SAP Plant Maintenance
Visual Instructions
Visual Instructions are assigned to Operations to provide enhanced documentation on maintenance instruction.
Checking in IDES
Doc type “VI” (Visual Instruction)
IDES ECC6.0 EhP7
“VI” example
Doc no. P-1000
Doc Type VI
Doc Part 000
Doc Version 00
RH Applications.
For details of how to Design and Develop files with this file format, please refer to SAP
To be able to view this file, you must have installed/activated the
3D Visual Enterprise
3D Viewer
(LOG_EAM_VE_INT)
First either assign the “VI” file to the FL or EQ master
Assign
Doc no. P-1000
Doc Type VI
Doc Part 000
Doc Version 00
Assign TEQ-20
with the “VI” file
press ENTER
Next, click the “VI” ICON
Automatic copied from Equipment TEQ-20
Activate
“VI” Activated.
Click
You can use your MOUSE to click on the PUMP to rotate it to view it 3D
Tools available to Dissect or Reassemble to PUMP (you need to try it yourself)
The other main use of the “VI” is for Visual Instructions
As my CITRIX connection is Terrible, I will show it directly via CV02N
Click Step 1
Video will animated step 1
Click Step 2
System show Animation of how to Remove the Six 10 IN X ½ IN Bolts
You have to try it yourself to see the Animated Maintenance “Visual Instruction”.
(Do note that require substantial efforts and training to create a “VI” file, what is shown is an example already provided by IDES)