STATUS OF LIFTS ,ESCALATORS &FOB’S UNDER ABSS
ABSS stations | |||||
Sr. No. | Name of Stations | PHASE I Already sanction | PHASE II To be proposed | ||
Lift | Escalator | Lift | Escalator | ||
1 | Hadapsar | 2 | 3 | 0 | 0 |
2 | Akurdi | 0 | 4 | 0 | 0 |
3 | Kolhapur | 2 | 4 | 0 | 0 |
4 | Satara | 1 | 3 | 2 | 3 |
5 | Sangli | 0 | 0 | 3 | 4 |
6 | Talegaon | 3 | 1 | 0 | 0 |
7 | Chinchwad | 3 | 0 | 0 | 0 |
8 | Dehu road | 0 | 0 | 4 | 6 |
9 | Hatkanangle | 0 | 0 | 2 | 2 |
10 | Belapur | 0 | 0 | 1 | 2 |
11 | Kopargaon | 0 | 0 | 3 | 2 |
12 | Ahmednagar | 0 | 0 | 3 | 4 |
13 | Daund | 0 | 0 | 2 | 4 |
| Total | 11 | 15 | 20 | 27 |
Non ABSS Stations | |||||
1 | Patas | 0 | 0 | 2 | 2 |
2 | Malavli | 0 | 0 | 2 | 2 |
3 | Khadki | 0 | 0 | 6 | 8 |
| Total | 0 | 0 | 10 | 12 |
|
|
|
|
|
|
Grand Total | 11 | 15 | 30 | 39 | |
S N | Name of station | TDC FOR LIFT/ ESCALATOR | TDC FOR FOB | S N | Name of station | TDC FOR LIFT/ ESCALATOR | TDC FOR FOB |
1 | Kedgaon | NA | NA | 11 | Sangli | 31.05.26 | 31.05.26 |
2 | Lonand | NA | NA | 12 | Satara | 31.05.26 | 31.02.26 |
3 | Phaltan | NA | NA | 13 | Kolhapur | 30.06.26 | 31.03.26 |
4 | Baramati | NA | NA | 14 | Kopargaon | Planned in Phase-2 | 30.09.26 |
5 | Wathar | NA | NA | 15 | Belapur | Planned in Phase-2 | 30.09.26 |
6 | Karad | NA | NA | 16 | Ahmednagar | Planned in Phase-2 | 30.09.26 |
7 | Hadapsar | 28.02.26 | Completed | 17 | Dehu Road | Planned in Phase-2 | NA |
8 | Chinchwad | 31.03.26 | FOB (extn only) 31.03.26 | 18 | Uruli | NA | NA |
9 | Akurdi | Escalator-31.03.26 | 31.03.26 | 19 | Hathkangale | Planned in Phase-2 | NA |
10 | Talegaon | � 31.05.26 | 31.03.26 | 20 | Daund | Planned in Phase-2 | NA |
Amrit Station (Lifts, Escalator, FOB Works) Status Pune GSU
CHINCHWAD (Lift & Escalator Status)
Civil | Material Availability Yes/No | Progress | Remarks |
Lift-1 Main Entry | Yes | 100 % | |
Lift-2 on PF-1 &2 | Yes | 55 % | Johnson WIP & after completion of Johnson work, balance civil will be completed |
Lift-3 on PF-3&4 | Yes | 55% | Johnson WIP & after completion of Johnson work, balance civil will be completed |
Lift-4 at Second Entry | Yes | 10% | WIP |
Escalator-1 at Main Entry(Up Direction) | Yes | 100% | |
Escalator-2 at Second Entry | Yes | 15% | Work is held up due to 800 mm height issue |
Electrical | Material Availability Yes/No | Progress | Remarks |
Lift-1 at Main Entry | Yes | 95 % | Testing WIP |
Lift-2 on PF-1&2 | Yes | 40 % | Lift Installation WIP |
Lift-3 on PF-3&4 | Yes | 20% | Lift Installation WIP |
Lift-4 at second Entry | No | 0% | Civil Work is balance |
Escalator -1 at Main Entry(Single Direction) | Yes | 100% | Handover Done |
Escalator-2 at Second Entry(Single Direction) | No | 0% | 800 mm Height Issue |
Design & Drawings Status | Yes/No | Remarks |
GAD of Civil | No | |
GAD of Lift & Esc | Yes | |
GFC Drawings of Civil | Yes | |
GFC Drawings of Lift & Esc | Yes | |
CHINCHWAD (FOB Extension Status)
Design & Drawings Status | Yes/No | Remarks |
GAD | No | |
RDSO Drawings | NA | Design & Drawing is in contractor Scope |
TAD | NA | |
DCN | NA | |
FOB Extention (6m x 9.5m) | |||
Work Description | Material Availability Yes/No | Progress % | Remarks |
Foundation 04 nos | Yes | 100% | |
Pedestal 04 nos | Yes | 10% | |
Column Erection | Yes | Nil | Fabrication WIP |
Girder Launching | No | Nil | Fabrication WIP |
