1 of 4

NEED TO PACK IT

PIPING NEED TO BE DONE

NEED CABLE TRAY

MCB BOX NEEDED

NEED MORE LIGHTING

MCB BOX NEEDED

2 of 4

CANT DO ANYTHING

SWITCH TO BE REPLACED

CABLE TRAY NEED TO BE PLACED

CABLE TRAY NEED TO BE PLACED

3 of 4

NEED TO BE PACKED

CHANGE THE BOARD (4)

PAINT

CABLE TRAY NEED TO BE PLACED

TILES NEED TO BE CHANGED

PLY NEED TO BE CHANGED

4 of 4

PIPING NEEDED

MCB BOX

PAINT NEEDED

PIPING NEEDED

NEED TO SHORTEN THE WIRE

CLEANING