1 of 103

PRESENTED AT THE ONE (1) DAY

STAKEHOLDERS FORUM ON

MONDAY, 19TH MARCH, 2018

​

BY BABATUNDE RAJI FASHOLA, SAN

HONOURABLE MINISTER OF POWER, WORKS & HOUSING

​

​

​

​

FEDERAL MINISTRY OF POWER, WORKS & HOUSING (WORKS SECTOR)�

DEVELOPMENTS IN THE ROAD SECTOR HIGHLIGHTING:

PLANS, PROGRAMMES AND PROGRESS ON THE FEDERAL ROAD NETWORK

2 of 103

2

1

    • INTRODUCTION

2

    • MAJOR ROUTES ON THE FEDERAL HIGHWAY NETWORK AND CORRIDORS CONNECTING OTHER COUNTRIES

3

    • MANAGEMENT OF THE ROAD ASSET

4

    • FUNDING OF ROAD DEVELOPMENT FROM 2013 TO 2017

5

    • PRIORITIZATION OF ROAD DEVELOPMENT AND ACHIEVEMENTS

6

    • ABUSE OF ROAD INFRASTRUCTURE

7

    • CONTROL OF AXLE LOAD ON THE FEDERAL ROAD NETWORK

8

    • RE-INTRODUCTION OF TOLL PLAZA’S

9

    • ROAD FURNITURE ON FEDERAL ROADS

10

    • WAY FORWARD/ CONCLUSION

PRESENTATION OUTLINE

3 of 103

�

​

​

​

​

​

​

​

3

INTRODUCTION

4 of 103

��� INTRODUCTION���

​

​

​

​

4

The Road transport accounts for over 90% of freight and passenger services for inland transportation and therefore the importance of the national road network as a major contributor to the socio-economic development of the country can therefore, not be over-emphasized

Efforts are being made to keep the Federal road network in serviceable condition, given its socio-economic importance

5 of 103

MAP OF FEDERAL ROAD NETWORK

​

​

​

5

6 of 103

�

​

​

​

​

​

​

​

6

MAJOR ROUTES ON THE FEDERAL HIGHWAY NETWORK AND CORRIDORS CONNECTING OTHER COUNTRIES

​

  • MAJOR NORTH-SOUTH ROUTES ON THE FEDERAL ROAD NETWORK ROUTE A1 TO A9
  • MAJOR ROAD CORRIDORS IN NIGERIA LINKING OTHER COUNTRIES

​

7 of 103

��MAJOR NORTH-SOUTH ROUTES ON THE �FEDERAL ROAD NETWORK�ROUTE A1 TO A9��

​

​

​

​

7

The Major North-South routes carry the heaviest traffic in the country including imports from the ports to the hinterland and produce to the ports for export.

These major roads are classified as Route A1 to A9 and require adequate attention to be in serviceable condition for traffic at all times in order to ensure that economic operations are efficient and optimized.

8 of 103

FEDERAL HIGHWAY ROUTE A1�The road starting at the main entrance gate to Apapa Wharf (Lagos)-Ikorodu-Shagamu-Ibadan-Oyo-Ilorin-Jebba- Kontagora-Yelwa-Koko-Jega-Tambawal-Sokoto-Illela-Niger Republic border. �

​

​

​

HIGHWAYS PLANNING AND DEVELOPMENT

8

9 of 103

FEDERAL HIGHWAY ROUTE A2�The road starting at Kongolam at the boundary with Niger Republic- Daura-Kano-Zaria-Kaduna-Abuja- Lokoja-Auchi-Benin- Warri.�

​

​

​

HIGHWAYS PLANNING AND DEVELOPMENT

9

10 of 103

FEDERAL HIGHWAY ROUTE A3�The road starting at the road over rail bridge at PortHarcourt-Aba-Umu Uyo-Owerrinta-Umuahia-UmuDuru-Okigwe-Awgu-Oji River-Otukpa-Oturkpo-Aliade-Makurdi-Lafia-Akwanga-Wamba-Jos-Bauchi-Kiri-Potiskum-Maiduguri- Gamboru.�

​

​

​

HIGHWAYS PLANNING AND DEVELOPMENT

10

11 of 103

FEDERAL HIGHWAY ROUTE A4�The road starting from Calabar-Ugep-Ikom - Ogoja-Katsina Ala-Jalingo-Yola Gombi-Bama-Maiduguri�

​

​

​

HIGHWAYS PLANNING AND DEVELOPMENT

11

Bama

12 of 103

FEDERAL HIGHWAY ROUTE A5�The road starting 62.7 metres from the south abutment of Carter Bridge on Lagos Island and continuing over Carter Bridge - Denton Street-Clifford Street-City Way- Yaba Roundabout-Agege -Sango Otta-Abeokuta-Ibadan.�

