CARBON MESA
MALIBU
22002 Carbon Mesa Road • Malibu, CA 90265
Main Residence + 3 ADUs • Central Pool • Circular Access Road
ICON Titan Redevelopment | Proposal for Capital Advisory | October 2026
ALTERNATIVE EARTH
EXECUTIVE SUMMARY
Opportunity
Redevelop the cleared 1.13-acre Carbon Mesa lot into a four-unit ICON Titan community: a ~6,985 SF main residence and three ~1,100 SF ADUs. The program centers a pool courtyard, provides circular street access with dedicated parking, and uses fire-resistant printed concrete walls suited to Malibu’s Very High Fire Hazard Severity Zone.
Key Figures
• Lot: ~1.13 acres (APN 4451009023)
• Total living space: ~11,285 SF
• Incremental development: ~$3.0M
• Construction: $1.5M (main + 3 ADUs)
• Underwritten ADU rent: $216,000 / year
Strategic Fit
✓ Cleared post-fire lot, ready for new construction
✓ Full estate program: main residence + 3 ADUs
✓ ICON FormCrete fire and wind performance
✓ Circular road + central pool matching concept
✓ Streamlined ADU process in Malibu
✓ Premium Carbon Mesa location
ALTERNATIVE EARTH
SITE CONCEPT
Program
• Main Residence: ~6,985 SF (4 floors)
• Unit 1 ADU: ~1,100 SF
• Unit 2 ADU: ~1,100 SF
• Unit 3 ADU: ~1,100 SF
• Total above-grade living: ~11,285 SF
Site Organization
• Circular access road with full loop
• Dedicated parking for each unit
• Central pool and courtyard
• Community bath house + gym, BBQ
• Native landscaping, solar-ready
• ICON Titan printed concrete walls
ALTERNATIVE EARTH
TECHNOLOGY — ICON TITAN
System
• Titan package: $899,000 (printer, pump, BuildOS, training, warranty)
• $5,000 reservation deposit; deliveries expected early 2027
• Owned capital asset for this project and future sites
• Recent $200M Series D backing
Construction Advantages
• FormCrete walls: 2+ hour fire rating, 175 MPH wind resistance
• Wall systems ~$20/sq ft
• Rapid printing (days vs. weeks) with reduced on-site labor
• Up to 30% less material waste
• Multi-story capability suited to the 4-floor program
ALTERNATIVE EARTH
REGULATORY PATH — MALIBU
Framework
• Entire City of Malibu is in the California Coastal Zone under a certified Local Coastal Program
• Ordinance No. 535 (June 2026) aligns MMC Chapter 17.44 with state ADU law
• ADU size up to 1,000 sq ft (local track); by-right detached floor of 800 sq ft
• Detached height typically 16 ft; 4 ft side/rear setbacks
• Main residence subject to standard coastal and zoning review
• Citywide Very High Fire Hazard Severity Zone; septic capacity and street access must be confirmed
Process Notes
Detached ADUs generally require a Coastal Development Permit. AB 462 places ADU CDPs on a concurrent 60-day clock with no public hearing and no Coastal Commission appeal. ICON fire-resistant construction supports compliance in the Very High Fire Hazard Severity Zone. Pre-application with Malibu Planning is recommended.
ALTERNATIVE EARTH
MARKET & UNDERWRITING
Location
Carbon Mesa is a high-end Malibu enclave with ocean and canyon exposure near Carbon Beach. The cleared lot supports a full estate program targeting both owner occupancy of the main residence and premium rental of the ADUs.
ADU Rental Underwriting
Base case applied consistently:
$6,000 per ADU per month × 3 units
= $18,000 per month
= $216,000 gross annual rent
Main residence value and use are separate from ADU rental underwriting.
Investment Thesis
A cleared Carbon Mesa lot redeveloped as a complete ICON-printed estate (main residence + 3 ADUs). The $1.5M construction budget and owned Titan printer create a scalable platform. ADU rental income of $216,000 supports the project while the main residence captures owner or residual value.
ALTERNATIVE EARTH
FINANCIAL PRO FORMA
Incremental Development Cost
Item
Amount
Notes
ICON Titan System
$899,000
Owned capital asset
Total Construction (Main + 3 ADUs)
$1,500,000
Specified construction budget
Site Work, Pool, Circular Road
$400,000
Driveways, pool, landscaping, amenities
Soft Costs & Contingency
$200,000
Design, CDP, permits, engineering
Total Incremental Development
$2,999,000
Lot basis separate
Returns Summary
ADU gross rent (underwriting): $216,000 per year. Main residence provides owner-occupancy or residual value. Residual value also includes the owned Titan printer.
ALTERNATIVE EARTH
DEVELOPMENT TIMELINE
Phase 1: Entitlement (0–6 months)
Confirm site control of the cleared lot. Reserve the ICON Titan. Engage Malibu coastal architect and engineer. Pre-application with Planning for the main residence and ADUs. Finalize designs matching the concept program.
Phase 2: Permitting & Construction (6–18 months)
Submit applications. Take Titan delivery. Print walls for the main residence and three ADUs. Complete foundations, roofs, MEP, finishes, circular road, parking, and central pool.
Phase 3: Stabilization
Complete the main residence for owner use or sale. Lease the three ADUs at the $6,000 per month underwriting. Deploy the Titan on subsequent projects.
ALTERNATIVE EARTH
NEXT STEPS
Immediate Actions
1. Confirm title and site control for the cleared lot
2. Submit ICON Titan reservation ($5,000 deposit)
3. Retain Malibu coastal architect and civil engineer
4. Schedule pre-application meeting with City of Malibu Planning
5. Complete septic evaluation and topographic survey
6. Refine pro forma with site-specific contractor pricing
The Opportunity
A cleared Carbon Mesa lot redeveloped as a complete ICON-printed estate with main residence and three ADUs. Fire-resilient construction, premium location, and a scalable printer platform.
CARBON MESA
Redevelopment
Main Residence + 3 ADUs
22002 Carbon Mesa Road • Malibu, CA 90265
Proposal Stage | October 2026