1 of 110

Tangga Core Depan (Tangga 1)

Sudah Ter-Cor

7/01/25

3 m3

Adhimix

17/01/25

5 m3

PBI

7/2/25

4 m3

Adhimix

2 of 110

Tangga Core Depan (Tangga 1)

Sudah Ter-Cor

5/3/25

5 m3

MERAK

10/4/25

4 m3

MERAK

11/05/25

4,5 m3

MERAK

3 of 110

Tangga Core Depan (Tangga 1)

Sudah Ter-Cor

21/05/25

4,5 m3

MERAK

11/06/25

4,5 m3

MERAK

17/06/25

4,5 m3

MERAK

4 of 110

Tangga Core Depan (Tangga 1)

Sudah Ter-Cor

21/06/25

4,5 m3

MERAK

26/06/25

4,5 m3

MERAK

01/07/25

4,5 m3

MERAK

25/07/25

5 of 110

Tangga Core Depan (Tangga 1)

Sudah Ter-Cor

02/07/25

4,5 m3

MERAK

09/07/25

4,5 m3

MERAK

27/07/25

4,5 m3

MERAK

6 of 110

Tangga Core Depan (Tangga 1)

Sudah Ter-Cor

10/07/25

4,5 m3

MERAK

10/07/25

4,5 m3

MERAK

7 of 110

Tangga Core Depan (Tangga 1)

Sudah Ter-Cor

13/07/25

4,5 m3

MERAK

8 of 110

Tangga Core Depan (Tangga 1)

Sudah Ter-Cor

16/07/25

5 m3

MERAK

28/07/25

5 m3

MERAK

9 of 110

Tangga Core Depan (Tangga 1)

Sudah Ter-Cor

30/07/25

5 m3

MERAK

03/08/25

5 m3

MERAK

10 of 110

Tangga Core Depan (Tangga 1)

Sudah Ter-Cor

05/08/25

5 m3

MERAK

20/08/25

4,5 m3

MERAK

26/08/25

3 m3

MERAK

11 of 110

Tangga Utara (tangga 2)

Sudah Ter-Cor

11/02/25

5 m3

Adhimix

19/02/25

8 m3

Adhimix

2/3/25

5 m3

Merak

12 of 110

Tangga Utara (tangga 2)

Sudah Ter-Cor

10/4/25

4,5 m3

Merak

30/4/25

5 m3

Merak

15/5/25

5,5 m3

Merak

13 of 110

21/5/25

5 m3

Merak

Tangga Utara (tangga 2)

Sudah Ter-Cor

04/6/25

4,5 m3

Merak

15/6/25

4,5 m3

Merak

14 of 110

Tangga Utara (tangga 2)

Sudah Ter-Cor

22/06/25

4,5 m3

Merak

13/07/25

4,5 m3

Merak

25/07/25

4,5 m3

Merak

15 of 110

Tangga Utara (tangga 2)

Sudah Ter-Cor

11/08/25

m3

Merak

16 of 110

Tangga Core Belakang (Tangga 3)

21/12/24

6m3

Merak

30/7/24

4,5 m3

Merak

8/11/24

5 m3

Merak

Sudah Ter-cor

17 of 110

2/2/25

4,5 m3

Adhimix

9/1/25

3 m3

PBI

Tangga Core Belakang (Tangga 3)

Sudah Ter-cor

11/3/25

m3

PBI

18 of 110

Tangga Core Belakang (Tangga 3)

Sudah Ter-cor

13/4/25

4 m3

Merak

30/4/25

4,5 m3

Merak

13/05/25

4,5 m3

Adhimix

19 of 110

13/4/25

4,5 m3

MERAK

19/05/25

5 m3

MERAK

20/05/25

5 m3

MERAK

Tangga Core Belakang (Tangga 3)

Sudah Ter-cor

20 of 110

27/4/25

4,5 M3

Adhimix

16/05/25

5,5 M3

Adhimix

24/05/25

4,5 M3

Merak

Tangga Core Belakang (Tangga 3)

Sudah Ter-cor

21 of 110

25/5/25

4,5 M3

Merak

29/5/25

4,5 M3

Merak

01/6/25

4,5 M3

Merak

Tangga Core Belakang (Tangga 3)

Sudah Ter-cor

22 of 110

Tangga Core Belakang (Tangga 3)

Sudah Ter-cor

17/06/25

4,5 M3

Merak

25/06/25

4,5 M3

Merak

27/06/25

4,5 M3

Merak

23 of 110

Tangga Core Belakang (Tangga 3)

Sudah Ter-cor

09/07/25

4,5 M3

Merak

23/07/25

4,5 M3

Merak

24 of 110

8/11/24

15/11/24

PILECAP B3

19/11/24

11/12/24

19/11/24

28/05/25

45m3 (Merak)

21/05/25

(Merak)

14/06/25

42,5m3 (Merak)

