SAP Plant Maintenance
EQ created first,
Later need to link to Material-Serial
but
Serial-EQ Number
not necessary synchronized
In this example, I am using this settings for the Serial Profile
Serial 03 Obligatory
EQ 01 Proposal w/o EQ
(but this is not necessary the case to address the issue of this scenario)
Because I am manually creating an EQ via IE01 and not using GR to Generate Serial-EQ. So Be Careful what Serial Profile setting to use depending on your scenario for PR, PO, and Inventory Movement
The Serial Profile is applicable for Inventory Movement and PR or PO creation for Plant Maintenance.
Manually Create Serial to Link to Equipment within PM (eg: IE02) do not require the Serial Profile
Most important is Serial Level to be BLANK (for our scenario title)
Simulation 1
EQ 10006642
Serial A
Serial alphanumeric and
NOT Sync to EQ
an EQ to be created without serial
EQ with internal number 10006642
created
In the dialog box, select “Serial number” OK
Enter Serial
= A
Not same as EQ
press ENTER
This is OK due to Serial Level BLANK
(sync of Serial-EQ
not mandatory)
Simulation 2
EQ 10006643
Serial 3
Serial (Internal next running number) and NOT Sync
EQ with internal number 10006643
created w/o Serial
In the dialog box, select “Serial number” OK
In Serial Tab
enter ONLY Material
press ENTER
System show Last Serial No is 2
Manually type in
no. 3 (as last serial is 2)
and SAVE
EQ Saved
Note numeric Serial created (sequential as last serial was 2)
Simulation 3
EQ 10006644
Serial 10006644
Serial try to Sync to EQ
EQ with internal number 10006644
created w/o Serial
In the dialog box, select “Serial number” OK
Manual type
Material Y100
and Serial 10006644
and SAVE
Note Serial = EQ
GR serial into STOCK
(EQ status must be AVLB)
GR Others
As the EQ already exist, the EQs are not created for the Serial Entered in GR