1 of 43

STATUS OF LIFTS ,ESCALATORS &FOB’S UNDER ABSS

2 of 43

ABSS stations

Sr. No.

Name of Stations

PHASE I Already sanction

PHASE II To be proposed

Lift

Escalator

Lift

Escalator

1

Hadapsar

2

3

0

0

2

Akurdi

0

4

0

0

3

Kolhapur

2

4

0

0

4

Satara

1

3

2

3

5

Sangli

0

0

3

4

6

Talegaon

3

1

0

0

7

Chinchwad

3

0

0

0

8

Dehu road

0

0

4

6

9

Hatkanangle

0

0

2

2

10

Belapur

0

0

1

2

11

Kopargaon

0

0

3

2

12

Ahmednagar

0

0

3

4

13

Daund

0

0

2

4

 

Total

11

15

20

27

Non ABSS Stations

1

Patas

0

0

2

2

2

Malavli

0

0

2

2

3

Khadki

0

0

6

8

 

Total

0

0

10

12

 

 

 

 

 

 

Grand Total

11

15

30

39

3 of 43

S N

Name of station

TDC FOR LIFT/ ESCALATOR

TDC FOR FOB

S N

Name of station

TDC FOR LIFT/ ESCALATOR

TDC FOR FOB

1

Kedgaon

NA

NA

11

Sangli

31.05.26

31.05.26

2

Lonand

NA

NA

12

Satara

31.05.26

31.02.26

3

Phaltan

NA

NA

13

Kolhapur

30.06.26

31.03.26

4

Baramati

NA

NA

14

Kopargaon

Planned in Phase-2

30.09.26

5

Wathar

NA

NA

15

Belapur

Planned in Phase-2

30.09.26

6

Karad

NA

NA

16

Ahmednagar

Planned in Phase-2

30.09.26

7

Hadapsar

28.02.26

Completed

17

Dehu Road

Planned in Phase-2

NA

8

Chinchwad

31.03.26

FOB (extn only)

31.03.26

18

Uruli

NA

NA

9

Akurdi

Escalator-31.03.26

31.03.26

19

Hathkangale

Planned in Phase-2

NA

10

Talegaon

� 31.05.26

31.03.26

20

Daund

Planned in Phase-2

NA

Amrit Station (Lifts, Escalator, FOB Works) Status Pune GSU

4 of 43

CHINCHWAD (Lift & Escalator Status)

Civil

Material Availability Yes/No

Progress

Remarks

Lift-1 Main Entry

Yes

100 %

Lift-2 on PF-1 &2

Yes

55 %

Johnson WIP & after completion of Johnson work, balance civil will be completed

Lift-3 on PF-3&4

Yes

55%

Johnson WIP & after completion of Johnson work, balance civil will be completed

Lift-4 at Second Entry

Yes

10%

WIP

Escalator-1 at Main Entry(Up Direction)

Yes

100%

Escalator-2 at Second Entry

Yes

15%

Work is held up due to 800 mm height issue

Electrical

Material Availability Yes/No

Progress

Remarks

Lift-1 at Main Entry

Yes

95 %

Testing WIP

Lift-2 on PF-1&2

Yes

40 %

Lift Installation WIP

Lift-3 on PF-3&4

Yes

20%

Lift Installation WIP

Lift-4 at second Entry

No

0%

Civil Work is balance

Escalator -1 at Main Entry(Single Direction)

Yes

100%

Handover Done

Escalator-2 at Second Entry(Single Direction)

No

0%

800 mm Height Issue

Design & Drawings Status

Yes/No

Remarks

GAD of Civil

No

GAD of Lift & Esc

Yes

GFC Drawings of Civil

Yes

GFC Drawings of Lift & Esc

Yes

5 of 43

CHINCHWAD (FOB Extension Status)

Design & Drawings Status

Yes/No

Remarks

GAD

No

RDSO Drawings

NA

Design & Drawing is in contractor Scope

TAD

NA

DCN

NA

FOB Extention (6m x 9.5m)