25 of 110

BASEMENT 3

5/8/24

ADHIMIX 448 m3

11/7/24

ADHIMIX

29/11/24

Merak

84,5m3

21/12/24

Merak

58,5m3

27/01/25

MERAK 98 m3

21/05/25

MERAK

m3

28/05/25

MERAK

45m3

03/06/25

MERAK

2 m3

04/06/25

MERAK

70 m3

11/06/25

MERAK

6 m3

14/06/25

MERAK

42,5 m3

26/06/25

MERAK

3m3

26 of 110

BASEMENT 3

13/06/25

MERAK

33 m3

13/06/25

MERAK

8 m3

13/06/25

MERAK

2 m3

19/06/25

MERAK

23 m3

22/06/25

MERAK

16 m3

25/06/25

MERAK

35 m3

26/06/25

MERAK

21 m3

28/06/25

MERAK

1 m3

27 of 110

12/3/25

21m3

Merak

Lantai Mezz STP Slab dan Balok (FFL -6.200 & FFL -6.400)

13/3/25

Merak

16/4/25

52 m3

Merak

28 of 110

Lantai Mezz STP Dinding Dan Kolom (FFL -6.200 & FFL -6.400)

12/3/25

12 m3

Merak

9/3/2025

PBI dan Merak

1m3

29 of 110

BASEMENT 2

11/06/24

ADHIMIX 226 m3

03/05/24

ADHIMIX

266 m3

26/05/24

ADHIMIX

27/05/24

ADHIMIX 345 m3

14/06/24

ADHIMIX 331 m3

15/7/24

ADHIMIX

3/7/24

ADHIMIX

8/09/24

ADHIMIX

7/9/24

ADHIMIX

18/9/24

ADHIMIX

21/06/2

4

28/06/24

ADHIMIX

25/06/24

ADHIMIX

18/07/24

ADHIMIX

9/4/25

MERAK

10 m3

17/04/25

Merak

52 m3

23/04/25

Merak

5 m3

02/05/25

Adhimix

5 m3

07/05/25

MERAK

7 m3

13/07/25

Merak

135 m3

30 of 110

BASEMENT 2

9/3/2025

PBI dan Merak

1m3

31 of 110

DINDING PARAPET BASEMENT 2 - B1

32 of 110

LS 1

LS 2

LS 3

LANTAI BASEMENT 2

SEPARATOR BEAM

SEPARATOR BEAM

BAJA OPENINGAN

DINDING LIFT

33 of 110

BASEMENT 1

29/7/24

PBI 154 m3

9/8/24

ADHIMIX 105 m3

15/9/24

PBI

68 m3

10/9/24

ADHIMIX 110 m3

17/9/24

ADHIMIX

126 m3

13/9/24

ADHIMIX 28 m3

24/9/24

PBI 193 m3

16/8/24

ADHIMIX 119 m3

30/8/24

PBI 28 m3

7/9/24

PBI

2/10/24

ADHIMIX

160,5 m3

8/10/24

ADHIMIX 84 m3

12/9/24

ADHIMIX 28 m3

24/10/24

ADHIMIX

18/4/25

Merak 6,5 m3

23/04/25

MERAK

95 m3

26/4/25

Merak 6 m3

03/05/25

ADHIMIX 49 m3

10/05/25

Adhimix 18 m3

11/05/25

Merak

4 m3

12/05/25

Adhimix

8 m3

13/05/25

Adhimix

7 m3

15/05/25

Merak

7 m3

16/05/25

Adhimix

5 m3

22/05/25

Merak

7 m3

04/6/25

Merak 4 m3

11/6/25

Merak 5 m3

25/06/25

Merak

3 m3

28/6/25

Merak 11 m3

23/07/25

Merak

10 m3

24/07/25

Merak

7 m3

25/07/25

Merak

6,5 m3

28/07/25

Merak

35 m3

34 of 110

BASEMENT 1

7/9/24

8/8/24

ADHIMIX

7 m3

11/8/24

ADHIMIX 17 m3

12/8/24

ADHIMIX 14 m3

13/8/24

ADHIMIX 18 m3 (

19/8/24

ADHIMIX 28 m3

21/8/24

ADHIMIX

28 m3

20/9/24

14/8/24

15/9/24

13/9/24

19/9/24

21/9/24

4/9/24

ADHIMIX 13 m3

7/10/24

ADHIMIX

7 m3

7/10/24

ADHIMIX 14 m3 (

9/10/24

MERAK 11,5 m3

12/10/24

ADHIMIX 14 m3

5/11/24

27/04/25

ADHIMIX 3 m3

27/04/25

ADHIMIX 3 m3

11/05/25

MERAK 1 m3

04/07/25

MERAK 1 m3

29/05/25

Merak

1 m3

25/06/25