Deck Sheet fixing | No | Nil | |
Casting of Slab | No | Nil | |
Roofing structural members | No | Nil | |
Roof sheet fixing | No | Nil | |
Granite flooring | No | Nil | |
| | | |
CHINCHWAD LIFT / ESCALATOR (Completed Photos)
�Lift No: 01 & Escalators No: 01 �Location: Waiting Area �
�Lift No: 02 �Location: At Platform No.1 and 2�
CHINCHWAD LIFT / ESCALATOR (Work in progress photos)
�Lift No. : 03 �Location: At Platform No 3 & 4
CHINCHWAD LIFT / ESCALATOR (Work in progress photos)
�Lift No: 04 & Escalators No: 02 �Location: At Second Entry UP side
CHINCHWAD LIFT / ESCALATOR (Work in progress photos)
TALEGAON (Lift & Escalator Status)
Civil ```` | Material Availability Yes/No | Progress % | Remarks |
Lift 1 on PF1 (DN Side) | Yes | 60% | |
Lift 2 on PF2 | No | Not Yet Started | Exact Location to be Finalized |
Lift 3 at second entry side (UP Side) | Yes | 60% | Required FOB Extension |
Escalator 1 on PF1 (DN Side) | Yes | 55% | Required FOB Extension |
Escalator 2 on PF2 | No | Not Yet Started | Exact Location to be Finalized |
Escalator 3 at second entry side (UP Side) | No | 62% | |
Electrical | Material Availability Yes/No | Progress % | Remarks |
Lift 1 on PF1 (DN Side) | No | 0% | Queuing length WIP |
Lift 2 on PF2 | No | Not Yet Started | Exact Location to be Finalized |
Lift 3 at second entry side (UP Side) | No | 0% | Work is held up due to FOB Extension |
Escalator 1 on PF1 (DN Side)(Single Direction) | Yes | 0% | Queuing Lenth completed ,hoisting is balance due to manpower |
Escalator 2 on PF2(Single Direction) | No | Not Yet Started | Work could not initiate due to Relay Room, shifting to be done |
Escalator 3 at second entry side (UP Side)(Single Direction) | Yes | 20% | Hoisting Work Completed |
Design & Drawings Status | Availibility Yes/No | Remarks |
GAD of Civil | No | |
GAD of Lift & Esc | Yes | |
GFC Drawings of Civil | Yes | |
GFC Drawings of Lift & Esc | Yes | |
TALEGAON (FOB Status)
Design & Drawings Status | Availibility Yes/No | Remarks |
GAD | Yes | |
RDSO Drawings | Yes | |
TAD | No | Not Submitted By Contractor yet |
DCN | No | |
MAIN FOB (6m x 39.3) | |||
Work Description | Material Availability Yes/No | Progress % | Remarks |
Foundation | Yes | 80% | 04 nos Foundation balance due to unavailability of Design & Drawing |
Pedestal | Yes | 80 % | |
Column Erection | No | Nil | Column Shifted to HDP Sky Walk, New Column Fabrication in progress |
Girder Launching | No | Nil | Fabrication WIP |
Deck Sheet fixing | No | Nil | |
Casting of Slab | No | Nil | |
Roofing structural members | No | Nil | |
Roof sheet fixing | No | Nil | |
Granite flooring | No | Nil | |
| | | |
LIFT No. 1 & ESCALATOR 1
TALEGAON LIFT / ESCALATOR (Work in progress photos)
�Lift No: 3�Location: Near FOB
TALEGAON LIFT / ESCALATOR (Work in progress photos)
Escalators No: 3�Location: Rear Entrance�
TALEGAON LIFT / ESCALATOR (Work in progress photos)
AKURDI (Lift & Escalator Status)
Civil | Material Availability Yes/No | Progress % | Remarks |
Lifts | NA | NA | |
Escalator at PF-1 | No | Yet To Start | |
Escalator at PF-2 | No | Yet To Start | |
Electrical | Material Availability Yes/No | Progress % | Remarks |
Lifts | NA | NA | |
Escalator at PF-1(Both Direction) | No | Yet To Start | |
Escalator at PF-2(Both Direction) | No | Yet To Start | |
