Collaborative Governance for Climate Resilience
1
South San Francisco Bay Shoreline
LTG(Ret) Thomas P Bostick
December 11, 2018
Managing a Crisis: Responding to Hurricane Sandy in the New York Metropolitan Area
ALVISO
WASTEWATER�FACILITY
ALVISO SLOUGH
LEVEE
ARTESIAN SLOUGH
Ecotone (transitional habitat)
Levee
Tidal Marsh Restoration
Union Pacific Railroad Flood Gate �& Pedestrian Bridge
1
2
Artesian Slough Tide Gate�& Pedestrian Bridge
GUADALUPE RIVER
N
COYOTE CREEK
TIE INTO �ACCREDITED LEVEE
TIE INTO �ACCREDITED LEVEE
WATER PURIFICATION CENTER
1
2
A18
A12
A13
A15
A14
A11
A9
A10
ECOTONE AND LEVEE CROSS SECTION
Deep to �Shallow�Sub-tidal
Middle�Marsh
High�Marsh�
Wetland/�Upland�Transitional �Zone
Low�Marsh
Upland�Grassland
(Levee)
Inter-�tidal�Mudflat
MLLW
MTL
MHW
MHHW
Cordgrass
Pickleweed
Pickleweed, �Marsh Gumplant,
Alkali Heath, Spearscale
NOT TO SCALE
2015 Chief’s Report: South San Francisco Bay Shoreline
2
NORFOLK FLOOD RISK MANAGEMENT STUDY
LTG(Ret) Thomas P Bostick
November 7, 2018
Chief of Engineers of the
United States Army and
Commanding General of the
U.S. Army Corps of Engineers
better DNA
A community of scientists and creative innovators working to build a safer, healthier planet, and a more promising future through better DNA.
USACE
© 2017 Intrexon Corp. All rights reserved.
3
4
(Linkov et. Al. (2014)
Engineers have long tried to design infrastructure to withstand extreme forces, but recently they have begun to address the need for urban infrastructure systems that are resilient to disasters (NIST, 2008)
Risk and Resilience
5
Background
Engaging Stakeholders in Resilience Assessment and Management for Coastal Communities�Thomas P. Bostick
6
USACE. (2015). North Atlantic Coast Comprehensive Study. (NACCS).
Risk Models focus on Infrastructure risk management and known threats.
What is missing:
Stakeholder-involved system resilience management and unknown threats.
Systems Approach to Resilience
7
BUILDING STRONG®
POTUS: 22 May 2012: Hurricane Crisis Planning Guidance: Prepare for a hurricane that might take out our electricity, shut down our banking systems, and flood the northeast coast
8
22 Oct 2012: Super Storm Sandy
9
Impacts:
Response Missions:
Recovery Missions:
Brooklyn Battery Tunnel: 85 million gallons of water removed…enough water to fill the Rose Bowl!
Engaging Stakeholders in Resilience Assessment and Management for Coastal Communities�Thomas P. Bostick
10
Coastal risk assessments are not focused on stakeholder-involved systems-based resilience before disasters, thereby leading to very frustrated stakeholders after disasters occur.
http://i.ytimg.com/vi/I-bGavCe4Sg/0.jpg
http://2.bp.blogspot.com/-3anRzyxKuhM/UzcZM3maJ6I/AAAAAAACMLc/RTPxlfq8mF0/s1600/8712785860_ceca1272f9.jpg
Part of the challenge: Local Priorities - Stakeholder Engagement
Super Storm Sandy�Priorities: First Meeting with Mayor Bloomberg
11
Super Storm Sandy�Elected Officials (Governors/Mayors) are in charge and accountable
12
“The John Wayne dude who's kicking butts and getting things done.”
https://www.google.com/search?q=honore+in+charge+on+a+horse+during+katrina&rlz=1C1CHBF_enUS748US748&tbm=isch&tbo=u&source=univ&sa=X&ved=2ahUKEwii87KSrJPfAhXG24MKHUf1BFcQsAR6BAgEEAE&biw=1172&bih=446#imgrc=d6LdtznCQdjTDM:
Priorities: NJ Coastline During Sandy
13
With Project
30 miles apart
Without Project
Stakeholders: Rebuild or Retreat: Mantoloking, NJ
14
Pre-Sandy
30 Oct 2012
5 Dec 2012
6 Nov 2012
BUILDING STRONG®
1927 Flood: Priority - Mississippi River and Tributaries System
15
BUILDING STRONG®
Flooded Areas�1927 Flood vs 2011 Flood
17
Stakeholder Input
Supplemental Funding Announcement
18
Senator Feinstein, LTC Travis Rayfield and Sam Schuchat
Action: Federal, State, Local �Organization, Teamwork, Decision-Making
19