Merak

1 m3

35 of 110

DINDING PARAPET LT BASEMENT 1

04/07/25

Merak Vol = 5 m3

06/07/25

Merak Vol = 5 m3

10/07/25

Merak Vol = 6 m3

15/07/25

Merak Vol = 6,5 m3

36 of 110

LS 1

LS 2

LS 3

LANTAI BASEMENT 1

SEPARATOR BEAM

SEPARATOR BEAM

BAJA OPENINGAN

DINDING LIFT

37 of 110

LANTAI 1

21/9/24

ADHIMIX 166 m3

15/9/24

PBI 49 m3

27/8/24

ADHIMIX 133 m3

3/10/24

ADHIMIX 98 m3

1/9/24

PBI 109 m3

26/9/24

Adhimix

189 m3

30/9/24

ADHIMIX

147 m3

17/9/24

PBI 154 m3

15/10/24

ADHIMIX 238 m3

13/11/24

Merak

20 m3

15/11/24

ADHIMIX

2/12/24

Merak

65 m3

8/12/24

Adhimix

126m3

21/12/24

Merak

6m3

27/12/24

Adhimix

126m3

2/3/25

Merak

60 m3

3/3/25

Merak

28 m3

26/3/25

Adhimix

35 m3

20/04/25

Merak

45 m3

21/04/25

Merak

35 m3

22/04/25

Merak

21 m3

26/04/25

4 m3

01/05/25

Merak

30 m3

12/05/25

Adhimix

50m3

03/06/25

Merak

50 m3

26/06/25

Merak

55 m3

08/08/25

Merak

75m3

11/08/25

Merak

63 m3

17/08/25

Merak

36m3

38 of 110

LANTAI 1

30/8/24

ADHIMIX 35 m3

4/9/24

19/9/24

21/9/24

ADHIMIX 29 m3

27/9/24

3/9/24

9/9/24

16/8/24

29/9/24

1/10/24

2/10/24

ADHIMIX 38,5 m3

3/10/24

ADHIMIX 21 m3

4/10/24

ADHIMIX

9 m3

6/10/24

ADHIMIX

  1. m3

16/10/24

ADHIMIX

25/10/24

ADHIMIX

  1. m3

19/11/24

ADHIMIX 7 m3

15/11/24

ADHIMIX 4 m3

17/11/24

ADHIMIX 17 m3

21/11/24

ADHIMIX 40 m3

4/12/24

ADHIMIX 7 m3

7/12/24

ADHIMIX 14 m3

4/3/25

MERAK 11 m3

39 of 110

DINDING PARAPET LANTAI 1

29/5/25

Merak Vol = 1 m3

18/06/25

Merak Vol = 5 m3

19/06/25

Merak Vol = 4,5 m3

19/06/25

Merak Vol = 5 m3

06/07/25

Merak Vol = 6,5 m3

07/07/25

Merak Vol = 5 m3

40 of 110

LS 1

LS 2

LS 3

LANTAI 1

SEPARATOR BEAM

29/07/25

Merak

2 m3

SEPARATOR BEAM

BAJA OPENINGAN

DINDING LIFT

41 of 110

DINDING PARAPET LT. MEZZANINE

05/07/25

Merak Vol = m3

12/07/25

Merak Vol = 5 m3

14/07/25

Merak Vol = 11,5 m3

42 of 110

LS 1

LS 2

LS 3

LANTAI MEZANINE

SEPARATOR BEAM

16/08/25

Merak

3 m3

SEPARATOR BEAM

BAJA OPENINGAN

DINDING LIFT

43 of 110

LANTAI 2

4/10/24

ADHIMIX 39 m3

7/10/24

ADHIMIX 171 m3

11/10/24

MERAK 149 m3

17/10/24

ADHIMIX

140 m3

22/10/24

ADHIMIX

9/10/24

MERAK

19/11/24

ADHIMIX

Vol = 56 m3

17/12/24

PBI

73m3

13/3/25

MERAK

52m3

25/1/25

ADHIMIX

91M3

2/2/25

ADHIMIX

85M3

6/2/25

ADHIMIX

82 M3

16/2/2025

Adhimix

7m3

14/3/2025

Merak

90m3

15/4/25

MERAK

4 m3

19/05/25

Merak

5 m3

26/06/25

Merak

8m3

44 of 110

LANTAI 2

8/10/24

ADHIMIX 31 m3

7/10/24

ADHIMIX 14 m3

9/10/24

11/10/24

ADHIMIX 35 m3

12/10/24

ADHIMIX 24 m3 (

13/10/24

MERAK 26 m3

17/10/24

ADHIMIX

49 m3

18/10/24

20/10/24

ADHIMIX

23/10/24

ADHIMIX

35 m3 (+kolom lt. 3)