​

​

​

HIGHWAYS PLANNING AND DEVELOPMENT

12

Sango Otta

13 of 103

FEDERAL HIGHWAY ROUTE A6�The road starting from Onitsha-Nnewi-Ihiala-Owerri-to the Junction of Trunk Road A.3 at Umu Uyo.�

​

​

​

HIGHWAYS PLANNING AND DEVELOPMENT

13

14 of 103

FEDERAL HIGHWAY ROUTE A7�The road starting from Chikanda - Yeshikere-Kosubosu-Kaiama Kishi-Ilorin.�

​

​

​

HIGHWAYS PLANNING AND DEVELOPMENT

14

15 of 103

FEDERAL HIGHWAY ROUTE A8�The road starting from Mayo Belwa Junction-Ganye-Jamtari-Serti-Mayo Selbe-Gembu on the Mambilla Plateau.�

​

​

​

HIGHWAYS PLANNING AND DEVELOPMENT

15

16 of 103

FEDERAL HIGHWAY ROUTE A9�The road starting from Jibiya-Katsina-Kano.�

​

​

​

HIGHWAYS PLANNING AND DEVELOPMENT

16

17 of 103

​

  • THE 1028km ABIDJAN-LAGOS CORRIDOR

​

​

​

​

​

​

17

MAJOR ROAD CORRIDORS IN NIGERIA LINKING OTHER COUNTRIES

18 of 103

​

HIGHLIGHTS OF THE ABIDJAN-LAGOS CORRIDOR

  • The Abidjan-Lagos route connects some of the largest and economically most dynamic cities in Africa, such as Lagos, Cotonou, Lome, Accra and Abidjan. It is estimated that these countries account for 75% of economic activities in the West African sub-region.
  • It links very vibrant sea ports that serve all the landlocked countries in the region, such as Burkina Faso, Chad, Mali and Niger.
  • Five Heads of Government (Benin, Cote d’Ivoire, Ghana, Nigeria & Togo) approved the constitution of a Steering Committee responsible for the formulation of policies and a blueprint for realization of a 2x3 lane highway connecting the countries.
  • Funds have been provided by AfDB for project preparation studies including Engineering Design Studies for the project. ECOWAS Commission is the executing agency for the studies.

​

​

​

​

​

​

​

​

18

MAJOR ROAD CORRIDORS IN NIGERIA LINKING OTHER COUNTRIES – cont’d

19 of 103

​

  • TRANS-SAHARAN ROAD CORRIDOR

​

​

​

​

​

​

​

19

MAJOR ROAD CORRIDORS IN NIGERIA LINKING OTHER COUNTRIES – cont’d

COUNTRIES THAT ARE MEMBERS OF THE TRANS-SAHARAN ROAD LIAISON COMMITTEE

20 of 103

​

TRANS-SAHARAN ROADS CORRIDOR

​

  • The portion of the Trans - Saharan Road (TSR) within Nigeria is approximately 1,131 km in length
  • It starts in Lagos in the South Western part of Nigeria and terminates at Kongolam on the Nigeria/Niger border;
  • Major cities traversed by the alignment include:
    • Lagos –Shagamu- Ibadan dual carriageway (150km ) ;
    • Ibadan- Oyo-Ogbomosho - Ilorin dual carriageway (160km);
    • Ilorin-Jebba single carriageway (105km)
    • Jebba-Mokwa-Kotangora-Tegina-Kaduna single carriageway (353km);
    • Kaduna –Zaria - Kano dual carriageway(230km);
    • Kano-Kazaure single carriageway (66km); and
    • Kazaure-Kongolam single carriageway (66km).

​

​

​

​

​

20

MAJOR ROAD CORRIDORS IN NIGERIA LINKING OTHER COUNTRIES – cont’d

21 of 103

MAJOR ROAD CORRIDORS IN NIGERIA LINKING OTHER COUNTRIES – cont’d

  • ENUGU – ABAKALIKI – OGOJA – IKOM – MFUM – CAMEROON BORDER ROAD

​

21

NIGERIA

CAMEROON

22 of 103

MAJOR ROAD CORRIDORS IN NIGERIA LINKING OTHER COUNTRIES – cont’d

ENUGU – CAMEROON BORDER ROAD

  • The section of the road within Nigeria is 171km long traversing towns such as Enugu – Abakaliki – Ogoja Junction – Ikom – Mfum (Cameroon Border).
  • The road alignment is in good condition after being rehabilitated under The Nigerian Cameroon Highway Transport Facilitation Program (NCHTFP) supported by the AfDB and The World Bank.
  • The project is part of the confidence building measures between Nigeria & Cameroon consequent upon the decision of the International Court of Justice (ICJ) to cede the disputed area of Bakassi to Cameroun in 2002.

