Water System Consists of 11 PEX Assemblies + 34 Pipes
3
4
1
2
5
6
7
8
Both in same wall module?
9
10
6B
11
5 days to a few weeks industry standard
Expansion
Penetrations Added
Notch this out + protector plate. Maybe add utility channel next time. Box B12.
To B21
B12
Bedroom 1: Notch + protector plate. See Master Bedroom Electrical.
Kitchen light closure, see Master Bedroom Electrical
B30
Module 41
B31
Between floor from B33 to 1st floor bath vent fan B38. See Core Utility Modules. Will require fan hole through exterior wall module 14.
Module 14
Exterior Penetration
First floor vent fan. See Core Utility Modules.
Water Distribution Sharkbite Fittings
Freeze-proof shutoff to hose bib
Hot ource from 1st floor
Water Source - System in 1 hr - Module i1
Build:
To heater
2
1” Pressure
Reducer
$74
$14
1”x3/4”
3/4”
$12
1” Check Valve
$18
Sharkbite hose bib
2nd floor
Cold supply
$3.5
1”x3/4”
3/4”x1/2”
$19
1/2”-3/4”
3/4”
$40
1” Check Valve
$11
1
2
3
4
5
6
1” gap
To heater
8” diameter
7
As Built Distances
Measurements:
1/2” conduit:
3/4” conduit:
Slip Coupler
3” conduit
Slip Coupler
4 ga ground
5’?
6 ga ground 7.5’?
PV Grounds
Album
g
Connections in row
Connection between rows
Maysville Build Showcases Modular Build Technique
Interior Module 1 Tolerancing and Installation
Build Procedure:
2nd Floor Toilet Assembly
Hang main vent on PVC Strap (green). Red is boundary of PVC assembly.
All holes oversized to 5” for ease of fit
Pipe ends exactly at module
End at trap. +/- 1.5”
End with double fixture tee at top of module I1. +/- ¾”
End at tee at z=0 of Module I1.
Stub sticks out 3.5”
End at x=49.5 of module (1.5” slip into 3” pipe)
x
x
+/- 1.25”
Pipe should be half way up for mid point - or 6.5” in the cavity which is 13” from floor. But second floor?
Only outstanding question is this height so we don’t have to re-cut plumbing after rough-in
Procedure: measure exact stub height.
Ideally 4 OD Flange + 4” ID closet flange
7” +/- 2”
Finish Trim Staining Plan
Front Door
1x6 Select Tapered
Special walnut
4 WIndows
1x6 Select Ripped
Door to Garage
1x6 Select
Stairway Wall Trim
1x8 Select
Landing Trim
1x2 Select (+1x6 select not shown)
Closet Door Trim
1x6 Select
Bath Tub Trim
1x3 Red Oak
Laundry Closet Trim
2x2 Select
6 WIndows
1x6 Select Ripped
Door to Sun Deck
1x4 select
Hallway Trim
1x8 Select
Tub Trim
1x3 Red Oak
Floor 1
Floor 2
Plus:
Ceiling Closures
(Inc. kitchen + bath + interior stair wall))
Window Boxes
(Treated)
(Jarrah Brown)
Front Deck
(Treated)
1
2
3
5
4
6
7
8
12
13
15
14
9
10
11
Wire Routing - Wire Map - Wire Layout - NEC 2017
SH 4
W/D
DW
Ref
Bedrooms: not shown
Living Room
3 pairs + 1 single wire. Single must be 10/3 (no stacking)
Keep staple order consistent at door, start at top and work down as 4 pairs, with induction being the sole single line.:
Fridge (M)
Induction
Living
Washers (M)
SA (M)
Bathrooms
Heater/Lights
Bedroom and Heat Pump do not go over the front door.
Spacing: from 1” to 3.5” from framing edge for ute chan around door (4” from frame to channel interior.
7 Living 12/2
5 Bathrooms 20A 12/2
8 Heat Pump 30A 10/2
2 Induction 10/3
9 Bedrooms 20A 12/2+14/2
4 Dishwasher 20A 12/3
3 SA 12/3
SA 2
Washer
1 Extra Kitchen 15A
Refrigerator 15A
standard
standard
Kitch. Lights 15A
6 Minitank 20A 12/3
Heater 2 6/2
standard
Add closet light with pullcord
Garage 12/2
Vent hood on B circuit? as kitchen lights.