25/10/24

ADHIMIX 15 m3

30/10/24

21/11/2024

Adhimix

40 m3

7/11/2024

Merak

19,5 m3

19/12/2024

30/01/2025

9m3

14/3/25

MERAK 5,5 m3

45 of 110

DINDING PARAPET LANTAI 2

10/07/25

Merak Vol = 5 m3

11/07/25

Merak Vol = 5 m3

24/07/25

Merak Vol = 2 m3

22/07/25

Merak Vol = 6 m3

46 of 110

LS 1

LS 2

LS 3

LANTAI 2

SEPARATOR BEAM

23/05/25

Merak

2 m3

47 of 110

LANTAI 3

19/10/24

MERAK

84,5 m3

16/10/24

ADHIMIX 119 m3

20/10/24

ADHIMIX 224 m3

25/10/24

ADHIMIX 112 m3

4/11/24

ADHIMIX 189 m3

17/11/2024

19,5 m3

7/12/24

Adhimix

42m3

05/02/25

Adhimix

70 m3

13/02/25

Adhimix

84 m3

6/2/25

82m3

27/1/25

MERAK

13M3

21/2/25

Adhimix

115m3

26/2/25

Merak

6,5 m3

25/04/25

MERAK

110 m3

04/05/25

Adhimix

7 m3

23/05/25

Merak

8 m3

10/07/25

MERAK

4 m3

48 of 110

LANTAI 3

17/10/24

ADHIMIX 49 m3

19/10/24

22/10/24

42 m3

23/10/24

ADHIMIX 35 m3

24/10/24

ADHIMIX 7 m3 (

25/10/24

ADHIMIX

4 m3

27/10/24

ADHIMIX

19 m3

28/10/24

6/11/24

ADHIMIX

5/11/24

23/10/24

09/11/24

MERAK 19 m3

07/11/24

MERAK 13 m3

10/11/24

MERAK 9 m3

21/11/24

Adhimix 3 m3

10/12/24

Merak 19,5 m3

27/01/25

Merak 16,5 m3

7/2/25

Adhimix 3,5 m3

22/2/25

Merak 12 m3

14/4/25

Merak 2 m3

18/4/25

Merak 2 m3

18/05/25

Merak 3,5 m3

19/05/25

Merak 3,5 m3

49 of 110

DINDING PARAPET LANTAI 3

11/07/25

Merak Vol = 5 m3

12/07/25

Merak Vol = 5 m3

29/07/25

Merak Vol = 6 m3

50 of 110

19/05/25

Merak

7 m3

LANTAI 3

SEPARATOR BEAM

LS 1

LS 2

LS 3

51 of 110

LANTAI 4

29/10/24

MERAK 117 m3

1/10/24

MERAK

2/11/24

ADHIMIX 94 m3

6/11/24

ADHIMIX

112 m3

16/11/24

ADHIMIX

Vol : 140 m3

12/12/24

MERAK

32,5 m3

23/01/25

ADHIMIX 49 m3

16/2/25

Adhimix

60m3

1/3/25

Merak 85 m3

3/3/25

Merak 135 m3

17/3/25

Merak 85 m3

10/3/2025

26/04/25

ADHIMIX 45 m3

27/10/24

MERAK 78 m3

4/3/25

MERAK 26 m3

08/05/25

MERAK 10 m3

10/05/25

Adhimix

7,2 m³

31/05/25

MERAK

5 m3

27/06/25

Merak

2 m3

14/08/25

Merak

7m3

52 of 110

LANTAI 4

28/10/24

30/10/24

1/11/24

ADHIMIX 21 m3

3/11/24

ADHIMIX

2/11/24

ADHIMIX

5/11/24

ADHIMIX

4/11/24

ADHIMIX

6/11/24

ADHIMIX 21 m3

7/11/24

18/11/24

Merak Vol : 25.5 m3

19/11/24

Adhimix Vol : 21 m3

21/11/24

Adhimix Vol : 40 m3

18/2/25

Adhimix Vol : 12 m3

5/3/25

Merak Vol : 7 m3

7/3/25

Merak Vol : 3 m3

26/4/25

Merak Vol : 12 m3

3/4/25

Merak Vol : m3

53 of 110

DINDING PARAPET LANTAI 4

14/07/25

Merak Vol = 6,5 m3

08/08/25

Merak Vol = m3

54 of 110

LANTAI 4

SEPARATOR BEAM

LS 1

LS 2

LS 3

24/05/25

Merak

4 m3

55 of 110

LANTAI 5

7/11/24

ADHIMIX 94 m3

10/11/2024

Volume : 96 m3

(Merak)

SLAB LANTAI 5

13/11/2024

Volume : 180 m3

(Merak)

22/11/2024

Volume : 170 m3

(Adhimix)

25/11/24

225m3

24/2/25

51,5

Merak

29/1/25

Volume : 21 m3

(Adhimix)

26/2/25

60 m3

(Merak)

12/3/25

Volume : 78 m3

Merak

23/2/25

119 m3

(Adhimix)

14/3/25

52 m3

Merak

19/3/2025

15/3/25

80 m3

(Merak)

04/05/25

90 m3

(Merak)

10/4/25

20 m3

(Merak)

11/05/25

4 m3

(Merak)

Chiller

Chiller

16/05/25

7,2 m3

(Adhimix)

23/05/25

16 m3

(Merak)

11/06/25

4 m3

(Merak)

56 of 110

LANTAI 5

DINDING PARAPET LANTAI 5

22/11/2024

Volume : 170 m3

(Adhimix)

