1 of 39

October 20, 2022

Smart Work Zone

Carlos Duran, P.E., PTOE, C-NUA

SMART WORK ZONES

AECOM

2 of 39

Need for Smart Work Zones

2

2017: 18 fatalities, 31 serious injuries

2018: 17 fatalities, 23 serious injuries

2019: 15 fatalities, 22 serious injuries

2020: 11 fatalities, 23 serious injuries

Arizona work zone crash statistics from law enforcement reports over the past five years

SMART WORK ZONES

AECOM

3 of 39

Need for Smart Work Zones

3

SMART WORK ZONES

AECOM

4 of 39

Our responsibility is ensuring that our work zones are safe

for daily drivers and workers of every project

Smart work zones allow us to use a variety of intelligent technologies

so we can better monitor roadway conditions and

communicate those conditions to drivers

4

SMART WORK ZONES

AECOM

5 of 39

What is Smart Work Zone?

Agencies uses intelligent transportation system technologies including:

Traffic Sensors (RSVD, RSU)

Digital Signage (Portable or static DMS)

CCTV cameras

These are tied in-to the agency’s Traffic and Incident Management System

Detect roadway conditions and communicate to motorists. 

5

SMART WORK ZONES

AECOM

6 of 39

Smart

Work Zone

Systems

6

SMART WORK ZONES

AECOM

7 of 39

Temporary Queue Detection System

7

Scenario:

    • Incoming vehicle being confronted with slowed or stopped traffic in work zone

Countermeasure:

  • A system with queue detector, messaging feature, and a network to link the two
  • Increase situational awareness

SMART WORK ZONES

AECOM

8 of 39

Temporary Speed Monitoring System

8

Scenario:

    • Excessive, unsafe speed in work zone
    • Non-uniformity of speed (high or low)

Countermeasure:

  • Basic system: trailer mounted radar detector with 2-digit LED message board
  • Advanced: speed compliance system with flashing blue light
  • Improve speed compliance

SMART WORK ZONES

AECOM

9 of 39

Temporary Construction Equipment Alert System

9

Scenario:

    • Construction vehicle merging to traffic stream from work zone

Countermeasure:

  • Truck detector, a message board and wireless communication to trigger the sign
  • No connection to TMC required
  • Inform approaching vehicle

SMART WORK ZONES

AECOM

10 of 39

Temporary Travel Time System

10

Scenario:

    • Motorist need travel time / delay in advance work zone

Countermeasure:

  • Detector throughout the work zone to calculate travel time, message board and communication links
  • Make informed decision, set realistic expectation, encourage diversion

SMART WORK ZONES

AECOM

11 of 39

Temporary Incident Detection and Surveillance System

11

Scenario:

    • Higher than normal incident risk in most work zones and worse impact

Countermeasure:

  • Speed detector, CCTV and communication links
  • Reduce the time to detect, respond and clear incidents

SMART WORK ZONES

AECOM

12 of 39

Temporary Over-Height Vehicle Warning System

12

Scenario:

    • Low Clearance Structure, or temporary utilities.

Countermeasure:

  • Truck detector, CCTV and communication links
  • Reduce the time to detect, respond and clear incidents

SMART WORK ZONES

AECOM

13 of 39

Loop 375

Smart

Work Zone

13

SMART WORK ZONES

AECOM

14 of 39

Smart Work Zones LP 375

14

SMART WORK ZONES

AECOM

15 of 39

Smart Work Zones LP 375

15

SMART WORK ZONES

AECOM

16 of 39

Smart Work Zones LP 375

16

SMART WORK ZONES

AECOM

17 of 39

Existing Ramp Configuration

17

Zaragoza

Pan American

Alameda

N. Loop

Socorro

RR Crossing

Port of Entry

US/MX

I-10

SMART WORK ZONES

AECOM

18 of 39

Existing Ramp Configuration

18

Zaragoza

Pan American

Alameda

Port of Entry

US/MX

I-10

SMART WORK ZONES

AECOM

19 of 39

Existing Ramp Configuration

19

Zaragoza

Pan American

Alameda

Port of Entry

US/MX

I-10

SMART WORK ZONES

AECOM

20 of 39

Proposed Ramp Configuration

20

Zaragoza

Pan American

Alameda

N. Loop

Socorro

RR Crossing

SMART WORK ZONES

AECOM

21 of 39

Proposed Ramp Configuration

21

Zaragoza

Pan American

Alameda

N. Loop

Socorro

RR Crossing

New Truck Route

SMART WORK ZONES

AECOM

22 of 39

Complex Traffic Control Plan Sequence

22

SMART WORK ZONES

AECOM

23 of 39

Queue Detection System Loop 375

23

SMART WORK ZONES

AECOM

24 of 39

Queue Detection System Loop 375 (One ramp)

24

@ Frontage Road

SMART WORK ZONES

AECOM

25 of 39

Queue Detection System Loop 375 (One Ramp)

25

@ Frontage Road

@ Main Lanes

@ Main Lanes

SMART WORK ZONES

AECOM

26 of 39

Queue Detection System Loop 375 (One Ramp)

26

@ Frontage Road

@ Main Lanes

@ Main Lanes

@ Main Lanes

@ Main Lanes

SMART WORK ZONES

AECOM

27 of 39

Queue Detection System Loop 375

27

SMART WORK ZONES

AECOM

28 of 39

Queue Detection System Loop 375

28

SMART WORK ZONES

AECOM

29 of 39

Sierra Blanca

Smart

Work Zone

29

SMART WORK ZONES

AECOM

30 of 39

Sierra Blanca

30

SMART WORK ZONES

AECOM

31 of 39

Sierra Blanca

31

SMART WORK ZONES

AECOM

32 of 39

Sierra Blanca

32

Long Queue Lines

SMART WORK ZONES

AECOM

33 of 39

Sierra Blanca

33

SMART WORK ZONES

AECOM

34 of 39

Sierra Blanca

34

SMART WORK ZONES

AECOM

35 of 39

Sierra Blanca

35

DMS

DMS

DMS

SMART WORK ZONES

AECOM

36 of 39

Sierra Blanca

36

SMART WORK ZONES

AECOM

37 of 39

Sierra Blanca

37

SMART WORK ZONES

AECOM

38 of 39

Sierra Blanca

38

SMART WORK ZONES

AECOM

39 of 39

October 20, 2022

Questions?

carlos.duran@aecom.com

SMART WORK ZONES

AECOM