SAP Plant Maintenance
Inspection Round Planning
This presentation is to show how to create a Task List for Measurement Reading
Creating a General Task List for managing Measurement Readings of several Equipments or FL
Prepare 5 operations and assign each with an Equipment
Select to Highlight the 5 Operations and
Click “PRT”
Operation 10
Switch to Measuring Point
Dialogue
F4
Equipment TEQ-01 currently only have ONE MP, Double-click to select it
Goto the Next Operation
You can have One or more Measurement Point for an Operation related to the EQ
Use the same method illustrated earlier to select MPs from the respectively EQs assigned to the Operation
SAVE
MP assigned to the last operation 50
Use IA10 to show Measuring Point as PRT assigned to the Operations of the General Task List
Measuring Points were seen assigned to each Operation in
IA10
Create an MO for managing the Measurement Readings
Get General Task List created just now
Double click counter 2
Replace all Operations Work Centers to MECHANIK
Copy ALL Operations from the General Task list
General Task list copied to MO
Check PRT copied over
MP for TEQ-05 in the MO
MO# 816022
Released and SAVED
Job Ticket and Job Card from Std SAP shop paper prints the Measurement Points
You can find the Measuring Point in the Std SAP sho paper
Job Ticket
You can find the Measuring Point in the Std SAP sho paper
Job Card
Change Settings to get Profile with Measurement Point ENTRY screen segments
F4
Press ENTER to read MO into IW42
Record Operation Time for Measurement Readings
You can now begin recording the Measurement Readings
SAVE
You can find the Measurement Documents here
Measurement Documents
To Reverse the Measurement Reading, First SET to Change Mode
Access Detail Screen of Measurement Doc
SAVE
Note “Reversal” Indicator
Note “Reversal” Indicator
To Enter the correct Reading, Goto IW42 again.
You have to Manually Enter the MP and the Correct Readings
SAVE
New Reading
Related IMG
Confirmation Screen Segment with Measurement Reading
In the next PPT,
we shall see how to SETUP
Maintenance Plan for Inspection Round
(meaning, use MP to generate MO in a specific cycle like weekly or monthly for Measurement Reading via the Called MO)