13/4/25

Merak Vol = 3 m3

12/4/25

Merak Vol = 7 m3

DINDING PARAPET LANTAI 5

25/4/25

Adhimix Vol = 6 m3

25/4/25

Adhimix Vol = 7 m3

24/5/25

Merak Vol = 5 m3

25/5/25

Merak Vol = 5 m3

27/5/25

Merak Vol = 5 m3

28/5/25

Merak Vol = 3 m3

30/5/25

Merak Vol = 3 m3

31/5/25

Merak Vol = 3 m3

26/06/25

Merak Vol = 2 m3

01/07/25

Merak Vol = 2 m3

04/07/25

Merak Vol = 4 m3

09/07/25

Merak Vol = 2 m3

24/07/25

Merak Vol = m3

01/08/25

Merak Vol = 3 m3

08/08/25

Merak Vol = 6 m3

57 of 110

KOLOM LANTAI 5

9/11/24

Merak Vol = 20 m3

10/11/24

Merak Vol = 7.5 m3

11/11/24

Merak Vol = 24 m3

12/11/24

Merak Vol = 4 m3

15/11/24

Adhimix Vol = 28 m3

16/11/24

Adhimix Vol = 49 m3

17/11/24

Merak Vol = 49 m3

21/11/24

Adhimix Vol = 35 m3

30/11/24

Adhimix Vol = 26 m3

1/12/24

Merak Vol = 19 m3

2/12/24

Merak Vol = 13 m3

23/11/24

Merak Vol = 18 m3

2/12/24

Merak Vol = 13 m3

25/2/25

Merak Vol = 11 m3

27/2/25

Merak Vol = 9 m3

9/4/25

Merak Vol = 17,5 m3

11/4/25

Merak Vol = 4 m3

18/4/25

Merak Vol = 11 m3

20/4/25

Merak Vol = 12 m3

06/04/25

Adhimix Vol = 3 m3

58 of 110

LS 1

LS 2

LS 3

LANTAI 5

SEPARATOR BEAM

24/05/25

Merak

1 m3

27/07/25

Merak

1 m3

59 of 110

SLAB LANTAI 6

25/11/24

Merak

160m3

30/11/24

Merak

149,5 m3

3/12/24

Merak

21,4m3

4/12/24

Adhimix

147

4/12/24

Adhimix

147m3

6/12/24

160m3

26/2/25

20 m3

(Merak)

5/3/25

78 m3

(Merak)

12/3/25

49 m3

(Merak)

9/4/25

35 m3

(Merak)

19/3/25

78 m3

(Merak)

23/4/25

80 m3

(Merak)

16/4/25

117 m3

(Adhimix)

10/05/25

45 m3

(Adhimix)

31/05/25

9 m3

(Merak)

11/06/25

5,5 m3

(Merak)

21/06/25

1,5 m3

(Merak)

60 of 110

12/4/25

Merak Vol = 7 m3

DINDING PARAPET LANTAI 6

15/4/25

Merak Vol = 3 m3

15/4/25

Merak Vol = 6,5 m3

07/05/25

Merak Vol = 4 m3

17/05/25

Merak Vol = 8 m3

04/06/25

Merak Vol = 3 m3

13/06/25

Merak Vol = 3 m3

19/06/25

Merak Vol = 4,5 m3

22/06/25

Merak Vol = 2,5 m3

26/06/25

Merak Vol = 2 m3

27/06/25

Merak Vol = m3

12/07/25

Merak Vol = 3 m3

21/07/25

Merak Vol = 3 m3

31/07/25

Merak Vol = 4 m3

11/08/25

Merak Vol = 6,5 m3

/08/25

Merak Vol = 6,5 m3

18/09/25

Merak Vol = 3 m3

61 of 110

30/11/24

Merak Vol = 6,5 m3

Kolom LANTAI 6

1/12/24

Merak Vol = 7 m3

2/12/24

Merak

8/12/24

Adhimix

28m3

7/12/24

Adhimix

18m3

9/12/24

Adhimix

28m3

10/12/24

Merak

6,5

27/2/25

Merak

3 m3

7/3/25

Merak

m3

14/3/25

Merak

7 m3

10/4/25

Merak

3,5 m3

24/4/25

Merak

11 m3

04/05/25

Merak

17,5 m3

08/05/25

Merak

11 m3

10/05/25

Adhimix

17 m3

12/05/25

Adhimix

5 m3

17/05/25

Merak

3 m3

62 of 110

17/05/25

Merak

3 m3

LANTAI 6

SEPARATOR BEAM

LS 1

LS 2

LS 3

24/05/25

Merak

1,5 m3

27/07/25

Merak

1 m3

63 of 110

10/12/24

Merak

110m3

16/12/24

PBI

189m3

18/12/24

Merak

110,5m3

19/12/24

Adhimix

200m3

SLAB LANTAI 7

10/3/25

PBI/MERAK 21 m3

19/04/25

Merak

119 m3

26/04/25

Merak &

Adhimix

40 m3

16/05/25

Adhimix

90 m3

18/05/25

Merak

50 m3

21/05/25

Adhimix

95 m3

21/06/25

8 m3

(Merak)

22/06/25

8 m3

(Merak)