| | | |
Design & Drawings Status | Availibility Yes/No | Remarks |
GAD of Civil | Yes | |
GAD of Lift & Esc | No | |
GFC Drawings of Civil | No | |
GFC Drawings of Lift & Esc | No | |
AKURDI (FOB Status)
Design & Drawings Status | Availibility Yes/No | Remarks |
GAD | Yes | |
RDSO Drawings | Yes | |
TAD | WIP | Divisional approval is done & HQ Approval is balance |
DCN | No | |
MAIN FOB (12m x 34m ) | |||
Work Description | Material Availability Yes/No | Progress % | Remarks |
Foundation | Yes | 100% | |
Pedestal | Yes | 100% | |
Column Erection | Yes | 100% | |
Girder Launching | Yes | Nil | |
Deck Sheet fixing | No | Nil | |
Casting of Slab | No | Nil | |
Roofing structural members | No | Nil | |
Roof sheet fixing | No | Nil | |
Granite flooring | No | Nil | |
| | | |
AKURDI (Ramps Status)
RAMPS (1.7m Width ) at PF No. 01 | |||
Work Description | Material Availability Yes/No | Progress % | Remarks |
Foundation | Yes | 100% | |
Pedestal | Yes | 100% | |
Column Erection | No | Nil | |
Cross Beam | No | Nil | |
Deck Sheet fixing | No | Nil | |
Casting of Slab | No | Nil | |
Roofing structural members | No | Nil | |
Roof sheet fixing | No | Nil | |
Chequered Tiles | No | Nil | |
| | | |
RAMPS (1.7m Width ) at PF No. 02 | |||
Work Description | Material Availability Yes/No | Progress % | Remarks |
Foundation | Yes | 100% | |
Pedestal | Yes | 100% | |
Column Erection | No | Nil | |
Cross Beam | No | Nil | |
Deck Sheet fixing | No | Nil | |
Casting of Slab | No | Nil | |
Roofing structural members | No | Nil | |
Roof sheet fixing | No | Nil | |
Chequered Tiles | No | Nil | |
| | | |
AKURDI FOB(Work in progress photos)
FOB
HADAPSAR (Lift & Escalator Status)
Civil | Material Availability Yes/No | Progress % | Remarks |
Skywalk | Yes | 100% | |
Lift at Circulating Area | Yes | 30 % | |
Lift at PF-1 to New FOB | Yes | Not Yet Started | GAD Submitted in e-DAS for divisional approval |
Lift at PF-1 to Old FOB | Yes | Not Yet Started | GAD Submitted in e-DAS for divisional approval |
Lift at PF-2&3 to Old FOB | Yes | Not Yet Started | GAD Submitted in e-DAS for divisional approval |
02 Escalators at Circulating Area | Yes | 25% | |
01 Escalators at PF-2&3 to New FOB | Yes | Not yet Started | GAD Submitted in e-DAS for divisional approval |
Electrical | Material Availability Yes/No | Progress % | Remarks |
Lift at Circulating Area | Yes | 0% | |
Lift at PF-1 to New FOB | | 0% | |
Lift at PF-1 to Old FOB | | 0% | |
Lift at PF-2&3 to Old FOB | | 0% | |
02 Escalators at Circulating Area | Yes | 0% | |
01 Escalators at PF-2&3 to New FOB | | 0 % | |
Design & Drawings Status | Availibility Yes/No | Remarks |
GAD of Civil | Yes | |
GAD of Lift & Esc | Yes | |
GFC Drawings of Civil | Yes | |
GFC Drawings of Lift & Esc | Yes | |
HADAPSAR (FOB Status)
Design & Drawings Status | Availibility Yes/No | Remarks |
GAD | Yes | |
RDSO Drawings | Yes | |
TAD | Yes | |
DCN | yes | |
MAIN FOB 12mx 32.575m | |||
Work Description | Material Availability Yes/No | Progress % | Remarks |
Foundation | Yes | 100% | |
Column Erection | Yes | 100% | |
Girder Launching | Yes | 100% | |
Deck Sheet fixing | Yes | 100% | |
Casting of Slab | Yes | 100% | |
Roofing structural members | Yes | 100% | |
Roof sheet fixing | Yes | 100% | |
Granite flooring | Yes | 100% | |
| | | |
HADAPSAR (Ramps & Skywalks/ Staircase Status)