Garage GFCI circuit goes around door to garage - eliminates need to go over front door?
Not to scale: this shows SH2 Floorplan, but electrical concept is for SH4
GFCI at box
GFCI at box
GFCI at box
GFCI at box
Note that a multiwire circuit appears to consist of 2 dedicated circuits, so fridge appears to be ok on a multiwire circuit.
Take SA multiwire and feed 240v of it to stove
GFCI at box
GFCI at box
GFCI at box
GFCI at box
100A Subpanel
30A PV
100A PoN breaker - 240V - $60 |
30A PoN Breaker - 240V - $20 |
70A PoN breaker - 240V - $30 |
20A PoN Breaker - $20 |
20A AFCI PoN Breaker - $37 |
15A AFCI PoN Breaker - $52 |
[2] 30A PoN Breaker - 240V - $20
20A -240V - AFCI - $86
Apertures
General:
Tub - water - vent
Hose Bib
Utility Wall Interface Design
g
Module 1 Water
1
2
3
4
5
6
7
8
Module 2 Water
9
10
11
12
13
14
15
16
17
24 lb*7=168
1.5 2x8 equiv blocking (3 2x4s)= 33 lb
200 lb total in full (same as French door).
Can reduce this by web cutouts and 2x3s
21 pcs of 2x4 - 14”
[3] 2x4
End at tee, connect later
End at tee, connect later
Curl tube in module 2. Only tube which is coiled.
End at tee, connect later
18
Curl tube in module 2
Curl tubes in module 2
Leave inside for transport
Do not connect 4 stubs for transport
Do not connect 2 stubs for transport
Module 1 Electrical
19
PV System With Separate Auxiliary Water Heater
Fused PV combiner 500V max + DC breakers + lightning protection
Sungold 6kW Inverter + Manual. Has islanding protection.
30A AC Breaker
360 VDC
Ground Rod
System Design Modes:
Junction Box 200A
(150A min)
Meter Base
100A AC Breaker
Entire Rough Plumbings Consists of 14 PVC Subassemblies, Prepared in 2-4 Hours from Detail Blueprints
Actual time: 48 glue joints in ___ minutes
4
1
2
3
5
6
7
10
11
9
12
13
14
8
Vanity 2 Rough
Washer
Main Stack
Vanity 2
Bath Sink 1 Finish
Toilet
Kitchen Finish
Kitchen
Rough
Main vent
2”
2” log elbow
2”
2”
2”
2”
2”
2-2-1.5”
1.5-1”
1”
1”
1”
3-1.5”
3”
1.5”
1.5”
1.5”
1.5”
1.5”
2-1.5”
2”
2”
Cap
2”
2-2-1.5”
2”
1.5”
1.5”
Cap
4-3” closet
3” long el
1-½” out, 1-½” or 1-¼” in
2-2-1.5”
1.5”
2”
Cap
2”
3” pipe
3-3-2”
3-3-2”
3-2”
3”
3”
3”
3”
3”
vBOM: Routing of PV to Inside of House
68
48
67
Conduit body or bend
LFMC
LFMC
3 wire total with 10 ga ground (30A)
1
4 wire, surface mount
4 wire, surface mount
Penetrates Inside wall
DC In disco enters box from Inside wall
240 feed to inverter. Note side knockouts are 1.5”, which allows 2 4/0 wires. Do we go in the bottom knockouts then?
Homeline
30A standard
AC In disco
DC Disco
6 ga exposed on roof for grounding frames
x2
x2
x2
Cabinet Procedure
g
Block 1 - 8’ stock
Block 2 - 4’ long stock
14”
14.25”
5
1
8
7
6
3
4
2
Block Piece 2
Attachment 1x8
10
Slit
11
12
13
14
Electrical - Build Notes
g
1
2
3
3
4
5
6
7
8
9
8
10
11
Final PV Hookup
Inverter
DC Feed
270V/27A
AC Feed
240V/30A
Notes:
Transfer Switch
g
MC4
PV
-DC
Ground reference of -DC is broken when fuse pops in case of ground fault.
Double Door (French Door) Install
SH2 door dimensions. SH2 install-note flex pan is not shown. SH4 Door Dimensions.
Plain door, Menards.
1
2
6
Synthesizing former docs.
3
4
Materials and Supplies:
Not. Paste like a dog gate across the front, then fold down.