64 of 110

26/04/25

Merak Vol = 11 m3

DINDING PARAPET LANTAI 7

12/05/25

Adhimix Vol = 15 m3

15/05/25

Merak Vol = 15 m3

17/05/25

Merak Vol = 10 m3

21/05/25

Merak Vol = 4,5 m3

03/06/25

Merak Vol = 3 m3

31/05/25

Merak Vol = 2,5 m3

15/06/25

Merak Vol = 3 m3

04/07/25

Merak Vol = 4 m3

16/07/25

Merak Vol = 5 m3

27/07/25

Merak Vol = 3 m3

29/07/25

Merak Vol = 3 m3

07/08/25

Merak Vol = 4 m3

11/08/25

Merak Vol = 3 m3

19/08/25

Merak Vol = 3 m3

/08/25

Merak Vol = m3

22/08/25

Merak Vol = 3m3

65 of 110

11/12/24

Merak

18,5m3

12/12/24

Merak

13m3

18/12/24

Merak

26m3

KOLOM LANTAI 7

19/12/24

Adhimix

26m3

22/12/24

Adhimix

28m3

23/12/24

Adhimix

28m3

24/12/24

Adhimix

9m3

15/3/25

MERAK

11m3

20/4/25

MERAK

11m3

23/4/25

MERAK

9 m3

28/4/25

MERAK & Adhimix

9 m3

12/05/25

Adhimix

10,5 m3

18/05/25

Merak

10,5 m3

19/05/25

Merak

14 m3

20/05/25

Merak

6 m3

24/05/25

Merak

11 m3

66 of 110

LS 1

LS 2

LS 3

LANTAI 7

SEPARATOR BEAM

26/05/25

Merak

3 m3

27/07/25

Merak

1 m3

67 of 110

SLAB LANTAI 8

3/1/25

Adhimix

178m3

5/1/25

Adhimix

210 m3

30/12/24

Merak

273m3

02/05/25

145 m3

Adhimix

05/05/25

Merak

45 m3

21/05/25

Merak

10 m3

31/05/25

Merak

50 m3

21/06/25

Merak

95 m3

02/07/25

Merak

130 m3

09/07/25

Merak

2 m3

68 of 110

24/05/25

Merak Vol = 8 m3

DINDING PARAPET LANTAI 8

13/06/25

Merak Vol = 5 m3

15/06/25

Merak Vol = 5 m3

18/06/25

Merak Vol = 4 m3

19/06/25

Merak Vol = 4 m3

27/06/25

Merak Vol = m3

27/07/25

Merak Vol = 3,5 m3

29/07/25

Merak Vol = 4 m3

31/07/25

Merak Vol = 6 m3

06/08/25

Merak Vol = 5 m3

11/08/25

Merak Vol = 6 m3

08/25

Merak Vol = 6 m3

08/25

Merak Vol = 6 m3

23/08/25

Merak Vol = 3 m3

69 of 110

KOLOM LANTAI 8

31/12/24

Adhimix

28m3

3/1/25

Adhimix

32m3

4/1/25

Adhimix

28m3

6/1/25

Adhimix

17 m3

7/1/25

Adhimix

23 m3

9/4/25

MERAK

9 m3

1/5/25

MERAK

7,5 m3

04/05/25

MERAK

6 m3

06/05/25

Adhimix

9 m3

08/05/25

Merak

6 m3

26/05/25

Merak

11 m3

02/06/25

Merak

7 m3

26/06/25

Merak

4 m3

70 of 110

LS 1

LS 2

LS 3

LANTAI 8

SEPARATOR BEAM

27/05/25

Merak

1,8 m3

14/06/25

Merak

1 m3

71 of 110

SLAB LANTAI 9

20/1/25

PBI�251m3

23/01/25�ADHIMIX�168m3

29/1/25

MERAK

224 m3

21-04-25

MERAK

52 m3

13-05-25

ADHIMIX

140 m3

15-05-25

MERAK

45 m3

31/05/25

10 m3

(Merak)

20-06-25

MERAK

55,5 m3

15/09/2025

Merak

35 m3

72 of 110

15/08/25

Merak Vol = 4 m3

DINDING PARAPET LANTAI 9

19/08/25

Merak Vol = 10 m3

20/08/25

Merak Vol = m3

21/08/25

Merak Vol = m3

73 of 110

20/01/25

PBI

14m3

22/01/25

PBI

35m3

23/01/25

MERAK

32,5m3

24/01/25

ADHIMIX

12m3

23/01/25

ADHIMIX

18m3

30/01/25

MERAK

25m3

23/04/25

MERAK

8m3

KOLOM LANTAI 9

15/05/25

MERAK

7,5 m3

16/05/25

Adhimix

14 m3

18/05/25

Merak

12 m3

22/06/25

Merak

6 m3

74 of 110

LS 1

LS 2

LS 3

LANTAI 9

SEPARATOR BEAM

04/06/25

Merak

3 m3

14/06/25

Merak

1 m3

03/08/25

Merak

1 m3

75 of 110

4/2/25

MERAK

220 M3

SLAB LANTAI 10

8/2/25

ADHIMIX

182m3

14/2/25

Adhimix

95m3

03/05/25

ADHIMIX 56 m3

28/05/25

MERAK 53 m3

20/06/25

MERAK

140 m3

11/2/25

ADHIMIX

135m3

22/06/25

8 m3

(Merak)

06/07/25

MERAK 55 m3

15/07/25

13 m3

(Merak)

