵²Gd | |
¹⁵⁴,¹⁵⁵Eu ★ | 8.6 yr → ≃11 d; 4.8 yr | Gd isotopes in SiC grains | ¹⁵⁵: NEAR |
¹⁵³Gd ★ | 240 d (longer in stars) | β⁺ decay slows in stars; ¹⁵³Eu/¹⁵¹Eu | only ISR & NT |
¹⁶³Dy, ¹⁶³,¹⁶⁴Ho | stable; 4.6 kyr; 29 min | ¹⁶³Dy unstable in stars; s-process ¹⁶⁴Er (★ ¹⁶³Ho) | ¹⁶³Ho: CYCLING, n_ACT; ¹⁶⁴Ho: only ISR & NT |
¹⁶⁹Er | 9.4 d | Neutron-rich ¹⁷⁰Er | only ISR & NT |
¹⁷⁰,¹⁷¹Tm ★ | 129 d; 1.9 yr | Skips ¹⁷¹,¹⁷²Yb; Yb in SiC grains | ¹⁷⁰: only ISR & NT; ¹⁷¹: n_ACT |
¹⁷⁶Lu | 38 Gyr (isomer 3.7 h) | Isomer coupling; s-only ¹⁷⁶Lu/¹⁷⁶Hf | |
¹⁷⁷Lu | 6.6 d | Makes ¹⁷⁸Hf, lowers ¹⁷⁷Hf | only ISR & NT |
★ Priority TOF candidates (Käppeler et al. 2011), as marked in [1] · T½ terrestrial; → value at 300 MK where given in [1]
n_TOF route: as proposed in the n_TOF post-LS4 White Book · NT = neutron target in a storage ring
[1] M. Lugaro, A. Chieffi, in Astrophysics with Radioactive Isotopes, ASSL 453, Springer (2018), Ch. 12, p. 643
Short-lived rare-earth branchings need ISR & NT.
Branching points (4/4) · From ¹⁷⁹Hf to ²¹⁰Po
Isotope | T½ (lab → 300 MK) | Astrophysical relevance | n_TOF route |
¹⁷⁹Hf, ¹⁷⁹,¹⁸⁰Ta | stable → ≃40 yr; 1.8 yr | Rarest nucleus ¹⁸⁰ᵐTa (★ ¹⁷⁹Ta) | ¹⁷⁹Ta: CYCLING |
¹⁸¹Hf | 42 d | ¹⁸²Hf → ¹⁸²W early Solar System clock | EAR2, n_Act |
¹⁸²,¹⁸³Ta | 115 d; 5.1 d | W isotopes in SiC grains | only ISR & NT |
¹⁸⁵W ★ | 75 d | ¹⁸⁶W, ¹⁸⁶Os/¹⁸⁸Os; W, Os in SiC | only ISR & NT |
¹⁸⁶Re | 89 h | ¹⁸⁶Os, ¹⁸⁶W, ¹⁸⁷Re (Re–Os clock) | only ISR & NT |
¹⁹¹Os | 15 d → ≃8 d | Os isotopes in meteorites; ¹⁹³Ir | only ISR & NT |
¹⁹²Ir | 74 d | ¹⁹³Ir; rare proton-rich ¹⁹²Pt | only ISR & NT |
¹⁹³Pt | 50 yr (β⁺) | Production of ¹⁹³Ir | |
²⁰⁴Tl ★ | 3.8 yr → ≃7 d | Strong T-dependence; s-only ²⁰⁴Pb | |
²⁰⁵Pb | 17 Myr | T,ρ-dependent EC; ESS clock | EAR2 / NEAR (ISOLDE) |
²¹⁰Bi | 5.0 d | ²¹¹Bi → ²⁰⁷Pb; end of the s process | only ISR & NT |
²¹⁰Po | 138 d | ²¹¹Po → ²⁰⁷Pb; end of the s process | only ISR & NT |
Do not open (T½ drops below days in stars): ¹⁰³Ru, ¹²³Sn, ¹²⁴Sb, ¹⁵⁶Eu, ¹⁶⁰Tb ★ (ISR & NT), ¹⁶¹Tb, ¹⁷⁵Yb, ¹⁹⁸Au, ²⁰⁵Hg
★ Priority TOF candidates (Käppeler et al. 2011), as marked in [1] · T½ terrestrial; → value at 300 MK where given in [1]
n_TOF route: as proposed in the n_TOF post-LS4 White Book · NT = neutron target in a storage ring
[1] M. Lugaro, A. Chieffi, in Astrophysics with Radioactive Isotopes, ASSL 453, Springer (2018), Ch. 12, p. 643
¹⁸¹Hf links s-process branchings to Solar System chronology.