RAMPS (1.5m Width) at PF No. 01 & Ramp ( 2.5m Width) at PF No. 02 & 03 | |||
Work Description | Material Availability Yes/No | Progress % | Remarks |
Foundation | Yes | 100% | |
Column Erection | Yes | 100% | |
Cross Beam | Yes | 100% | |
Deck Sheet fixing | Yes | 100% | |
Casting of Slab | Yes | 100% | |
Roofing structural members | Yes | 100% | |
Roof sheet fixing | Yes | 100% | |
Chequered Tiles | Yes | 100% | |
| | | |
SKYWALK (6M X73.82 Including 3m width staircase) | |||
Work Description | Material Availability Yes/No | Progress % | Remarks |
Foundation | Yes | 100% | |
Column Erection | Yes | 100% | |
Cross Beam | Yes | 100% | |
Deck Sheet fixing | Yes | 100% | |
Casting of Slab | Yes | 100% | |
Roofing structural members | Yes | 80% | Staircase & Esc Members are balance |
Roof sheet fixing | Yes | 80% | Staircase & Esc Roof Covering Is Balance |
Chequered Tiles | Yes | 100% | |
| | | |
HADAPSAR (Completed photos)
FOB
FOB RAMP
HADAPSAR (Work in progress photos)
SKYWALK
SKY WALK STAIRCASE
SATARA (Lift & Escalator Status)
Civil | Material Availability Yes/No | Progress % | Remarks |
Lift at PF-1 | No | Nil | |
Lift at PF-2&3 | No | Nil | |
Lift at PF 3&4 | No | Nil | |
Escalator at PF-1 | No | Nil | |
Escalator at PF-2&3 | No | Nil | |
Escalator at PF – 4&5 | No | Nil | |
Electrical | Material Availability Yes/No | Progress % | Remarks |
Lift at PF-1 | No | No | |
Lift at PF-2&3 | No | No | |
Lift at PF 3&4 | No | No | |
Escalator at PF-1(Both Directon) | No | No | |
Escalator at PF-2&3(Both Direction) | No | No | |
Escalator at PF – 4&5(Both Direction) | No | No | |
| | | |
| | | |
Design & Drawings Status | Availibility Yes/No | Remarks |
GAD of Civil | No | |
GAD of Lift & Esc | No | |
GFC Drawings of Civil | No | |
GFC Drawings of Lift & Esc | No | |
SATARA (FOB Status)
Design & Drawings Status | Availibilty Yes/No | Remarks |
GAD | Yes | |
RDSO Drawings | Yes | |
TAD | WIP | Divisional approval is done & HQ Approval is balance |
DCN | No | |
MAIN FOB (12m x 41.88m) | |||
Work Description | Material Availability Yes/No | Progress % | Remarks |
Foundation 36 nos | Yes | 100% | |
Pedestal | Yes | 100% | |
Column Erection 36 nos | Yes | 100% | |
Girder Launching 22 Nos | Yes | Nil | |
Deck Sheet fixing | No | | |
Casting of Slab | No | | |
Roofing structural members | No | | |
Roof sheet fixing | No | | |
Granite flooring | No | | |
| | | |
SATARA (Staircase Status)
STAIRCASE (4.2m Width) at PF NO. 01 | |||
Work Description | Material Availability Yes/No | Progress | Remarks |
Foundation 03 nos | Yes | 100 | |
Pedestal | Yes | 60% | Pedestal Final Lift is balance |
Column Erection | No | Nil | Fabrication WIP |
Cross Beam | No | Nil | Fabrication WIP |
Deck Sheet fixing | No | Nil | |
Casting of Slab | No | Nil | |
Roofing structural members | No | Nil | |
Roof sheet fixing | No | Nil | |
Chequered Tiles | No | Nil | |
| | | |
RAMPS (1500m)at PF NO. 02 & 03 | |||
Work Description | Material Availability Yes/No | Progress | Remarks |
Foundation 21 Nos | Yes | 100% | |
Pedestal | Yes | 100% | |
Column Erection | Nil | Nil | |
Cross Beam | Nil | Nil | |
Deck Sheet fixing | Nil | Nil | |
Casting of Slab | Nil | Nil | |
Roofing structural members | Nil | Nil | |
roof sheet fixing | Nil | Nil | |
Chequered Tiles | Nil | Nil | |
| | | |