Work Description

Material Availability Yes/No

Progress %

Remarks

Foundation 04 nos

Yes

100%

Pedestal 04 nos

Yes

10%

Column Erection

Yes

Nil

Fabrication WIP

Girder Launching

No

Nil

Fabrication WIP

Deck Sheet fixing

No

Nil

Casting of Slab

No

Nil

Roofing structural members

No

Nil

Roof sheet fixing

No

Nil

Granite flooring

No

Nil

6 of 43

CHINCHWAD LIFT / ESCALATOR (Completed Photos)

Lift No: 01 & Escalators No: 01 �Location: Waiting Area

7 of 43

Lift No: 02 �Location: At Platform No.1 and 2�

CHINCHWAD LIFT / ESCALATOR (Work in progress photos)

8 of 43

Lift No. : 03 �Location: At Platform No 3 & 4

CHINCHWAD LIFT / ESCALATOR (Work in progress photos)

9 of 43

�Lift No: 04 & Escalators No: 02 �Location: At Second Entry UP side

CHINCHWAD LIFT / ESCALATOR (Work in progress photos)

10 of 43

TALEGAON (Lift & Escalator Status)

Civil ````

Material Availability Yes/No

Progress %

Remarks

Lift 1 on PF1 (DN Side)

Yes

60%

Lift 2 on PF2

No

Not Yet Started

Exact Location to be Finalized

Lift 3 at second entry side (UP Side)

Yes

60%

Required FOB Extension

Escalator 1 on PF1 (DN Side)

Yes

55%

Required FOB Extension

Escalator 2 on PF2

No

Not Yet Started

Exact Location to be Finalized

Escalator 3 at second entry side (UP Side)

No

62%

Electrical

Material Availability Yes/No

Progress %

Remarks

Lift 1 on PF1 (DN Side)

No

0%

Queuing length WIP

Lift 2 on PF2

No

Not Yet Started

Exact Location to be Finalized

Lift 3 at second entry side (UP Side)

No

0%

Work is held up due to FOB Extension

Escalator 1 on PF1 (DN Side)(Single Direction)

Yes

0%

Queuing Lenth completed ,hoisting is balance due to manpower

Escalator 2 on PF2(Single Direction)

No

Not Yet Started

Work could not initiate due to Relay Room, shifting to be done

Escalator 3 at second entry side (UP Side)(Single Direction)

Yes

20%

Hoisting Work Completed

Design & Drawings Status

Availibility Yes/No

Remarks

GAD of Civil

No

GAD of Lift & Esc

Yes

GFC Drawings of Civil

Yes

GFC Drawings of Lift & Esc

Yes

11 of 43

TALEGAON (FOB Status)

Design & Drawings Status

Availibility Yes/No

Remarks

GAD

Yes

RDSO Drawings

Yes

TAD

No

Not Submitted By Contractor yet

DCN

No

MAIN FOB (6m x 39.3)

Work Description

Material Availability Yes/No

Progress %

Remarks

Foundation

Yes

80%

04 nos Foundation balance due to unavailability of Design & Drawing

Pedestal

Yes

80 %

Column Erection

No

Nil

Column Shifted to HDP Sky Walk, New Column Fabrication in progress

Girder Launching

No

Nil

Fabrication WIP

Deck Sheet fixing

No

Nil

Casting of Slab

No

Nil

Roofing structural members

No

Nil

Roof sheet fixing

No

Nil

Granite flooring

No

Nil

12 of 43

LIFT No. 1 & ESCALATOR 1

TALEGAON LIFT / ESCALATOR (Work in progress photos)

13 of 43

Lift No: 3�Location: Near FOB

TALEGAON LIFT / ESCALATOR (Work in progress photos)

14 of 43

Escalators No: 3�Location: Rear Entrance

TALEGAON LIFT / ESCALATOR (Work in progress photos)

15 of 43

AKURDI (Lift & Escalator Status)

