Coventry�School Building Committee�
INITIAL/POTENTIAL CAPITAL PLANNING OPTIONS
FOR
DISCUSSION
Please Note: ��- Estimates and costs provided in this document are preliminary rough estimates only and will be further refined as the scope of work narrows and more information becomes available.��- Current construction market conditions do not align with RIDE funding formulas (cost/SF) - such that the funding provided may not be sufficient to build the size of building desired and/or level of improvements.��- “Renovations” in this discussion include both deferred maintenance and educational adequacy components. It is important to understand that there is flexibility in the cost of renovations – renovation costs can be increased or reduced from the costs and cost ranges presented here. ��
COVENTRY PUBLIC SCHOOLS MAP
SUMMARY DATA
SUMMARY DATA
COVENTRY HS FLOOR PLAN
COVENTRY HS SITE
ALAN SHAWN FEINSTEIN MS FLOOR PLAN
ALAN SHAWN FEINSTEIN MS SITE
BLACKROCK ES FLOOR PLAN
BLACKROCK ES SITE
HOPKINS HILL ES FLOOR PLAN
HOPKINS HILL ES SITE
TIOGUE ES FLOOR PLAN
TIOGUE ES SITE
WASHINGTON OAK ES FLOOR PLAN
WASHINGTON OAK ES SITE
WESTERN COVENTRY ES FLOOR PLAN
WESTERN COVENTRY ES SITE
OPTION 1 - $120 M (Maximizes Incentive Potential)
Components:
OPTION 1 - $120 M
ADVANTAGES
DISADVANTAGES
OPTION 2 - $100 M (Maximizes Incentive Potential)
Components:
OPTION 2 - $100 M
ADVANTAGES
DISADVANTAGES
OPTION 3 - $65 M - $90 M (Less Incentive Potential)
Components:
OPTION 3 - $65 M - $90 M (Less Incentive Potential)
ADVANTAGES
DISADVANTAGES
OPTION 4 - $81 M - $90 M (Maximizes Incentive Potential)
Components:
OPTION 4 - $81 M - $90 M (Maximizes Incentive Potential)
ADVANTAGES
DISADVANTAGES
�NEXT STEPS