STATUS OF LIFTS ,ESCALATORS &FOB’S UNDER ABSS

2 of 43

ABSS stations

Sr. No.

Name of Stations

PHASE I Already sanction

PHASE II To be proposed

Lift

Escalator

Lift

Escalator

1

Hadapsar

2

3

0

0

2

Akurdi

0

4

0

0

3

Kolhapur

2

4

0

0

4

Satara

1

3

2

3

5

Sangli

0

0

3

4

6

Talegaon

3

1

0

0

7

Chinchwad

3

0

0

0

8

Dehu road

0

0

4

6

9

Hatkanangle

0

0

2

2

10

Belapur

0

0

1

2

11

Kopargaon

0

0

3

2

12

Ahmednagar

0

0

3

4

13

Daund

0

0

2

4

 

Total

11

15

20

27

Non ABSS Stations

1

Patas

0

0

2

2

2

Malavli

0

0

2

2

3

Khadki

0

0

6

8

 

Total

0

0

10

12

 

 

 

 

 

 

Grand Total

11

15

30

39

3 of 43

S N

Name of station

TDC FOR LIFT/ ESCALATOR

TDC FOR FOB

S N

Name of station

TDC FOR LIFT/ ESCALATOR

TDC FOR FOB

1

Kedgaon

NA

NA

11

Sangli

31.05.26

31.05.26

2

Lonand

NA

NA

12

Satara

31.05.26

31.02.26

3

Phaltan

NA

NA

13

Kolhapur

30.06.26

31.03.26

4

Baramati

NA

NA

14

Kopargaon

Planned in Phase-2

30.09.26

5

Wathar

NA

NA

15

Belapur

Planned in Phase-2

30.09.26

6

Karad

NA

NA

16

Ahmednagar

Planned in Phase-2

30.09.26

7

Hadapsar

28.02.26

Completed

17

Dehu Road

Planned in Phase-2

NA

8

Chinchwad

31.03.26

FOB (extn only)

31.03.26

18

Uruli

NA

NA

9

Akurdi

Escalator-31.03.26

31.03.26

19

Hathkangale

Planned in Phase-2

NA

10

Talegaon

� 31.05.26

31.03.26

20

Daund

Planned in Phase-2

NA

Amrit Station (Lifts, Escalator, FOB Works) Status Pune GSU

4 of 43

CHINCHWAD (Lift & Escalator Status)

Civil

Material Availability Yes/No

Progress

Remarks

Lift-1 Main Entry

Yes

100 %

​

Lift-2 on PF-1 &2

Yes

55 %

Johnson WIP & after completion of Johnson work, balance civil will be completed

​

Lift-3 on PF-3&4

Yes

55%

Johnson WIP & after completion of Johnson work, balance civil will be completed

Lift-4 at Second Entry

Yes

10%

WIP

Escalator-1 at Main Entry(Up Direction)

Yes

100%

​

Escalator-2 at Second Entry

Yes

15%

Work is held up due to 800 mm height issue

Electrical

Material Availability Yes/No

Progress

Remarks

Lift-1 at Main Entry

Yes

95 %

Testing WIP

Lift-2 on PF-1&2

Yes

40 %

Lift Installation WIP

Lift-3 on PF-3&4

Yes

20%

Lift Installation WIP

Lift-4 at second Entry

No

0%

Civil Work is balance

Escalator -1 at Main Entry(Single Direction)

Yes

100%

Handover Done

Escalator-2 at Second Entry(Single Direction)

No

0%

800 mm Height Issue

Design & Drawings Status

Yes/No

Remarks

GAD of Civil

No

​

GAD of Lift & Esc

Yes

​

GFC Drawings of Civil

Yes

​

GFC Drawings of Lift & Esc

Yes

​

5 of 43

CHINCHWAD (FOB Extension Status)

Design & Drawings Status

Yes/No

Remarks

GAD

No

​

RDSO Drawings

NA

Design & Drawing is in contractor Scope

TAD

NA

​

DCN

NA

​

FOB Extention (6m x 9.5m)

Work Description

Material Availability Yes/No

Progress %

Remarks

Foundation 04 nos

Yes

100%

​

Pedestal 04 nos

Yes

10%

​

Column Erection

Yes

Nil

Fabrication WIP

Girder Launching

No

Nil

Fabrication WIP

Deck Sheet fixing

No

Nil

​

Casting of Slab

No

Nil

​

Roofing structural members

No

Nil

​

Roof sheet fixing

No

Nil

​

Granite flooring

No

Nil

​

​

​

​

​

6 of 43

CHINCHWAD LIFT / ESCALATOR (Completed Photos)