RAMPS (1500m)at PF NO. 04 & 05 | |||
Work Description | Material Availability Yes/No | Progress | Remarks |
Foundation 21 Nos | Yes | 80% | 02 Sets balance due to Electric Store Room & OHE Portal,Shifting to be done |
Pedestal | Yes | 80% | |
Column Erection | No | Nil | |
Cross Beam | No | Nil | |
Deck Sheet fixing | No | Nil | |
Casting of Slab | No | Nil | |
Roofing structural members | No | Nil | |
roof sheet fixing | No | Nil | |
Chequered Tiles | No | Nil | |
| | | |
SATARA (Ramps Status)
SATARA (Work in progress photos)
FOB RAMP AT PF NO 1
SATARA (Work in progress photos)
FOB work at PF No: 2&3�
KOLHAPUR (Lift & Escalator Status)
Design & Drawings Status | Availibility Yes/No | Remarks |
GAD of Civil | Yes | |
GAD of Lift & Esc | No | |
GFC Drawings of Civil | No | |
GFC Drawings of Lift & Esc | No | |
Electrical | Material Availability Yes/No | Progress % | Remarks |
Lift at PF-1 | No | Nil | |
Lift at PF-2 | No | Nil | |
Escalator at PF-1(Both Direction) | No | Nil | |
Escalator at PF2(Both Direction) | No | Nil | |
| | | |
| | | |
Civil | Material Availability Yes/No | Progress % | Remarks |
Lift at PF-1 | No | Nil | |
Lift at PF-2 | No | Nil | |
Escalator at PF-1 | No | Nil | |
Escalator at PF2 | No | Nil | |
KOLHAPUR (FOB Status)
Design & Drawings Status | Availibility Yes/No | Remarks |
GAD | Yes | |
RDSO Drawings | Yes | |
TAD | WIP | Divisional approval is done & HQ Approval is balance |
DCN | No | |
MAIN FOB (12m x 26.710) | |||
Work Description | Material Availability Yes/No | Progress % | Remarks |
Foundation 36 nos | Yes | 100% | |
Pedestal 36 nos | Yes | 100% | |
Column Erection 36 nos | Yes | 80% | PF-1 & 2 02 nos balance & PF3 06 nos are balance |
Girder Launching 28 nos | Yes | Nil | Cross Girder is also Balance |
Deck Sheet fixing | No | Nil | |
Casting of Slab | No | Nil | |
Roofing structural members | NO | NIl | Fabrication WIP |
Roof sheet fixing | No | Nil | |
Granite flooring | No | NIl | |
| | | |
STAIRCASE (4.2m Width) | |||
Work Description | Material Availability Yes/No | Progress % | Remarks |
Foundation 24 nos | Yes | 100% | |
Pedestal | Yes | 100% | |
Column Erection | Yes | ? | |
Cross Beam | Yes | Nil | |
Deck Sheet fixing | No | Nil | |
Casting | No | Nil | |
Roofing structural members | No | Nil | |
Roof sheet fixing | No | Nil | |
Chequered Tiles | No | NIL | |
| | | |
FOB Location: Near Existing FOB Connecting PF1/2 TO PF 3
KOLHAPUR FOB (work in progress photos)
���FOB Location: Near Existing FOB Connecting PF1/2 TO PF 3�
KOLHAPUR FOB (work in progress photos)
FOB Location: Near Existing FOB Connecting PF1/2 TO PF 3
KOLHAPUR FOB (work in progress photos)
SANGLI (Lift & Escalator Status)
Design & Drawings Status | Availibility Yes/No | Remarks |
GAD of Civil | Yes | |
GAD of Lift & Esc | No | |
GFC Drawings of Civil | No | |
GFC Drawings of Lift & Esc | No | |
Electrical | Material Availability Yes/No | Progress % | Remarks |
Construction of Civil Works For Escalator | No | Nil | |
Lift at PF-1 | No | Nil | |
Lift at PF 2&3 | No | Nil | |
Lift at PF 4&5 | No | Nil | |
Escalator at PF1(Both Direction) | No | Nil | |
Escalator at PF 2&3(Single Direction) | No | Nil | |
Escalator at 4&5(Single Direction) | No | Nil | |
Civil | Material Availability Yes/No | Progress % | Remarks |
Construction of Civil Works For Escalator | No | Nil | |