76 of 110

7/2/25

17m3

Adhimix

8/2/25

17m3

Adhimix

10/2/25

23m3

Adhimix

9/2/25

17m3

Adhimix

11/2/25

8m3

Adhimix

12/2/25

15m3

Adhimix

15/2/25

16m3

Adhimix

16/2/25

23,5m3

Adhimix

18/2/25

15m3

Adhimix

KOLOM LANTAI 10

04/05/25

12 m3

Adhimix

29/05/25

10,5 m3

Merak

22/06/25

12 m3

Merak

24/06/25

6,5 m3

Merak

11/07/25

6 m3

Merak

77 of 110

LS 1

LS 2

LS 3

LANTAI 10

SEPARATOR BEAM

14/06/25

Merak

1 m3

11/07/25

Merak

4 m3

07/08/25

Merak

3,5 m3

03/08/25

Merak

1 m3

78 of 110

18/2/25

Adhimix

168m3

19/2/25

Adhimix

135m3

22/2/25

Merak

110

SLAB LANTAI 11

25/2/25

Merak

130m3

27/2/25

Merak

85 m3

12/05/25

Adhimix

50m3

17/06/25

Merak

52m3

27/06/25

3 m3

(Merak)

05/07/25

Merak

130m3

15/07/25

Merak

52m3

23/07/25

13 m3

(Merak)

79 of 110

19/2/25

14m3

Adhimix

21/2/25

16,5m3

Adhimix

23/2/25

26 m3

Merak

24/2/25

3,5 m3

Merak

KOLOM LANTAI 11

1/3/25

13 m3

Merak

3/3/25

21 m3

Merak

4/3/25

30 m3

Merak

11/3/25

3 m3

PBI / MERAK

14/05/25

10,5 m3

MERAK

19/06/25

11 m3

MERAK

11/07/25

10,5 m3

MERAK

13/07/25

16 m3

MERAK

16/07/25

6,5 m3

MERAK

80 of 110

LS 1

LS 2

LS 3

LANTAI 11

SEPARATOR BEAM

81 of 110

10/3/25

PBI

175 m3

16/3/25

Merak

188,5 m3

18/3/25

Merak

m3

22/3/25

Merak

m3

SLAB LANTAI 12

23/3/25

ADHIMIX

26 m3

27/05/25

Merak

50m3

04/07/25

3 m3

(Merak)

06/07/25

Merak

65m3

23/07/25

Merak

125 m3

27/07/25

32 m3

(Merak)