�Lift No: 01 & Escalators No: 01 �Location: Waiting Area �

7 of 43

�Lift No: 02 �Location: At Platform No.1 and 2�

CHINCHWAD LIFT / ESCALATOR (Work in progress photos)

8 of 43

�Lift No. : 03 �Location: At Platform No 3 & 4

CHINCHWAD LIFT / ESCALATOR (Work in progress photos)

9 of 43

�Lift No: 04 & Escalators No: 02 �Location: At Second Entry UP side

CHINCHWAD LIFT / ESCALATOR (Work in progress photos)

10 of 43

TALEGAON (Lift & Escalator Status)

Civil ````

Material Availability Yes/No

Progress %

Remarks

Lift 1 on PF1 (DN Side)

Yes

60%

​

Lift 2 on PF2

No

Not Yet Started

Exact Location to be Finalized

Lift 3 at second entry side (UP Side)

Yes

60%

Required FOB Extension

Escalator 1 on PF1 (DN Side)

Yes

55%

Required FOB Extension

Escalator 2 on PF2

No

Not Yet Started

Exact Location to be Finalized

Escalator 3 at second entry side (UP Side)

No

62%

​

Electrical

Material Availability Yes/No

Progress %

Remarks

Lift 1 on PF1 (DN Side)

No

0%

Queuing length WIP

Lift 2 on PF2

No

Not Yet Started

Exact Location to be Finalized

Lift 3 at second entry side (UP Side)

No

0%

Work is held up due to FOB Extension

Escalator 1 on PF1 (DN Side)(Single Direction)

Yes

0%

Queuing Lenth completed ,hoisting is balance due to manpower

Escalator 2 on PF2(Single Direction)

No

Not Yet Started

Work could not initiate due to Relay Room, shifting to be done

Escalator 3 at second entry side (UP Side)(Single Direction)

Yes

20%

Hoisting Work Completed

Design & Drawings Status

Availibility Yes/No

Remarks

GAD of Civil

No

​

GAD of Lift & Esc

Yes

​

GFC Drawings of Civil

Yes

​

GFC Drawings of Lift & Esc

Yes

​

11 of 43

TALEGAON (FOB Status)

Design & Drawings Status

Availibility Yes/No

Remarks

GAD

Yes

​

RDSO Drawings

Yes

​

TAD

No

Not Submitted By Contractor yet

DCN

No

​

MAIN FOB (6m x 39.3)

Work Description

Material Availability Yes/No

Progress %

Remarks

Foundation

Yes

80%

04 nos Foundation balance due to unavailability of Design & Drawing

Pedestal

Yes

80 %

​

Column Erection

No

Nil

Column Shifted to HDP Sky Walk, New Column Fabrication in progress

Girder Launching

No

Nil

Fabrication WIP

Deck Sheet fixing

No

Nil

​

Casting of Slab

No

Nil

​

Roofing structural members

No

Nil

​

Roof sheet fixing

No

Nil

​

Granite flooring

No

Nil

​

​

​

​

​

12 of 43

LIFT No. 1 & ESCALATOR 1

TALEGAON LIFT / ESCALATOR (Work in progress photos)

13 of 43

�Lift No: 3�Location: Near FOB

TALEGAON LIFT / ESCALATOR (Work in progress photos)

14 of 43

Escalators No: 3�Location: Rear Entrance�

TALEGAON LIFT / ESCALATOR (Work in progress photos)

15 of 43

AKURDI (Lift & Escalator Status)

Civil

Material Availability Yes/No

Progress %

Remarks

Lifts

NA

NA

​

Escalator at PF-1

No

Yet To Start

​

Escalator at PF-2

No

Yet To Start

​

Electrical

Material Availability Yes/No

Progress %

Remarks

Lifts

NA

NA

​

Escalator at PF-1(Both Direction)

No

Yet To Start

​

Escalator at PF-2(Both Direction)

