1 of 10

CARBON MESA

MALIBU

22002 Carbon Mesa Road • Malibu, CA 90265

Main Residence + 3 ADUs • Central Pool • Circular Access Road

ICON Titan Redevelopment | Proposal for Capital Advisory | October 2026

2 of 10

ALTERNATIVE EARTH

EXECUTIVE SUMMARY

Opportunity

Redevelop the cleared 1.13-acre Carbon Mesa lot into a four-unit ICON Titan community: a ~6,985 SF main residence and three ~1,100 SF ADUs. The program centers a pool courtyard, provides circular street access with dedicated parking, and uses fire-resistant printed concrete walls suited to Malibu’s Very High Fire Hazard Severity Zone.

Key Figures

• Lot: ~1.13 acres (APN 4451009023)

• Total living space: ~11,285 SF

• Incremental development: ~$3.0M

• Construction: $1.5M (main + 3 ADUs)

• Underwritten ADU rent: $216,000 / year

Strategic Fit

✓ Cleared post-fire lot, ready for new construction

✓ Full estate program: main residence + 3 ADUs

✓ ICON FormCrete fire and wind performance

✓ Circular road + central pool matching concept

✓ Streamlined ADU process in Malibu

✓ Premium Carbon Mesa location

3 of 10

ALTERNATIVE EARTH

SITE CONCEPT

Program

• Main Residence: ~6,985 SF (4 floors)

• Unit 1 ADU: ~1,100 SF

• Unit 2 ADU: ~1,100 SF

• Unit 3 ADU: ~1,100 SF

• Total above-grade living: ~11,285 SF

Site Organization

• Circular access road with full loop

• Dedicated parking for each unit

• Central pool and courtyard

• Community bath house + gym, BBQ

• Native landscaping, solar-ready

• ICON Titan printed concrete walls

4 of 10

ALTERNATIVE EARTH

TECHNOLOGY — ICON TITAN

System

• Titan package: $899,000 (printer, pump, BuildOS, training, warranty)

• $5,000 reservation deposit; deliveries expected early 2027

• Owned capital asset for this project and future sites

• Recent $200M Series D backing

Construction Advantages

• FormCrete walls: 2+ hour fire rating, 175 MPH wind resistance

• Wall systems ~$20/sq ft

• Rapid printing (days vs. weeks) with reduced on-site labor

• Up to 30% less material waste

• Multi-story capability suited to the 4-floor program

5 of 10

ALTERNATIVE EARTH

REGULATORY PATH — MALIBU

Framework

• Entire City of Malibu is in the California Coastal Zone under a certified Local Coastal Program

• Ordinance No. 535 (June 2026) aligns MMC Chapter 17.44 with state ADU law

• ADU size up to 1,000 sq ft (local track); by-right detached floor of 800 sq ft

• Detached height typically 16 ft; 4 ft side/rear setbacks

• Main residence subject to standard coastal and zoning review

• Citywide Very High Fire Hazard Severity Zone; septic capacity and street access must be confirmed

Process Notes

Detached ADUs generally require a Coastal Development Permit. AB 462 places ADU CDPs on a concurrent 60-day clock with no public hearing and no Coastal Commission appeal. ICON fire-resistant construction supports compliance in the Very High Fire Hazard Severity Zone. Pre-application with Malibu Planning is recommended.

6 of 10

ALTERNATIVE EARTH

MARKET & UNDERWRITING

Location

Carbon Mesa is a high-end Malibu enclave with ocean and canyon exposure near Carbon Beach. The cleared lot supports a full estate program targeting both owner occupancy of the main residence and premium rental of the ADUs.

ADU Rental Underwriting

Base case applied consistently:

​

$6,000 per ADU per month × 3 units

= $18,000 per month

= $216,000 gross annual rent

​

Main residence value and use are separate from ADU rental underwriting.

Investment Thesis

A cleared Carbon Mesa lot redeveloped as a complete ICON-printed estate (main residence + 3 ADUs). The $1.5M construction budget and owned Titan printer create a scalable platform. ADU rental income of $216,000 supports the project while the main residence captures owner or residual value.

7 of 10

ALTERNATIVE EARTH

FINANCIAL PRO FORMA

Incremental Development Cost

Item

Amount

Notes

ICON Titan System

$899,000

Owned capital asset

Total Construction (Main + 3 ADUs)

$1,500,000

Specified construction budget

Site Work, Pool, Circular Road

$400,000

Driveways, pool, landscaping, amenities

Soft Costs & Contingency

$200,000

Design, CDP, permits, engineering

Total Incremental Development

$2,999,000

Lot basis separate

Returns Summary

ADU gross rent (underwriting): $216,000 per year. Main residence provides owner-occupancy or residual value. Residual value also includes the owned Titan printer.

8 of 10

ALTERNATIVE EARTH

DEVELOPMENT TIMELINE

Phase 1: Entitlement (0–6 months)

Confirm site control of the cleared lot. Reserve the ICON Titan. Engage Malibu coastal architect and engineer. Pre-application with Planning for the main residence and ADUs. Finalize designs matching the concept program.

Phase 2: Permitting & Construction (6–18 months)

Submit applications. Take Titan delivery. Print walls for the main residence and three ADUs. Complete foundations, roofs, MEP, finishes, circular road, parking, and central pool.

Phase 3: Stabilization

Complete the main residence for owner use or sale. Lease the three ADUs at the $6,000 per month underwriting. Deploy the Titan on subsequent projects.

9 of 10

ALTERNATIVE EARTH

NEXT STEPS

Immediate Actions

1. Confirm title and site control for the cleared lot

2. Submit ICON Titan reservation ($5,000 deposit)

3. Retain Malibu coastal architect and civil engineer

4. Schedule pre-application meeting with City of Malibu Planning

5. Complete septic evaluation and topographic survey

6. Refine pro forma with site-specific contractor pricing

The Opportunity

A cleared Carbon Mesa lot redeveloped as a complete ICON-printed estate with main residence and three ADUs. Fire-resilient construction, premium location, and a scalable printer platform.

10 of 10

CARBON MESA

Redevelopment

Main Residence + 3 ADUs

22002 Carbon Mesa Road • Malibu, CA 90265

Proposal Stage | October 2026