31/07/25

Merak

65m3

82 of 110

12/3/25

21m3

Merak

13/3/25

m3

Merak

14/3/25

3 m3

Merak

18/3/25

m3

Merak

20/3/25

13 m3

Merak

23/3/25

14 m3

Adhimix

24/3/25

24 m3

Adhimix

9/4/25

16 m3

MERAK

SLAB LANTAI 12

28/5/25

11 m3

MERAK

27/07/25

11 m3

MERAK

83 of 110

LS 1

LS 2

LANTAI 12

SEPARATOR BEAM

84 of 110

24/3/25

Adhimix

115 m3

13/4/25

Merak

120 m3

17/4/25

Merak

90 m3

18/4/25

Merak

90 m3

DENAH SLAB LANTAI 13

12/7/25

Merak

55 m3

06/08/25

Merak

98 m3

08/08/25

Merak

9 m3

85 of 110

11/4/25

9m3

Merak

12/4/25

14 m3

Merak

13/4/25

6.5 m3

Merak

14/4/25

6 m3

Merak

15/4/25

12 m3

Merak

18/4/25

4 m3

Merak

20/4/25

23 m3

Merak

20/4/25

16 m3

Merak

20/4/25

1 m3

Merak

21/4/25

32,8 m3

Merak

DENAH KOLOM DAN SW LANTAI 13

14/7/25

6,5 m3

Merak

08/08/25

8 m3

Merak

86 of 110

LS 1

LS 2

LANTAI 13

SEPARATOR BEAM

14/08/25

Merak

3 m3

87 of 110

21/4/25

Merak

135 m3

DENAH SLAB LANTAI 14

24/4/25

Merak

130 m3

28/4/25

Merak & Adhimix

194,5 m3

24/07/25

Merak

52 m3

14/08/25

Merak

4 m3

16/08/25

Merak

98 m3

88 of 110

DENAH KOLOM LANTAI 14

21/4/25

16 m3

Merak

23/4/25

15,5 m3

Merak

24/4/25

17 m3

Adhimix

25/4/25

14 m3

Adhimix

co

29/4/25

15 m3

Adhimix

01/05/25

31 m3

Adhimix

03/05/25

17 m3

Adhimix

co

25/07/25

7,5 m3

Adhimix

19/08/25

10 m3

Merak

89 of 110

LS 1

LS 2

LANTAI 14

SEPARATOR BEAM

15/08/25

Merak

6 m3

22/08/25

Merak

2 m3

90 of 110

02/5/25

Adhimix

120 m3

DENAH SLAB LANTAI 15

4/5/25

Adhimix

140 m3

07/05/25

Merak

165 m3

08/08/25

Merak

52 m3

22/08/25

Merak

9 m3

22/08/25

Merak

98 m3

91 of 110

DENAH KOLOM LANTAI 15

02/05/25

12 m3

Adhimix

03/05/25

20,5 m3

Merak

04/05/25

12,5 m3

Adhimix

06/05/25

16 m3

Adhimix

08/05/25

17 m3 Merak

11/05/25

38,5 m3 Merak

12/05/25

8 m3 Adhimix

/25

8 m3 Adhimix

92 of 110

LS 1

LS 2

LANTAI 15

SEPARATOR BEAM

19/08/25

Merak

3 m3

93 of 110

12/05/25

Merak & Adhimix

150 & 15 m3

DENAH SLAB LANTAI 16

17/05/25

Merak

135 m3

20/05/25

Merak

190 m3

23/08/25

Merak

52 m3

24/08/25

Merak

6 m3

28/08/25

Merak

98 m3

94 of 110

DENAH KOLOM LANTAI 16

13/05/25

16 m3

Adhimix

14/05/25

26,5 m3

Merak

15/05/25

6 m3

Merak

18/05/25

16 m3

Merak

21/05/25

26,5 m3

Merak

23/05/25

20,5 m3

Merak

25/05/25

17 m3

Merak

24/08/25

7 m3

Merak

/25

8 m3 Adhimix

95 of 110

LS 1

LANTAI 16

SEPARATOR BEAM

19/08/25

Merak

3 m3

22/08/25

Merak

2 m3

96 of 110

23/05/25

Merak

160 m3

DENAH SLAB LANTAI 17

26/05/25

Merak

143 m3

29/05/25

Merak

163 m3

30/08/25

Merak

52 m3

2/09/25

Merak

98 m3

97 of 110

DENAH KOLOM LANTAI 17

25/05/25

16 m3

Merak

26/05/25

16 m3

Merak

27/05/25

8,5 m3

Merak

28/05/25

18 m3

Merak

29/05/25

16,5 m3

Merak

30/05/25

31 m3

Merak

31/05/25

5 m3

Merak

01/06/25

10 m3

Merak

3/09/25

8 m3 Adhimix

98 of 110

LS 1

LS 2

LANTAI 17

SEPARATOR BEAM

20/08/25

Merak

3 m3

99 of 110

02/06/25

Merak

143 m3

DENAH SLAB LANTAI 18

13/06/25

Merak

147 m3

16/06/25

Merak

149,5 m3

11/09/25

Merak

143 m3

6/09/25

Merak

60 m3

100 of 110

DENAH KOLOM LANTAI 18

03/06/25

26 m3

Merak

13/06/25

15 m3

Merak

15/06/25

16 m3

Merak

17/06/25

25 m3

Merak

18/06/25

9 m3

Merak

19/06/25

20 m3

Merak

20/06/25

9 m3

Merak

12/09/25

8 m3 Adhimix

101 of 110

LS 1

LS 2

LANTAI 18

SEPARATOR BEAM

102 of 110

18/06/25

Merak

146,5 m3

DENAH SLAB LANTAI 19

23/06/25

Merak

118,5 m3

28/06/25

Merak

135 m3

13/09/25

Merak

56 m3

18/09/25

Merak

104 m3

103 of 110

DENAH KOLOM LANTAI 19

20/06/25

25 m3

Merak

22/06/25

15 m3

Merak

24/06/25

13 m3

Merak

29/06/25

15 m3

Merak

01/07/25

24,5 m3

Merak

02/07/25

15 m3

Merak

04/07/25

4,5 m3

Merak

15/09/25

7 m3

Merak

18/09/25

8 m3 Merak

104 of 110

LS 1

LS 2

LANTAI 19

SEPARATOR BEAM

105 of 110

04/07/25

Merak

148 m3

DENAH SLAB LANTAI 20

09/07/25

Merak

130 m3

11/07/25

Merak

160 m3

20/09/25

Merak

60 m3

23/09/25

Merak

100 m3

106 of 110

DENAH KOLOM LANTAI 20

09/07/25

34,5 m3

Merak

09/07/25

9 m3

Merak

11/07/25

24 m3

Merak

12/07/25

24 m3

Merak

13/07/25

25 m3

Merak

14/07/25

33,5 m3

Merak

15/07/25

8 m3

Merak

22/09/25

10 m3

Merak

23/09/25

8 m3 Merak

107 of 110

LS 1

LS 2

LANTAI 20

SEPARATOR BEAM

108 of 110

19/07/25

Merak

180 m3

DENAH SLAB LANTAI ATAP

27/07/25

Merak

220 m3

03/08/25

Merak

210 m3

4/10/25

Merak

120 m3

4/10/25

Merak

60 m3

Total 790 m3

109 of 110

DENAH KOLOM LANTAI ATAP

2 m3

Merak

19/08/25

2 m3

Merak

110 of 110

DENAH DINDING PARAPET LANTAI ATAP

06/08/25

6 m3

Merak

08/08/25

6 m3

Merak

14/08/25

2 m3

Merak

Merak