1 of 23

2026-2027 NEIGHBORHOOD STREET RECONSTRUCTION PROGRAM - Wycliff

HOA Meeting

December 16, 2025

2 of 23

Wycliff Map

Antioch Road

103rd Street

West Side - 2026

4.49 LM

East Side - 2027

4.56 LM

3 of 23

Project Overview

  • The roads in Wycliff were constructed ~ 55-60 years ago
  • Reached the end of their “useful life” - inefficient to maintain
  • Project will begin in the spring of 2026, and be completed in 2027
    • West side will begin first
  • Affinis Corp. is the engineering consultant
  • Project will be bid next week
    • Should have a contractor selected in mid-January
  • Contractor under contract in early February
  • Final public meeting to be hosted by City in mid-February

4 of 23

What to expect

  • Typical construction phasing:

  1. Tree removal
  2. Storm inlets and pipe installation
  3. Road demolition
  4. Grading
  5. Paving
  6. Sidewalks and Driveways
  7. Street lights
  8. Final Restoration (sod and trees)

5 of 23

6 of 23

Monkey Island

7 of 23

East Side Sidewalk

8 of 23

West Side Sidewalk

9 of 23

Farley St (103rd St to 106th St)

New sidewalk construction is planned to follow this route:

  • The east and west sides of the street from 103rd St to 105th St.
  • The west side from 105th St to 106th St.

New trees will be Lacebark Elms.

10 of 23

Wedd St - 105th Ter - Grant Ln

Wedd St Cul-De-Sac

New sidewalk construction is planned to follow this route:

  • The east side of the street from 104th St to Farley St.
  • The south side of 105th Ter, then follows the curve of Grant Ln on the east/north side.
  • At Wedd St. Cul-De-Sac, the sidewalk is to the east.

New trees will be Tulip Poplar, Swamp White Oak, and Ginkgo.

11 of 23

103rd St

New sidewalk construction is planned to follow this route:

  • The north side of the street from 103rd St to the end.

New trees will be Princeton Elm.

12 of 23

103rd Ter (Farley St to Grant Ln)

New sidewalk construction is planned to follow this route:

  • The north side of the street from Farley St to Grant Ln.

New trees will be Red Oak and Black Tupelo.

13 of 23

104th St (Mastin St to Grant Ln)

New sidewalk construction is planned to follow this route:

  • The north and south side of 104th St from Mastin St to Farley St.
  • The north side of 104th St from Farley St to Grant Ln.

New trees will be Lacebark Elm and Kentucky Coffeetree.

14 of 23

104th Ter (Farley St to Grant Ln)

New sidewalk construction is planned to follow this route:

  • The north side of 104th Ter from Farley St to Grant Ln.

New trees will be Bald Cypress.

15 of 23

106th - Benson - 104th St (Farley St to Antioch Rd)

New sidewalk construction is planned to follow this route:

  • The north side of 106th St from Farley St to England Dr.

New trees will be Princeton Elm, Elm, Valley Forge Elm, Black Tupelo Red Oak, and London Planetree.

16 of 23

106th - Benson - 104th St (Farley St to Antioch Rd)

New sidewalk construction is planned to follow this route:

  • The south side of 106th St from England Dr to 104th Terr.
  • The west side of Benson Dr from 104th Terr to W 104th St.
  • The west side of 104th St from W 104 St to Antioch Rd.

New trees will be Red Oak, Chinkapin Oak, and Tulip Poplar.

17 of 23

106th Cir Cul-De-Sac

New sidewalk construction is planned to follow this route:

  • The south side of 106th St from England Dr to 104th Terr.

New trees will be Red Oak, Chinkapin Oak, and Tulip Poplar.

18 of 23

England - 104th Ter & 104th Ter Cul-De-Sac

New sidewalk construction is planned to follow this route:

  • The west side of England Dr from 106th St to 104th Ter CDS.
  • The north side of 104th Ter from 104th Ter CDS to 106th St.
  • The east side of 104th Ter CDS from 104th Ter/ England Dr to End.

New trees will be Tulip Poplar and Kentucky Coffeetree.

19 of 23

105th St (England Dr to 104th Ter)

New sidewalk construction is planned to follow this route:

  • The north side of 105th St from England Dr to 104th St.

New trees will be Ginko.

20 of 23

105th Ter (England Dr to 104th Ter)

New sidewalk construction is planned to follow this route:

  • The north side of 105th St from England Dr to 104th St.

New trees will be Bald Cypress.

21 of 23

104th St & 104th St Cul-De-Sac

New sidewalk construction is planned to follow this route:

  • The north side of 104th St from 104th St to end.
  • The west side of 104th St CDS from 104th St to end.

New trees will be American Linden and Chinkapin Oak.

22 of 23

Eby St

Benson St Cul-De-Sac

New sidewalk construction is planned to follow this route:

  • The west side of Eby St from 104th St to 103rd St.
  • The west side of Benson St CDS from 104th St to end.

New trees will be Chinkapin Oak.

23 of 23

Questions?