miniTimeCube
University of Maryland
W.F. McDonough, K. Engel, S.A. Wipperfurth
University of Hawaii
R. Dorrill, A. Druetzler, M.J. Duvall, J. Koblanski, J.G. Learned, V.A. Li, L. Macchiarulo, S. Matsuno, S. Negrashov, M. Rosen, M. Sakai, G.S. Varner
Ultralytics
G. Jocher, K. Nishimura
NIST
H.P. Mumm
NGA
S.M. Usman
Applied Antineutrino Physics
Liverpool, UK
December 2, 2016
miniTimeCube (mTC) Concept
J. Learned - mTC @ AAP2016 Liverpool
2
12/2/2015
mTC Scintillator
J. Learned - mTC @ AAP2016 Liverpool
3
12/2/2015
mTC Photodetectors: MCP-PMTs
J. Learned - mTC @ AAP2016 Liverpool
4
12/2/2015
Timing distribution from
IEEE Trans Nucl Sci. 2010 Sep 13; 57(5): 2417–2423.
Partially populated mTC.
Expected IBD Prompt & Delayed Signals
J. Learned - mTC @ AAP2016 Liverpool
5
12/2/2015
Readout Electronics Requirements
J. Learned - mTC @ AAP2016 Liverpool
6
12/2/2015
information from MCP-PMTs.
*Example MCP-PMT pulse (not Planacon)
Front-end Readout ASIC
J. Learned - mTC @ AAP2016 Liverpool
7
12/2/2015
Front-end Electronics Packages
J. Learned - mTC @ AAP2016 Liverpool
8
12/2/2015
System Electronics
J. Learned - mTC @ AAP2016 Liverpool
9
12/2/2015
Clock and trigger distribution board
Auxiliary Systems
J. Learned - mTC @ AAP2016 Liverpool
10
12/2/2015
mTC chiller
Laser coupling to mTC
Laser diode, attenuators, face selection
Ongoing Calibrations
J. Learned - mTC @ AAP2016 Liverpool
11
12/2/2015
Measured muon event
Best fit reconstruction
PRELIMINARY
PRELIMINARY
Preliminary relative gain map
Reconstructed muon parameters
Deployment at NCNR
🡺 ~1 detected neutrino per day.
J. Learned - mTC @ AAP2016 Liverpool
12
12/2/2015
mTC in various venues
Background Simulations
J. Learned - mTC @ AAP2016 Liverpool
13
12/2/2015
Unshielded HPGe gamma background spectra
Reconstruction & Efficiency
🡺 Overall efficiency ~30%.
J. Learned - mTC @ AAP2016 Liverpool
14
12/2/2015
*Results shown in this talk are for a maximum likelihood fit to two point sources to the prompt, delayed vertices.
Reconstruction Efficiency vs. ν Energy
Simulated Energy Resolution (1)
J. Learned - mTC @ AAP2016 Liverpool
15
12/2/2015
Simulated Energy Resolution (2)
J. Learned - mTC @ AAP2016 Liverpool
16
12/2/2015
Simulated Vertex Resolution & Pointing
J. Learned - mTC @ AAP2016 Liverpool
17
12/2/2015
Directionality Performance Comparisons
arXiv:1307.2832.
J. Learned - mTC @ AAP2016 Liverpool
18
12/2/2015
mTC Cave Installation (April 2016)
mTC Workstation
Completely Remote Operation Capable
Laser, Muon and Source Calibrations
PRELIMINARY
A scan with the “simple trigger”
Muon Track Reconstructions in Matlab
mTC Schedule and Outlook
J. Learned - mTC @ AAP2016 Liverpool
23
12/2/2015
Upgraded electronics timing distributions
mTC in (mostly) assembled cave
σ ~ 33 ps
Summary of mTC
Completed NIST Run in October 2016 and returned equipment to UH
Currently doing tests and PMT studies in new lab at UH
Finish analysis and publish data coming soon.
Soon (month) to make neutron (Ca) source runs.
- 2017 Repurpose mTC Electronics for LAPPD tests, Neutron Camera and NuLat