Civil

Material Availability Yes/No

Progress %

Remarks

Lifts

NA

NA

Escalator at PF-1

No

Yet To Start

Escalator at PF-2

No

Yet To Start

Electrical

Material Availability Yes/No

Progress %

Remarks

Lifts

NA

NA

Escalator at PF-1(Both Direction)

No

Yet To Start

Escalator at PF-2(Both Direction)

No

Yet To Start

Design & Drawings Status

Availibility Yes/No

Remarks

GAD of Civil

Yes

GAD of Lift & Esc

No

GFC Drawings of Civil

No

GFC Drawings of Lift & Esc

No

16 of 43

AKURDI (FOB Status)

Design & Drawings Status

Availibility Yes/No

Remarks

GAD

Yes

RDSO Drawings

Yes

TAD

WIP

Divisional approval is done & HQ Approval is balance

DCN

No

MAIN FOB (12m x 34m )

Work Description

Material Availability Yes/No

Progress %

Remarks

Foundation

Yes

100%

Pedestal

Yes

100%

Column Erection

Yes

100%

Girder Launching

Yes

Nil

Deck Sheet fixing

No

Nil

Casting of Slab

No

Nil

Roofing structural members

No

Nil

Roof sheet fixing

No

Nil

Granite flooring

No

Nil

17 of 43

AKURDI (Ramps Status)

RAMPS (1.7m Width ) at PF No. 01

Work Description

Material Availability Yes/No

Progress %

Remarks

Foundation

Yes

100%

Pedestal

Yes

100%

Column Erection

No

Nil

Cross Beam

No

Nil

Deck Sheet fixing

No

Nil

Casting of Slab

No

Nil

Roofing structural members

No

Nil

Roof sheet fixing

No

Nil

Chequered Tiles

No

Nil

RAMPS (1.7m Width ) at PF No. 02

Work Description

Material Availability Yes/No

Progress %

Remarks

Foundation

Yes

100%

Pedestal

Yes

100%

Column Erection

No

Nil

Cross Beam

No

Nil

Deck Sheet fixing

No

Nil

Casting of Slab

No

Nil

Roofing structural members

No

Nil

Roof sheet fixing

No

Nil

Chequered Tiles

No

Nil

18 of 43

AKURDI FOB(Work in progress photos)

FOB

19 of 43

HADAPSAR (Lift & Escalator Status)

Civil

Material Availability Yes/No

Progress %

Remarks

Skywalk

Yes

100%

Lift at Circulating Area

Yes

30 %

Lift at PF-1 to New FOB

Yes

Not Yet Started

GAD Submitted in e-DAS for divisional approval

Lift at PF-1 to Old FOB

Yes

Not Yet Started

GAD Submitted in e-DAS for divisional approval

Lift at PF-2&3 to Old FOB

Yes

Not Yet Started

GAD Submitted in e-DAS for divisional approval

02 Escalators at Circulating Area

Yes

25%

01 Escalators at PF-2&3 to New FOB

Yes

Not yet Started

GAD Submitted in e-DAS for divisional approval

Electrical

Material Availability Yes/No

Progress %

Remarks

Lift at Circulating Area

Yes

0%

Lift at PF-1 to New FOB

0%

Lift at PF-1 to Old FOB

0%

Lift at PF-2&3 to Old FOB

0%

02 Escalators at Circulating Area

Yes

0%

01 Escalators at PF-2&3 to New FOB

0 %

Design & Drawings Status

Availibility Yes/No

Remarks

GAD of Civil

Yes

GAD of Lift & Esc

Yes

GFC Drawings of Civil

Yes

GFC Drawings of Lift & Esc

Yes

20 of 43

HADAPSAR (FOB Status)

Design & Drawings Status

Availibility Yes/No

Remarks

GAD

Yes

RDSO Drawings

Yes

TAD

Yes

DCN

yes

MAIN FOB 12mx 32.575m

Work Description

Material Availability Yes/No

Progress %

Remarks

Foundation

Yes

100%

Column Erection

Yes

100%

Girder Launching

Yes

100%

Deck Sheet fixing

Yes

100%

Casting of Slab

Yes

100%

Roofing structural members

Yes

100%

Roof sheet fixing

Yes

100%

Granite flooring

Yes

100%

21 of 43

HADAPSAR (Ramps & Skywalks/ Staircase Status)