No

Yet To Start

​

​

​

​

​

Design & Drawings Status

Availibility Yes/No

Remarks

GAD of Civil

Yes

​

GAD of Lift & Esc

No

​

GFC Drawings of Civil

No

​

GFC Drawings of Lift & Esc

No

​

16 of 43

AKURDI (FOB Status)

Design & Drawings Status

Availibility Yes/No

Remarks

GAD

Yes

​

RDSO Drawings

Yes

​

TAD

WIP

Divisional approval is done & HQ Approval is balance

DCN

No

​

MAIN FOB (12m x 34m )

Work Description

Material Availability Yes/No

Progress %

Remarks

Foundation

Yes

100%

​

Pedestal

Yes

100%

​

Column Erection

Yes

100%

​

Girder Launching

Yes

Nil

​

Deck Sheet fixing

No

Nil

​

Casting of Slab

No

Nil

​

Roofing structural members

No

Nil

​

Roof sheet fixing

No

Nil

​

Granite flooring

No

Nil

​

​

​

​

​

17 of 43

AKURDI (Ramps Status)

RAMPS (1.7m Width ) at PF No. 01

Work Description

Material Availability Yes/No

Progress %

Remarks

Foundation

Yes

100%

​

Pedestal

Yes

100%

​

Column Erection

No

Nil

​

Cross Beam

No

Nil

​

Deck Sheet fixing

No

Nil

​

Casting of Slab

No

Nil

​

Roofing structural members

No

Nil

​

Roof sheet fixing

No

Nil

​

Chequered Tiles

No

Nil

​

​

​

​

​

RAMPS (1.7m Width ) at PF No. 02

Work Description

Material Availability Yes/No

Progress %

Remarks

Foundation

Yes

100%

​

Pedestal

Yes

100%

​

Column Erection

No

Nil

​

Cross Beam

No

Nil

​

Deck Sheet fixing

No

Nil

​

Casting of Slab

No

Nil

​

Roofing structural members

No

Nil

​

Roof sheet fixing

No

Nil

​

Chequered Tiles

No

Nil

​

​

​

​

​

18 of 43

AKURDI FOB(Work in progress photos)

FOB

19 of 43

HADAPSAR (Lift & Escalator Status)

Civil

Material Availability Yes/No

Progress %

Remarks

Skywalk

Yes

100%

​

Lift at Circulating Area

Yes

30 %

​

Lift at PF-1 to New FOB

Yes

Not Yet Started

GAD Submitted in e-DAS for divisional approval

Lift at PF-1 to Old FOB

Yes

Not Yet Started

GAD Submitted in e-DAS for divisional approval

Lift at PF-2&3 to Old FOB

Yes

Not Yet Started

GAD Submitted in e-DAS for divisional approval

02 Escalators at Circulating Area

Yes

25%

​

01 Escalators at PF-2&3 to New FOB

Yes

Not yet Started

GAD Submitted in e-DAS for divisional approval

Electrical

Material Availability Yes/No

Progress %

Remarks

Lift at Circulating Area

Yes

0%

​

Lift at PF-1 to New FOB

​

0%

​

Lift at PF-1 to Old FOB

​

0%

​

Lift at PF-2&3 to Old FOB

​

0%

​

02 Escalators at Circulating Area

Yes

0%

​

01 Escalators at PF-2&3 to New FOB

​

0 %

​

Design & Drawings Status

Availibility Yes/No

Remarks

GAD of Civil

Yes

​

GAD of Lift & Esc

Yes

​

GFC Drawings of Civil

Yes

​

GFC Drawings of Lift & Esc

Yes

​

20 of 43

HADAPSAR (FOB Status)

Design & Drawings Status

Availibility Yes/No

Remarks

GAD

Yes

​

RDSO Drawings

Yes

​

TAD

Yes

​

DCN

yes

​

MAIN FOB 12mx 32.575m

Work Description

Material Availability Yes/No

Progress %

Remarks

Foundation

Yes

100%

​

Column Erection

Yes

100%

​

Girder Launching

Yes

100%

​

Deck Sheet fixing

Yes

100%

​

Casting of Slab

Yes

100%

​

Roofing structural members

Yes

100%

​

Roof sheet fixing

Yes

100%

​

Granite flooring

Yes

100%

​

​

​

​

​

21 of 43

HADAPSAR (Ramps & Skywalks/ Staircase Status)