Cabinets Detail
g
1
3
2
4
5
6
wall
level
7
8
Front face
9
9
10
(Upside down)
11
g
Notes:
PV Grounding
6c
Masking for Paint 2
11
2
g
1
2
3
4
5
6
1
7
8
9
10
12
13
14
14
Data Collection
g
Proper test is 2 orange lights on.
Incorrect - red light is on. No code exists for this, which happens with accidental wiring at 240. This case was miswired by using 12/2/2 wire and 2 hots, instead of wiring one neutral + 1 hot.
Possible Error codes - 240V is a missing error code
Dishwasher + washer is on 12/2/2
4” Hood vent Hole slants 1.5” to the left.
Metal new work box recessed and used as an old work box by mounting across stud right behind box. Everything was cut after BB was installed.
2 SA circuits are on 12/2/2
2nd Floor Vanity Outlets
B39
B40
BG1
B42
B41
BG2
From framing
From sheathing
2x6
blocking
2x4 blocking
2x6
blocking
Verify mirror width, vanity height of 4.8” sits on top of cabinet.
5’5” height to vanity light center -
60-70” industry standard
Caps for Vacuum Test Cheatsheet
Existing shower overflow tube
1.5” slip stub
1.5” slip to PVC
1.5” PVC stub
17 PSI test cap
or regular cap
Connect Vacuum Gauge to heater drain overflow
Use 2” balloon for washer 40 PSI for 2”
1
Disconnect overflows from 2 tubs, cap it using assembly at right
2
Close cleanout with 4” balloon.
30 PSI for 4”- needs bike pump or valve extender
3
Close the 2 tub drains
1
2
4
Cap 2 sinks with 2” cap, third sink is vacuum suction
5
Cap stack vent with 3” cap
6
6
7
7
8
Use 4” cap assembly for toilet 2, caulking temporarily to PVC
4” PVC to 4-3 closet elbow
4-3 closet elbow
9
Use balloon or 4” cap for toilet 1, caulking temporarily to PVC
4
5
Notes: must suck out 2 tub traps and washer traps by closing off everything outside of upstream of traps.
Cap toilet 2 with plug and temp of caulk around temp 4”. No knockout, otherwise can’t do floor
https://photos.google.com/photo/AF1QipMvfKkiEu6mzAvTV2Xe3Gysl5c6hD0KfEV3DmT4
Water Pressure Test
1
Connect pressure gauge assembly to any stub. Note assembly can be used for testing with compressor or internal water.
2
Shut the air end off for city water test.
3
Check all caps, add other side of sink stubs + caps on Floor 1. Turn off showers and washer valves. Turn off hose bib inside and outside - and main water supply valve inside house.
Short circuit hot and cold of water heater connection for testing the hot side.
Turn on water in pit. Turn on main water valve inside house, listening for any leaks.
4
5
Turn on shower water, turn on washer water, turn on hose bib inside and outside - to test all
existing valves.
1
2
3
3B
6
Prior to insulating and closing off
utility wall, turn on water again to make sure everything is still tight (punctures,
loosened connections). Keep water on to make any damage transparent.
6
Plumbing Install
Start 1st fl drain at main tee. Extend 3” pipe to next module.
Install water service entrance assy. Locate with respect to 7” Wallo access panel. Ideally 24” from LHS, depending on main stack. Countertop trim ends at 39”, make bottom of access 3” above that - or 42” to bottom of Wallo. Sink starts at 36” from LHS.
1
Make Kitchen Assembly according to 3-6-9 pattern in second set of modules, for 36” separation of sink drains. But - blocking is 2x6, water line as close to bottom of 2x6 as possible, so escutcheons don’t interfere with BB trim.
2
3
Install 2nd toilet plumbing assy. Key is 21”x61” vanity - toilet has min 15” space. 12” back from finished wall.
4
4
Install 2nd floor sink drain at 3-6-9 in the second set of utility wall modules
5
5
2”
3”
3-3-2”
3-3-2”
3-2”
2”
3
1
2ND Fl Sink
2”
2” long elbow
2”
2”
Kitchen
DfTF of Utility Wall PEX
(Design for Tolerancing + Design for Fiducials)
Concept: build the entire Utility Wall from a drawing w/o dimensions.