RAMPS (1.5m Width) at PF No. 01 & Ramp ( 2.5m Width) at PF No. 02 & 03

Work Description

Material Availability Yes/No

Progress %

Remarks

Foundation

Yes

100%

Column Erection

Yes

100%

Cross Beam

Yes

100%

Deck Sheet fixing

Yes

100%

Casting of Slab

Yes

100%

Roofing structural members

Yes

100%

Roof sheet fixing

Yes

100%

Chequered Tiles

Yes

100%

SKYWALK (6M X73.82 Including 3m width staircase)

Work Description

Material Availability Yes/No

Progress %

Remarks

Foundation

Yes

100%

Column Erection

Yes

100%

Cross Beam

Yes

100%

Deck Sheet fixing

Yes

100%

Casting of Slab

Yes

100%

Roofing structural members

Yes

80%

Staircase & Esc Members are balance

Roof sheet fixing

Yes

80%

Staircase & Esc Roof Covering Is Balance

Chequered Tiles

Yes

100%

22 of 43

HADAPSAR (Completed photos)

FOB

FOB RAMP

23 of 43

HADAPSAR (Work in progress photos)

SKYWALK

SKY WALK STAIRCASE

24 of 43

SATARA (Lift & Escalator Status)

Civil

Material Availability Yes/No

Progress %

Remarks

Lift at PF-1

No

Nil

Lift at PF-2&3

No

Nil

Lift at PF 3&4

No

Nil

Escalator at PF-1

No

Nil

Escalator at PF-2&3

No

Nil

Escalator at PF – 4&5

No

Nil

Electrical

Material Availability Yes/No

Progress %

Remarks

Lift at PF-1

No

No

Lift at PF-2&3

No

No

Lift at PF 3&4

No

No

Escalator at PF-1(Both Directon)

No

No

Escalator at PF-2&3(Both Direction)

No

No

Escalator at PF – 4&5(Both Direction)

No

No

Design & Drawings Status

Availibility Yes/No

Remarks

GAD of Civil

No

GAD of Lift & Esc

No

GFC Drawings of Civil

No

GFC Drawings of Lift & Esc

No

25 of 43

SATARA (FOB Status)

Design & Drawings Status

Availibilty Yes/No

Remarks

GAD

Yes

RDSO Drawings

Yes

TAD

WIP

Divisional approval is done & HQ Approval is balance

DCN

No

MAIN FOB (12m x 41.88m)

Work Description

Material Availability Yes/No

Progress %

Remarks

Foundation 36 nos

Yes

100%

Pedestal

Yes

100%

Column Erection 36 nos

Yes

100%

Girder Launching 22 Nos

Yes

Nil

Deck Sheet fixing

No

Casting of Slab

No

Roofing structural members

No

Roof sheet fixing

No

Granite flooring

No

26 of 43

SATARA (Staircase Status)

STAIRCASE (4.2m Width) at PF NO. 01

Work Description

Material Availability Yes/No

Progress

Remarks

Foundation 03 nos

Yes

100

Pedestal

Yes

60%

Pedestal Final Lift is balance

Column Erection

No

Nil

Fabrication WIP

Cross Beam

No

Nil

Fabrication WIP

Deck Sheet fixing

No

Nil

Casting of Slab

No

Nil

Roofing structural members

No

Nil

Roof sheet fixing

No

Nil

Chequered Tiles

No

Nil

27 of 43

RAMPS (1500m)at PF NO. 02 & 03

Work Description

Material Availability Yes/No

Progress

Remarks

Foundation 21 Nos

Yes

100%

Pedestal

Yes

100%

Column Erection

Nil

Nil

Cross Beam

Nil

Nil

Deck Sheet fixing

Nil

Nil

Casting of Slab

Nil

Nil

Roofing structural members

Nil

Nil

roof sheet fixing

Nil

Nil

Chequered Tiles

Nil

Nil

RAMPS (1500m)at PF NO. 04 & 05

Work Description

Material Availability Yes/No

Progress

Remarks

Foundation 21 Nos

Yes

80%

02 Sets balance due to Electric Store Room & OHE Portal,Shifting to be done

Pedestal

Yes

80%

Column Erection

No

Nil

Cross Beam

No

Nil

Deck Sheet fixing

No

Nil

Casting of Slab

No

Nil

Roofing structural members

No

Nil

roof sheet fixing

No

Nil

Chequered Tiles

No

Nil

SATARA (Ramps Status)