RAMPS (1.5m Width) at PF No. 01 & Ramp ( 2.5m Width) at PF No. 02 & 03

Work Description

Material Availability Yes/No

Progress %

Remarks

Foundation

Yes

100%

​

Column Erection

Yes

100%

​

Cross Beam

Yes

100%

​

Deck Sheet fixing

Yes

100%

​

Casting of Slab

Yes

100%

​

Roofing structural members

Yes

100%

​

Roof sheet fixing

Yes

100%

​

Chequered Tiles

Yes

100%

​

​

​

​

​

SKYWALK (6M X73.82 Including 3m width staircase)

Work Description

Material Availability Yes/No

Progress %

Remarks

Foundation

Yes

100%

​

Column Erection

Yes

100%

​

Cross Beam

Yes

100%

​

Deck Sheet fixing

Yes

100%

​

Casting of Slab

Yes

100%

​

Roofing structural members

Yes

80%

Staircase & Esc Members are balance

Roof sheet fixing

Yes

80%

Staircase & Esc Roof Covering Is Balance

Chequered Tiles

Yes

100%

​

​

​

​

​

22 of 43

HADAPSAR (Completed photos)

FOB

FOB RAMP

23 of 43

HADAPSAR (Work in progress photos)

SKYWALK

SKY WALK STAIRCASE

24 of 43

SATARA (Lift & Escalator Status)

Civil

Material Availability Yes/No

Progress %

Remarks

Lift at PF-1

No

Nil

​

Lift at PF-2&3

No

Nil

​

Lift at PF 3&4

No

Nil

​

Escalator at PF-1

No

Nil

​

Escalator at PF-2&3

No

Nil

​

Escalator at PF – 4&5

No

Nil

​

Electrical

Material Availability Yes/No

Progress %

Remarks

Lift at PF-1

No

No

​

Lift at PF-2&3

No

No

​

Lift at PF 3&4

No

No

​

Escalator at PF-1(Both Directon)

No

No

​

Escalator at PF-2&3(Both Direction)

No

No

​

Escalator at PF – 4&5(Both Direction)

No

No

​

​

​

​

​

​

​

​

​

Design & Drawings Status

Availibility Yes/No

Remarks

GAD of Civil

No

​

GAD of Lift & Esc

No

​

GFC Drawings of Civil

No

​

GFC Drawings of Lift & Esc

No

​

25 of 43

SATARA (FOB Status)

Design & Drawings Status

Availibilty Yes/No

Remarks

GAD

Yes

​

RDSO Drawings

Yes

​

TAD

WIP

Divisional approval is done & HQ Approval is balance

​

DCN

No

​

MAIN FOB (12m x 41.88m)

Work Description

Material Availability Yes/No

Progress %

Remarks

Foundation 36 nos

Yes

100%

​

Pedestal

Yes

100%

​

Column Erection 36 nos

Yes

100%

​

Girder Launching 22 Nos

Yes

Nil

​

Deck Sheet fixing

No

​

​

Casting of Slab

No

​

​

Roofing structural members

No

​

​

Roof sheet fixing

No

​

​

Granite flooring

No

​

​

​

​

​

​

26 of 43

SATARA (Staircase Status)

STAIRCASE (4.2m Width) at PF NO. 01

Work Description

Material Availability Yes/No

Progress

Remarks

Foundation 03 nos

Yes

100

​

Pedestal

Yes

60%

Pedestal Final Lift is balance

​

Column Erection

No

Nil

Fabrication WIP

Cross Beam

No

Nil

Fabrication WIP

Deck Sheet fixing

No

Nil

​

Casting of Slab

No

Nil

​

Roofing structural members

No

Nil

​

Roof sheet fixing

No

Nil

​

Chequered Tiles

No

Nil

​

​

​

​

​

27 of 43

RAMPS (1500m)at PF NO. 02 & 03

Work Description

Material Availability Yes/No

Progress

Remarks

Foundation 21 Nos

Yes

100%

​

Pedestal

Yes

100%

​

Column Erection

Nil

Nil

​

Cross Beam

Nil

Nil

​

Deck Sheet fixing

Nil

Nil

​

Casting of Slab

Nil

Nil

​

Roofing structural members

Nil

Nil

​

roof sheet fixing

Nil

Nil

​

Chequered Tiles

Nil

Nil

​

​

​

​

​

RAMPS (1500m)at PF NO. 04 & 05

Work Description

Material Availability Yes/No

Progress

Remarks

Foundation 21 Nos

Yes

80%

02 Sets balance due to Electric Store Room & OHE Portal,Shifting to be done

Pedestal

Yes

80%

​

Column Erection

No

Nil

​

Cross Beam

No

Nil

​

Deck Sheet fixing

No

Nil

​

Casting of Slab

No

Nil

​

Roofing structural members

No

Nil

​

roof sheet fixing

No

Nil

​

Chequered Tiles

No

Nil

​

​

​

​

​

SATARA (Ramps Status)