1
2
6
3
4
5
7
8
9
10
2”
3” pipe
3-3-2”
3-3-2”
3-2”
vBOM looking from i5
2x6
2x6
2x6
2x6
2x6
2x4
11
vBOM looking from i5
3.5” OD. Calc
1.5”
3.5” escutcheon covers 1.5” hole
5.625” OD
i5
i2
i2
10
11
Got 2 sink drains, 2 sink + toilet water supply
Hot from heater up stud
Showerhead Install + 12” Extension
Mark 15.6” + 1.6” from side and top of main shell
g
1
Attach shower holder.
6
Mount dropear to eccentric
7
Assemble faucet, mount to a block
2
Hang shower stem from top to faucet
3
4
Mark holes - DfF f. head
5
Drill 1-3/4 inch
8
Remove faucet, send eccentrics through tub,
Mount escutcheons.
Hang stem + faucet from mount.
Attach faucet to eccentrics
9
10
Fit from tub side, fix from back side with 3 screws that suck in to make escutcheons tight
(Mount is a 1x4 with a shorter 1x4 inset)
1x4
1x4 inset
1:02 with old style head mount, new one should shave 5 min. Old style has 2 sigma issues.
Utility Wall Cheatsheet - i1
Dropear Assembly - use template for spacing, and mount dropears on a 31.5” block. Spacing is about 6” for ears.
Horiz framing above dropears
Right-Mid Stud Can’t interfere with
main vent
Outer Frame
Beadboard
Right Fan framing
Double Wye Pipe even with top of frame
Plumbing Stub - 4.5” tall - Mid of tee is as high as possible or 9”?
But under blocking
Hose bib at 36”
Expansion tank
in cabinet
Tub 30” to edge,
31.5” to flange.
Tub spacer sticks out ½” beyond flange
g
2
1
6
9
2
4
5
Frame for tub flange.
Tub is 75-¾” to flange.
77-¼” with flange.
3
7
80” from tub bottom to shower head locates dropears
10
8
11
12
13
Utility Wall Build Overview
Build Water Supply Preassembly. Expansion Tank life is 5-10 years.
Install Water Expansion Assembly
Build 12 Plumbing Pre-assemblies. List: toilet 2 assy. Main stack. Etc.
Build 8 PEX Preassemblies
Install Main Vent
Frame interior modules. Move tubs into place, mark 2nd floor sill plate. 61.5” from framing. Wall now 8” wide. Sill plate still 2x4. No sill plate on 2nd floor.
Add all MEP
Close off beadboard, top and bottom. Include penetrations.
g
3
2
1
1
3
4
4
5
2
6
7
8
5
PV Combiner Submodule
2x4 mount block on edge
¾” mount plate
Combiner - view from top
Combiner Submodule Procedure:
Installation:
2x3 Treated
PV runners
combiner
2x3 Treated
Mount
mount
0.6” Treated plywood
PV runners
Combiner - lying on its back
tab
tab
1” deck screws
1” deck screws
7.1”
7.1”
8.5”
combiner
Mount plate
2x4
Top view
5”
30A AC
out
70A
PV Combiner to Power Center
Arrows show feed-through vs. connection, and cable vs wire
100A
DC In Disconnect
(2 pole)
30A AC in
70A
30A
30A DC
Neutral Feed-Through, but spliced, hots to breaker. Has ground bar.
See Detail
6-10 ga splice
Requires 15A fuse
1.42” wide
1” wide
Solar String Detail
Notes:
L
L
L
L
L
L
L
L
L
L
L
This string is connectable without wire extension
Combiner under panel
Verify 24” distance of panels to roof trim
Meter Base + Main Panel Cheatsheet
x2
x2
Steps:
1
3”
5’
1/2”
70”
6 ga
2
NOT glued
glued
5.5”
2”
2”
3
2.75”
6”
1.5”
2.5”
1”
Add ground rod subassemblies (later for meter base, now for mains)
vBOM - Meter Base to Main Box
2
4 ga
100A
To transfer switch
Inside the house
Breakers go up to 125A
outside the house
Wall
38” stub of 4/0 after entering box
70”
6 ga
38” inside box here
50” inside box here
70” of 4/0
3” in
2” out
Heat Pump Scope of Work
Indoor unit 8” from ceiling
Downspout ends at bottom of disconnect
2.5x2.5 downspout
½” PVC drain to ground
Probe for disconnect from inside
3.5” hole with 3” PVC angled down to outside
(2-⅜” hole for 2” pvc?)