28 of 43

SATARA (Work in progress photos)

FOB RAMP AT PF NO 1

29 of 43

SATARA (Work in progress photos)

FOB work at PF No: 2&3�

30 of 43

KOLHAPUR (Lift & Escalator Status)

Design & Drawings Status

Availibility Yes/No

Remarks

GAD of Civil

Yes

GAD of Lift & Esc

No

GFC Drawings of Civil

No

GFC Drawings of Lift & Esc

No

Electrical

Material Availability Yes/No

Progress %

Remarks

Lift at PF-1

No

Nil

Lift at PF-2

No

Nil

Escalator at PF-1(Both Direction)

No

Nil

Escalator at PF2(Both Direction)

No

Nil

Civil

Material Availability Yes/No

Progress %

Remarks

Lift at PF-1

No

Nil

Lift at PF-2

No

Nil

Escalator at PF-1

No

Nil

Escalator at PF2

No

Nil

31 of 43

KOLHAPUR (FOB Status)

Design & Drawings Status

Availibility Yes/No

Remarks

GAD

Yes

RDSO Drawings

Yes

TAD

WIP

Divisional approval is done & HQ Approval is balance

DCN

No

MAIN FOB (12m x 26.710)

Work Description

Material Availability Yes/No

Progress %

Remarks

Foundation 36 nos

Yes

100%

Pedestal 36 nos

Yes

100%

Column Erection 36 nos

Yes

80%

PF-1 & 2 02 nos balance & PF3 06 nos are balance

Girder Launching 28 nos

Yes

Nil

Cross Girder is also Balance

Deck Sheet fixing

No

Nil

Casting of Slab

No

Nil

Roofing structural members

NO

NIl

Fabrication WIP

Roof sheet fixing

No

Nil

Granite flooring

No

NIl

32 of 43

STAIRCASE (4.2m Width)

Work Description

Material Availability Yes/No

Progress %

Remarks

Foundation 24 nos

Yes

100%

Pedestal

Yes

100%

Column Erection

Yes

?

Cross Beam

Yes

Nil

Deck Sheet fixing

No

Nil

Casting

No

Nil

Roofing structural members

No

Nil

Roof sheet fixing

No

Nil

Chequered Tiles

No

NIL

33 of 43

FOB Location: Near Existing FOB Connecting PF1/2 TO PF 3

KOLHAPUR FOB (work in progress photos)

34 of 43

���FOB Location: Near Existing FOB Connecting PF1/2 TO PF 3�

KOLHAPUR FOB (work in progress photos)

35 of 43

FOB Location: Near Existing FOB Connecting PF1/2 TO PF 3

KOLHAPUR FOB (work in progress photos)

36 of 43

SANGLI (Lift & Escalator Status)

Design & Drawings Status

Availibility Yes/No

Remarks

GAD of Civil

Yes

GAD of Lift & Esc

No

GFC Drawings of Civil

No

GFC Drawings of Lift & Esc

No

Electrical

Material Availability Yes/No

Progress %

Remarks

Construction of Civil Works For Escalator

No

Nil

Lift at PF-1

No

Nil

Lift at PF 2&3

No

Nil

Lift at PF 4&5

No

Nil

Escalator at PF1(Both Direction)

No

Nil

Escalator at PF 2&3(Single Direction)

No

Nil

Escalator at 4&5(Single Direction)