28 of 43

SATARA (Work in progress photos)

FOB RAMP AT PF NO 1

29 of 43

SATARA (Work in progress photos)

FOB work at PF No: 2&3�

30 of 43

KOLHAPUR (Lift & Escalator Status)

Design & Drawings Status

Availibility Yes/No

Remarks

GAD of Civil

Yes

​

GAD of Lift & Esc

No

​

GFC Drawings of Civil

No

​

GFC Drawings of Lift & Esc

No

​

Electrical

Material Availability Yes/No

Progress %

Remarks

Lift at PF-1

No

Nil

​

Lift at PF-2

No

Nil

​

Escalator at PF-1(Both Direction)

No

Nil

​

Escalator at PF2(Both Direction)

No

Nil

​

​

​

​

​

​

​

​

​

Civil

Material Availability Yes/No

Progress %

Remarks

Lift at PF-1

No

Nil

​

Lift at PF-2

No

Nil

​

Escalator at PF-1

No

Nil

​

Escalator at PF2

No

Nil

​

31 of 43

KOLHAPUR (FOB Status)

Design & Drawings Status

Availibility Yes/No

Remarks

GAD

Yes

​

RDSO Drawings

Yes

​

TAD

WIP

Divisional approval is done & HQ Approval is balance

​

DCN

No

​

MAIN FOB (12m x 26.710)

Work Description

Material Availability Yes/No

Progress %

Remarks

Foundation 36 nos

Yes

100%

​

Pedestal 36 nos

Yes

100%

​

Column Erection 36 nos

Yes

80%

PF-1 & 2 02 nos balance & PF3 06 nos are balance

Girder Launching 28 nos

Yes

Nil

Cross Girder is also Balance

Deck Sheet fixing

No

Nil

​

Casting of Slab

No

Nil

​

Roofing structural members

NO

NIl

Fabrication WIP

Roof sheet fixing

No

Nil

​

Granite flooring

No

NIl

​

​

​

​

​

32 of 43

STAIRCASE (4.2m Width)

Work Description

Material Availability Yes/No

Progress %

Remarks

Foundation 24 nos

Yes

100%

​

Pedestal

Yes

100%

​

Column Erection

Yes

?

​

Cross Beam

Yes

Nil

​

Deck Sheet fixing

No

Nil

​

Casting

No

Nil

​

Roofing structural members

No

Nil

​

Roof sheet fixing

No

Nil

​

Chequered Tiles

No

NIL

​

​

​

​

​

33 of 43

FOB Location: Near Existing FOB Connecting PF1/2 TO PF 3

KOLHAPUR FOB (work in progress photos)

34 of 43

���FOB Location: Near Existing FOB Connecting PF1/2 TO PF 3�

KOLHAPUR FOB (work in progress photos)

35 of 43

FOB Location: Near Existing FOB Connecting PF1/2 TO PF 3

KOLHAPUR FOB (work in progress photos)

36 of 43

SANGLI (Lift & Escalator Status)

Design & Drawings Status

Availibility Yes/No

Remarks

GAD of Civil

Yes

​

GAD of Lift & Esc

No

​

GFC Drawings of Civil

No

​

GFC Drawings of Lift & Esc

No

​

Electrical

Material Availability Yes/No

Progress %

Remarks

Construction of Civil Works For Escalator

No

Nil

​

Lift at PF-1

No

Nil

​

Lift at PF 2&3

No

Nil

​

Lift at PF 4&5

No

Nil

​

Escalator at PF1(Both Direction)

No

Nil

​

Escalator at PF 2&3(Single Direction)

No

Nil

​

Escalator at 4&5(Single Direction)