Lift at PF-1 | No | Nil | |
Lift at PF 2&3 | No | Nil | |
Lift at PF 4&5 | No | Nil | |
Escalator at PF1 | No | Nil | |
Escalator at PF 2&3 | No | Nil | |
Escalator at 4&5 | No | NIl | |
SANGLI (FOB Status)
Design & Drawings Status | Availibility Yes/No | Remarks |
GAD | Yes | |
RDSO Drawings | Yes | |
TAD | WIP | Under Divisional Approval |
DCN | No | |
MAIN FOB (12m x 42.33) | |||
Work Description | Material Availability Yes/No | Progress & | Remarks |
Foundation 36 nos | Yes | 100 % | |
Pedestal 36 nos | Yes | 100% | |
Column Erection 36 nos | Yes | 100% | |
Girder Launching 28 nos | Yes | Nil | |
Deck Sheet fixing | No | Nil | |
Casting of Slab | No | Nil | |
Roofing structural members | Yes | Nil | |
Roof sheet fixing | No | Nil | |
Granite flooring | No | Nil | |
| | | |
STAIRCASE (1.5m Width) at PF No. 02 & 03 | |||
Work Description | Material Availability Yes/No | Progress % | Remarks |
Foundation 06 nos | Yes | 75% | 04 nos are balamce due to OHE Portal |
Pedestal 06 nos | Yes | 75% | |
Column Erection | Yes | 70% | |
Cross Beam | No | Nil | |
Deck Sheet fixing | No | Nil | |
Casting | No | Nil | |
Roofing structural members | No | Nil | |
Roof sheet fixing | Yes | Nil | |
Chequeret Tiles | No | Nil | |
STAIRCASE (1.5m Width) at PF No. 04 & 05 | |||
Work Description | Material Availability Yes/No | Progress % | Remarks |
Foundation 06 nos | Yes | 70% | 04 nos are balamce due to OHE Portal |
Pedestal 06 nos | Yes | 70% | |
Column Erection 06 nos | Yes | 35% | |
Cross Beam | No | Nil | |
Deck Sheet fixing | No | Nil | |
Casting | No | Nil | |
Roofing structural members | Yes | Nil | |
Roof sheet fixing | No | Nil | |
Chequered Tiles | No | Nil | |
STAIRCASE (4m Width) at PF No. 01 | |||
Work Description | Material Availability Yes/No | Progress % | Remarks |
Foundation 24 nos | Yes | 80% | 04 nos are balamce due to OHE Portal |
Pedestal 24 nos | Yes | 80% | |
Column Erection 24 nos | Yes | 70% | |
Cross Beam | No | Nil | |
Deck Sheet fixing | No | Nil | |
Casting | No | Nil | |
Roofing structural members | Yes | Nil | |
Roof sheet fixing | No | Nil | |
Chequered Tiles | No | Nil | |
| | | |
SANGLI (Staircase Status)
GOOD SHEDS FOB (3mx 51.2m) | |||
Work Description | Material Availability Yes/No | Progress % | Remarks |
Foundation 02 nos | No | Nil | |
Column Erection 16 nos | No | Nil | |
Cross Beam | No | Nil | |
Deck Sheet fixing | No | Nil | |
Casting of Slab | No | Nil | |
Roofing structural members | No | Nil | |
Roof sheet fixing | NO | Nil | |
Granite Flooring | NO | Nil | |
| | | |
Design & Drawings Status | Availibility Yes/No | Remarks |
GAD | Yes | |
RDSO Drawings | No | Design is in Contractor Scope |
TAD | NA | |
DCN | NA | |
Goods shed FOB & Ramps work status
RAMPS (2.2m Width) AT GOOD SHEDS | |||
Work Description | Material Availability Yes/No | Progress % | Remarks |
Foundation 24 nos | No | Nil | |
Column Erection 24 nos | No | Nil | |
Cross Beam | No | Nil | |
Deck Sheet fixing | No | Nil | |
Casting of Slab | No | Nil | |
Roofing structural members | No | Nil | |
Roof sheet fixing | No | Nil | |
Chequered Tiles | No | Nil | |
| | | |
FOB AT PF NO. 1
SANGLI FOB (work in progress photos)
FOB AT PF NO. 2/3
SANGLI FOB (work in progress photos)
FOB WORK AT PF NO.4/5
SANGLI FOB (work in progress photos)
THANKS