Customer Specific Expectations

  • Quotes to customer within 4 hours. If more than 4 hours needed, must contact buyer with reasons/explanation of why
  • Customer PO’s placed within 2 hours
  • Per customer, compete based on fastest delivery, not cost
  • Sequence of Events (SOE)- Itemized listing of activities and timeline
      • This is required when an RPM order is late, or it does not meet BIC (best in class) and or END. Customer Spreadsheet/template to use.
  • Performance Measurement:
      • OTD to END goal is 87%
      • OTD to BIC LT goal is 95%
      • OTD to Promise Date 98%
  • If Lam’s response is delayed, be persistent to call until you reach your SBM and SBM’s Manager (see Lam escalation chart)
  • Invest in stocking commonly used materials
  • Goal is for fit, form and function for a part, not necessarily FAI conformance (for assy’s)
  • END= Engineering Need Date, BIC LT: Best in class lead time (spreadsheet for identifying customer expected BIC)

​

DOC-1.0-008 Rev 1 Effective Date: 10/10/23

​

2

3 of 8

Quoting

  • Include Details in Quote/Quost
      • Quote 1 of 4 possible responses
          • Can meet END; Cannot meet End but can meet BIC LT; Cannot meet END or BICLT (must list reasons why); No Bid
      • Quote with split line option to improve first piece delivery
      • List exceptions & work content time in QUOST; Email redline drawing to buyer
      • All expedite fee’s must be included in quote on a separate line item. CANNOT add expedite fee after quote issued
      • Always quote with expiration time/date
      • If quote is outside END, include high level BIC LT sequence of events (SOE)
          • EX: Material 1D, Program 1D, Fixture 1D, Manufacture 1D, OSP: Ano 2D Inspect/Ship 1D
          • Reference excel SOE document for more details DOC-8.1-011 (Sequence of Events)
  • Review drawing specification early at engineering/contract review
      • Confirm you can meet ALL specification requirements
      • If problem(s) identified, contact the buyer ASAP and submit PR if necessary
  • Ensure all necessary fixtures, tooling and BOM components are available at time of quote

DOC-1.0-008 Rev 1 Effective Date: 10/10/23

​

​

3

4 of 8

Receipt of PO- Lam Expectations

  • Forward schedule ALL RPM Orders
      • Launch/begin the order ASAP and ship early at every opportunity. No penalties for early shipment
          • Do not backwards schedule from the END date or your promise date
      • #1 target for all orders is END, #2 is BIC LT
      • Align with your SBM if you are unaware of what your commodity BIC LT is (use spreadsheet first to try to identify BIC LT)
      • When Commit date is missed, END and BIC LT counts as a miss automatically
      • Perform operations in parallel (contract review, programming, material procurement, etc.)
  • END Escalations (if we miss END then escalation at Lam and notification to PSP will occur)
      • Respond to them ASAP- Acknowledge within 4 hours – Commit within 24 hours
  • Manage & Expedite OSPs (outside processes)
      • Confirm OSP expedited commit and don’t assume they are expediting

DOC-1.0-008 Rev 1 Effective Date: 10/10/23

​

​

4

5 of 8

Receipt of PO- Lam Expectations Cont’d

  • Respond to RPM Escalations ASAP
      • Acknowledge within 4 hours, commit within 24 hours
          • Escalation is kicked off by a commit date that is greater than END
      • Provide high level BIC LT break down of processes (SOE)
  • Split line items for improved delivery
      • Delivering 1 or 2 pieces of a large quantity early may satisfy the requestors needs
      • If initial delivery of split quantity meets END, the entire line item will meet END
      • Communicate the split line options to your buyer through QUOST
  • Always email the Buyer and SBM when changing your commit date
      • Keep the dashboard up to date as possible with no surprises

DOC-1.0-008 Rev 1 Effective Date: 10/10/23

​

​

5

6 of 8

Receipt of PO- Lam Expectations Cont’d

  • Actively Manage and expedite all outside service processes
      • Quote your OSPs at time of Lam quotation as well as after PO is received
          • Confirm OSP expedited commit and don’t assume they are expediting
      • Always expedite OSP services to best possible lead time
      • If doing an OSP in house to improve lead times, align with SBM
  • Do not outsource RPM if you have internal capability issues without written SMB approval
      • Outsourcing RPM adds significant risk to speed and commitments
      • Only subcontract work for pre-established POR, unique capability needs, or Lam specified vendors
  • PR submissions
      • Select RPM Line Down- Submit title as “RPM PO# 4700XXXXX- Problem statement”
      • Escalate RPM PRs until you get a valid response- Buyer>RPM SBM>SBM Management> SMG
      • Do not wait for ASA (authorization to ship) to continue manufacturing once you have enough guidance (PR or email) to do so
          • ASA is required to ship deviation!!

DOC-1.0-008 Rev 1 Effective Date: 10/10/23

​

​

6

7 of 8

Contract Review/Gate 1

  • No formal Risk Form/Kick Off required
      • PSP team can utilize any documents deemed necessary that is apart of the QMS in order to process an order, however it is not a requirement
  • Release router as bare bones, update items as they are received from the team
  • Must inform purchasing when order is received so we can work in parallel
  • If FAIR required, then it should be marked on the Quost and/or the Lam portal
      • Ensure there is a routing step for FAIR
      • Ship FAIR required parts ASAP, do not wait for Lam FAIR approval to Ship!

​

​

​

DOC-1.0-008 Rev 1 Effective Date: 10/10/23

​

​

​

7

8 of 8

Additional Process Requirements

  • If ANY delays, then we MUST inform CSR’s/PE’s/RPM Champion
  • Must have notes in traveler that part is RPM
  • Must watermark RPM or stamp RPM on drawing to signify RPM part
  • Print traveler on TEAL paper to signify RPM
  • Log-in’s still required to be done in ERP System
  • RPM jobs do not fall under any regulatory requirements, therefore any QMS required processes, outside of this one, do not apply to RPM jobs
  • Place label on shipping boxes with RPM on 2 sides (use box labels)

​

DOC-1.0-008 Rev 1 Effective Date: 10/10/23

​

​

​