No

Nil

​

Civil

Material Availability Yes/No

Progress %

Remarks

Construction of Civil Works For Escalator

No

Nil

​

Lift at PF-1

No

Nil

​

Lift at PF 2&3

No

Nil

​

Lift at PF 4&5

No

Nil

​

Escalator at PF1

No

Nil

​

Escalator at PF 2&3

No

Nil

​

Escalator at 4&5

No

NIl

​

37 of 43

SANGLI (FOB Status)

Design & Drawings Status

Availibility Yes/No

Remarks

GAD

Yes

​

RDSO Drawings

Yes

​

TAD

WIP

Under Divisional Approval

DCN

No

​

MAIN FOB (12m x 42.33)

Work Description

Material Availability Yes/No

Progress &

Remarks

Foundation 36 nos

Yes

100 %

​

Pedestal 36 nos

Yes

100%

​

Column Erection 36 nos

Yes

100%

​

Girder Launching 28 nos

Yes

Nil

​

Deck Sheet fixing

No

Nil

​

Casting of Slab

No

Nil

​

Roofing structural members

Yes

Nil

​

Roof sheet fixing

No

Nil

​

Granite flooring

No

Nil

​

​

​

​

​

38 of 43

STAIRCASE (1.5m Width) at PF No. 02 & 03

Work Description

Material Availability Yes/No

Progress %

Remarks

Foundation 06 nos

Yes

75%

04 nos are balamce due to OHE Portal

​

Pedestal 06 nos

Yes

75%

​

Column Erection

Yes

70%

​

Cross Beam

No

Nil

​

Deck Sheet fixing

No

Nil

​

Casting

No

Nil

​

Roofing structural members

No

Nil

​

Roof sheet fixing

Yes

Nil

​

Chequeret Tiles

No

Nil

​

STAIRCASE (1.5m Width) at PF No. 04 & 05

Work Description

Material Availability Yes/No

Progress %

Remarks

Foundation 06 nos

Yes

70%

04 nos are balamce due to OHE Portal

​

Pedestal 06 nos

Yes

70%

​

Column Erection 06 nos

Yes

35%

​

Cross Beam

No

Nil

​

Deck Sheet fixing

No

Nil

​

Casting

No

Nil

​

Roofing structural members

Yes

Nil

​

Roof sheet fixing

No

Nil

​

Chequered Tiles

No

Nil

​

STAIRCASE (4m Width) at PF No. 01

Work Description

Material Availability Yes/No

Progress %

Remarks

Foundation 24 nos

Yes

80%

04 nos are balamce due to OHE Portal

​

Pedestal 24 nos

Yes

80%

​

Column Erection 24 nos

Yes

70%

​

Cross Beam

No

Nil

​

Deck Sheet fixing

No

Nil

​

Casting

No

Nil

​

Roofing structural members

Yes

Nil

​

Roof sheet fixing

No

Nil

​

Chequered Tiles

No

Nil

​

​

​

​

​

SANGLI (Staircase Status)

39 of 43

GOOD SHEDS FOB (3mx 51.2m)

Work Description

Material Availability Yes/No

Progress %

Remarks

Foundation 02 nos

No

Nil

​

Column Erection 16 nos

No

Nil

​

Cross Beam

No

Nil

​

Deck Sheet fixing

No

Nil

​

Casting of Slab

No

Nil

​

Roofing structural members

No

Nil

​

Roof sheet fixing

NO

Nil

​

Granite Flooring

NO

Nil

​

​

​

​

​

Design & Drawings Status

Availibility Yes/No

Remarks

GAD

Yes

​

RDSO Drawings

No

Design is in Contractor Scope

TAD

NA

​

DCN

NA

​

Goods shed FOB & Ramps work status

RAMPS (2.2m Width) AT GOOD SHEDS

Work Description

Material Availability Yes/No

Progress %

Remarks

Foundation 24 nos

No

Nil

​

Column Erection 24 nos

No

Nil

​

Cross Beam

No

Nil

​

Deck Sheet fixing

No

Nil

​

Casting of Slab

No

Nil

​

Roofing structural members

No

Nil

​

Roof sheet fixing

No

Nil

​

Chequered Tiles

No

Nil

​

​

​

​

​

40 of 43

FOB AT PF NO. 1

SANGLI FOB (work in progress photos)

41 of 43

FOB AT PF NO. 2/3

SANGLI FOB (work in progress photos)

42 of 43

FOB WORK AT PF NO.4/5

SANGLI FOB (work in progress photos)

43 of 43

THANKS