TPB degradation study update
26.5.2026
AC group meeting
Overview TPB degradation study
Setup
Measurements
2
26.5.2026
AC group meeting
Overview setup
3
UV LED
Darkness
Darkness
UV LED
UV LED, monitoring SiPM, 3D case
T, rel.hum, O2, P monitoring
T, rel.hum, O2, P monitoring
Inert atmosphere (Ar, N2?)/vacuum
ambient atmosphere
miniLFT for
cold PCB & sensors
vacuum pump
26.5.2026
AC group meeting
Setup in darkboxes
4
Intensity
Scan positions in 3D scanner
Fixed scan position in darkbox
UV LED, monitoring SiPM, 3D case
The time of scanning the ACL in the 3D scanner should be kept as little as possible, because they should stay in their respective environments. Therefore not a full ACL scan is foreseen, but only a point-like grid (see above). The fixed position with the pulsed LED and monitoring SiPM allows to measure more frequently, but with less resolution
26.5.2026
AC group meeting
Overview task list
5
26.5.2026
AC group meeting
Evap chamber - tasks
6
26.5.2026
AC group meeting
Leak-checking
7
26.5.2026
AC group meeting
Leak tests - after 1 week still at ~10¹-10² mbar
8
Grafana: Dashboards -> TPB degradation study -> Evap Chamber leak tests
26.5.2026
AC group meeting
Dark boxes
9
26.5.2026
AC group meeting
Sensors
10
26.5.2026
AC group meeting
Glue tests & ACL production (a sticky situation…)
11
26.5.2026
AC group meeting
Glue tests
12
26.5.2026
AC group meeting