Scientific motivation & impact: s-process branchings
Cases for a high-flux TOF facility (FRANZ)
Unmeasurable
Partially measured / Very Challenging
Fully measured
Unmeasurable
The i-process …
Scientific motivation & impact: i-process
Unmeasurable
The r-process …
Scientific motivation & impact: r-process
Why at CERN?
Component | CERN | Other facilities |
RIB Facility | ✅ | ❌ (✅) |
Spallation target/expertise | ✅ | ✅ (❌) |
Storage Ring | (✅) → ISR (this EoI) | ❌ (✅/❌) |
38
Resources
>40
institutes in the n_TOF Collaboration
~6 MCHF
n_ACT capital (Class 3 estimate, 3 stations)
4–5 weeks
beam per radioactive branching case at EAR2
Personnel
Equipment investments
Beam time & operations
CERN-led: facility & target, n_ACT@BDF, ISR Collaboration-led: detectors, samples, analysis, personnel
39
Scenarios & priorities
BASELINE
Existing areas + planned upgrades
Needs: EAR1, EAR2, NEAR, CYCLING, GEAR, Gen.#4 target
Delivers
I
II (part)
ENHANCED
+ n_ACT@BDF and REAR
Needs: n_ACT (~6 MCHF, from ~2032); REAR installed in LS4
Delivers
I
II
III (i)
FULL AMBITION
+ ISR & neutron target
Needs: ISR at HIE-ISOLDE coupled to a free-neutron target
Delivers
I
II
III
Each step is a separable package with its own EoI; the baseline already delivers Pillar I and part of Pillar II.
40
Complementarity & competition
Alternatives elsewhere
n_TOF / CERN edge
Partners & complementarity
Pillar I
Stable isotopes in s-process
Pillar II
s-branchings and first i-process
Pillar III
Inverse kinematics (short-lived i- and r-process)
Theory is no substitute: TALYS, NON-SMOKER, SMARAGD uncertainties for branchings and i-process nuclei reach factors of 2–10, versus the ±5% stellar models need.
41
Feasibility, risks & milestones
Pillar I: stable isotopes
MATURE
Pillar II: branching points
DEMONSTRATED
Pillar III: inverse kinematics
HIGHEST RISK / RETURN
Run 4
LANSCE spallation n-target demonstrator
Run 4
CRYRING@ESR full-system proof of principle
LS4 / Run 5
ISR conceptual design + approval
~2040
First radioactive-beam inverse-kinematics measurement
2041+
ISR full s/i/r-process programme
Storage-Ring options for a future “production” facility
42
K. Pak, B. Davids, and Y. K. Kim, Nuclear Engineering and Technology 57, 103392 (2025), arXiv:2312.11859 [physics.acc-ph].
See INTC EoI by C. Domingo-Pardo, Y. Litvinov
A. Tarifeño-Saldivia et al., Phys. Rev. Accel. Beams 29 (2026), https://doi.org/10.1103/5d87-m8bn
Free-Neutron Target via spallation and 9Be(p,xn)
Phys. Rev. Accel. Beams 29, 061601 (2026)
Why at CERN? Isolde Storage Ring (ISR)
Neutron target
Stray ions due to charge-exchange reactions with residual gas can collide only with the dipoles of the ring (not in the straight sections).
Catchers at the dipoles are commonly used to remove these ions, so they are not a problem, both if they are long-lived or short-lived. They can be removed easily. For radioactive beams one adds removable inserts and local shielding, so the activity can be taken out between campaigns.
Realistic examples for neutron-capture at the ring:
η = 1e9 n/cm² → neutron density objective, both spallation/cyclotron
ISR = 1e8 ions → number of stored ions / space-charge limit ISR
f ≈ 100 kHz at ~100 keV/u → revolution frequency in the ring
I = 1e8 x 1e5 = 1e13 ions/s → particle current through the ring
Luminosity = η·I = 1e22 cm⁻²s⁻¹ → reaction luminosity
Reaction rate:
R = L · σ · t = 1e22 cm⁻²s⁻¹ × σ[mb] × 1e-27 cm²/mb × 24h·3600s
R ≈ 0.86 × σ[mb] counts/day
Measuring time for 10% statistical uncertainty:
σ = 5 mb → ~4 counts/day → ~23 days → Just one data point may be OK
σ = 10 mb → ~9 counts/day → ~12 days
σ = 50 mb → ~43 counts/day → ~2.3 days (~56 h) → Scan a few points
σ = 100 mb → ~86 counts/day → ~1.2 days (~28 h)
σ = 500 mb → ~430 counts/day → ~5.6 hours → Fully scan the CS in the energy range
46
Summary
Goal: quantify the contributions of the s-, i- and r-processes to the heavy elements with laboratory (n,γ) data.
Three pillars
47
Summary
Why at CERN