Blocking 2- 2x8
Blocking 2x6
Outdoor unit ~2’ from ground - easy to mount
Mount, use screws with washers
Flush PVC into wall, angled down
Fix PVC with screw so it doesn’t pop out
Connect inner electrical
Put Nylog on flare of eccentric flare. Also Nylog when connecting tubes, just on flare, not threads. Tube ⅛” past block.
Pumpdown to 300 micron shown
Close off top of downspout
3 wires 10 ga to pump;
Included wire to indoor unit
Switch needs no blocking
Bedroom Electrical Modules
Box 0 - Subpanel
Box B1 - Bedroom 1
First wire staple here
131” 12/2 to B2
Module 27
Bedrooms Map
Box type, CI, device, wall plate definition
B1
B8
B2
B5
B7
B31
B6
B20
B4
B3
B19
B9
B10
B11
B12
B13
B15
B18
B16
B17
B14
B21
B22
B23
B24
B27
B25
B26
B28
B29
B30
B32
B34
B36
B35
B33
B22-26 are high, then drop to 27
Duplex, 2 of 4 devices - 28 CI;
(double blank)
32.5 CI w/ 2 devices
Light 12CI
2nd Floor
Light 12CI
High 16 CI(2Dev)
18 CI- Feedthru
Low
U
14/2 20 ci
U on other side
14/2
Closest bay bottom
14/2 16ci. No clamps, 1 devices =14 ci.
Mid bay
16 ci
12/2
14/2
14/2
12/2
Closest bay top
14/2 16 ci, 14 ci if no internal clamp, 2 dev
Mid bay
14/2 16 ci
Mid bay
14/2 12 ci
Mid bay
12/2 18 ci
14/2
16 ci
12/2
12/2
2 smoke alarms
Light
14/2 from here
18 CI single
22.5 CI
combo
16 CI
Design Notes:
20 CI
w/remote
22.5 CI
combo
14/2
16 CI
<1A for 2 fans
<1A for 2 lights
12CI
8CI
22.5 CI combo
All bedroom outlets 15A, but on 20A circuit. Retains about 900W at 100’ w/ 2% v drop. 5% drop is passable. Farthest point is 100’ for >1A loads
14/2 to light
12/2
14/2
to light
22.5 CI
Combo
12/2 feed, 14/2 onwards
They do have single at 24.5 ci but new work only
20 CI
w/remote
12/2 18CI
round
12/2 18CI
round
12/2 18CI
round
12/2 18CI
round
12/2 18CI
round
12/2 18CI
12/2 18CI
12/2 18CI
12/2 22.5CI
B37
B38
14/2-20 ci
B39-40
B41-B42
Vanity 2 - 2 device - 20 ci
Vanity 1 - 2 device 20 ci
K6*
B32B
Hood vent
Starts at subpanel going straight to 2nd floor
12/2
Plumbing Assy 6: Sinks
Kitchen Drain
Oversize bath sink to allow non-use of AAV if AHJ allows
Oversize kitchen sink to allow non-use of AAV if AHJ allows
Bath Drain
Sinks
Notes:
Instructions:
6
2”
3”
3”-1.5”
3”-2”
Power Hookup vBOM - Final
Use bell end as reducer is spigot (‘needs coupler’)
4’
Wire?
Needs cap
Use plain end of elbow as reducer is female socket
3-2.5 male spigot-female socket
3” but it doesn’t fit
Double Sink Vanity
g
Notes:
Conclusions:
Double Fixture Tee. Not a double sanitary tee. 2” to 1.5”
2-1.5”
2”
2”
Ideal
Cap
2”
2”
Actual Attempt
Cap
2”
2”
Correction 2
Cap
1.5”
Next Iteration
2”
2”
Cap
1.5”
1.5”
1.5”
1.5”
1.5”
2”
2”
Correction 1
Cap
1.5”
1.5”
Lights
g
4
4
5
7
6
9
1
10
2
11
12
Refrigerator Closet Shelves
g
Fridge Shelves:
4
5
3
Water Heater Cabinet 3
g
Prewire Kitchen Cabinet
Pre-plumb Kitchen Cabinet
Hard wired.
½”
3/4”? entry
¾”
x3
25 ci
¾”
Normal + Bypass
Inlet stub
To stub
Heater 2
Heater 1
Leaves the box
GFCI near water heater
Kitchen light
12 ga multiwire
Outlet is feed-through for water heater
Box ground