No

Nil

Civil

Material Availability Yes/No

Progress %

Remarks

Construction of Civil Works For Escalator

No

Nil

Lift at PF-1

No

Nil

Lift at PF 2&3

No

Nil

Lift at PF 4&5

No

Nil

Escalator at PF1

No

Nil

Escalator at PF 2&3

No

Nil

Escalator at 4&5

No

NIl

37 of 43

SANGLI (FOB Status)

Design & Drawings Status

Availibility Yes/No

Remarks

GAD

Yes

RDSO Drawings

Yes

TAD

WIP

Under Divisional Approval

DCN

No

MAIN FOB (12m x 42.33)

Work Description

Material Availability Yes/No

Progress &

Remarks

Foundation 36 nos

Yes

100 %

Pedestal 36 nos

Yes

100%

Column Erection 36 nos

Yes

100%

Girder Launching 28 nos

Yes

Nil

Deck Sheet fixing

No

Nil

Casting of Slab

No

Nil

Roofing structural members

Yes

Nil

Roof sheet fixing

No

Nil

Granite flooring

No

Nil

38 of 43

STAIRCASE (1.5m Width) at PF No. 02 & 03

Work Description

Material Availability Yes/No

Progress %

Remarks

Foundation 06 nos

Yes

75%

04 nos are balamce due to OHE Portal

Pedestal 06 nos

Yes

75%

Column Erection

Yes

70%

Cross Beam

No

Nil

Deck Sheet fixing

No

Nil

Casting

No

Nil

Roofing structural members

No

Nil

Roof sheet fixing

Yes

Nil

Chequeret Tiles

No

Nil

STAIRCASE (1.5m Width) at PF No. 04 & 05

Work Description

Material Availability Yes/No

Progress %

Remarks

Foundation 06 nos

Yes

70%

04 nos are balamce due to OHE Portal

Pedestal 06 nos

Yes

70%

Column Erection 06 nos

Yes

35%

Cross Beam

No

Nil

Deck Sheet fixing

No

Nil

Casting

No

Nil

Roofing structural members

Yes

Nil

Roof sheet fixing

No

Nil

Chequered Tiles

No

Nil

STAIRCASE (4m Width) at PF No. 01

Work Description

Material Availability Yes/No

Progress %

Remarks

Foundation 24 nos

Yes

80%

04 nos are balamce due to OHE Portal

Pedestal 24 nos

Yes

80%

Column Erection 24 nos

Yes

70%

Cross Beam

No

Nil

Deck Sheet fixing

No

Nil

Casting

No

Nil

Roofing structural members

Yes

Nil

Roof sheet fixing

No

Nil

Chequered Tiles

No

Nil

SANGLI (Staircase Status)

39 of 43

GOOD SHEDS FOB (3mx 51.2m)

Work Description

Material Availability Yes/No

Progress %

Remarks

Foundation 02 nos

No

Nil

Column Erection 16 nos

No

Nil

Cross Beam

No

Nil

Deck Sheet fixing

No

Nil

Casting of Slab

No

Nil

Roofing structural members

No

Nil

Roof sheet fixing

NO

Nil

Granite Flooring

NO

Nil

Design & Drawings Status

Availibility Yes/No

Remarks

GAD

Yes

RDSO Drawings

No

Design is in Contractor Scope

TAD

NA

DCN

NA

Goods shed FOB & Ramps work status

RAMPS (2.2m Width) AT GOOD SHEDS

Work Description

Material Availability Yes/No

Progress %

Remarks

Foundation 24 nos

No

Nil

Column Erection 24 nos

No

Nil

Cross Beam

No

Nil

Deck Sheet fixing

No

Nil

Casting of Slab

No

Nil

Roofing structural members

No

Nil

Roof sheet fixing

No

Nil

Chequered Tiles

No

Nil

40 of 43

FOB AT PF NO. 1

SANGLI FOB (work in progress photos)

41 of 43

FOB AT PF NO. 2/3

SANGLI FOB (work in progress photos)

42 of 43

FOB WORK AT PF NO.4/5

SANGLI FOB (work in progress photos)

43 of 43

THANKS