​

​

​

22

23 of 103

�

​

​

​

​

​

23

MANAGEMENT OF THE ROAD ASSET

24 of 103

ROAD ASSET MANAGEMENT SYSTEM (RAMS)

  • The Road Asset Management System Unit (RAMS) was set up to collect and manage data on the Federal Road network
  • The data is required to rationalise decision making in planning, programming, funding, procurement and allocation of resources in the road sector
  • By the end of 2017, about 13,200 kilometres of Federal roads across the country had been surveyed. The data collected is stored on a Server in the RAMS office at FMPW&H Headquarters, Mabushi, Abuja.

24

25 of 103

ROAD ASSET MANAGEMENT SYSTEM (RAMS)- Cont’d

25

CORING OF WEARING COURSE TO UNDERTAKE

DYNAMIC CONE PENETROMETER (DCP) TEST

FALLING WEIGHT DEFLECTOMETER (FWD) EQUIPMENT TESTING PAVEMENT STRENGTH

RAMS will improve the technical capacity, skills and management capability of the Ministry, thus improving efficiency and cost effectiveness in road improvement activities

26 of 103

26

2017 TRAFFIC CENSUS SURVEY

ROAD ASSET MANAGEMENT SYSTEM (RAMS)- Cont’d

27 of 103

27

2017 TRAFFIC CENSUS SURVEY

ROAD ASSET MANAGEMENT SYSTEM (RAMS)- Cont’d

28 of 103

ROAD ASSET MANAGEMENT SYSTEM (RAMS)- Cont’d

28

2017 TRAFFIC CENSUS SURVEY

29 of 103

�

​

​

​

​

​

​

​

29

  • FUNDING OF ROAD DEVELOPMENT BETWEEN 2013 - 2017

30 of 103

���FUNDING OF FEDERAL ROADS DEVELOPMENT���

30

  • The Federal Government’s commitment on Roads and Bridges presently is in the tune of over N3.4 trillion as at March, 2018.
  • Funding of these projects from the Federal Government Budget is difficult if not almost impracticable.
  • Consequently, the Federal Government is exploring alternative means of funding Highway Projects in the Country.

31 of 103

​

​

​

​

​

​

​

​

31

MINISTRY’S ANNUAL INVESTMENT BUDGET FOR ROAD PROJECTS

IN THE LAST FIVE (5) YEARS

32 of 103

���SOLVING THE FUNDING GAP���

32

  • The Federal Government is tending towards Bond financing for roads and Tax Credit Schemes for willing organizations.
  • The Sovereign SUKUK Bond of N100bn recently issued was used to fund sections of twenty five (25) Priority roads in the country. Each of the six (6) geo-political zones had an allocation of N16.67bn.
  • Organisations are being encouraged to fund highway Projects and obtain applicable concessions from the Federal Government under Public Private Partnership arrangement.
  • The Federal Executive Council recently approved the Road Trust Fund (RTF) that formalizes these funding arrangements.

33 of 103

HIGHWAYS PLANNING AND DEVELOPMENT

33

34 of 103

FUNDING OF SUKUK PROJECTS BY ZONE

34

35 of 103

�

​

​

​

​

​

​

​

35

PRIORITIZATION OF ROUTES DEVELOPMENT AND ACHIEVEMENTS (MAY, 2015 – FEBRUARY, 2018)

​

  • PRIORITIZATION OF PROJECTS
  • ACHIEVEMENTS

36 of 103

PRIORITIZATION OF PROJECTS�

The Works Sector (Highway) programme for restoration of our road network has been defined taking into account the main challenges facing the sector namely:

​

      • Inadequate funding for reconstruction/ rehabilitation and maintenance;
      • Misuse of the road network; and
      • The need to increase private sector participation in project delivery and finance within the sector.

​

As priority, the need is seen to put emphasis on the completion of ongoing projects on a prioritized basis.

​

36

37 of 103

Prioritized Projects for 2017-2019�

37

    • PRIORITY 1: MAJOR ARTERIALS ALONG THE CRITICAL ECONOMIC ROUTES OF THE FEDERAL ROAD NETWORK

​

    • PRIORITY 2: MAJOR BRANCH ROUTES FROM THE CRITICAL ECONOMIC ROUTES ON THE FEDERAL ROAD NETWORK.

​

    • PRIORITY 3:
    • ROADS TO REFINERIES, PORTS, NNPC DEPOTS, MINING AREAS

​

    • PRIORITY 4: ROADS THROUGH AGRICULTURAL AREAS

​

    • PRIORITY 5: ROADS FUNDED THROUGH MULTI-LATERAL LOANS

​

    • PRIORITY 6: OTHER ROADS ON-GOING PROJECTS ON THE NATIONAL ROAD NETWORK.

​

    • PRIORITY 7: INTERNAL ROADS TO FEDERAL TERTIARY INSTITUTIONS

38 of 103

���PRIORITIZATION OF PROJECTS���

SOME PRIORITIZED CRITICAL HIGHWAY ON-GOING PROJECTS ON THE MAJOR ARTERIAL ROUTES

​

​

​

​

​

​

38

Kano-Maiduguri;

Abuja-Abaji-Lokoja;

Lagos-Ibadan-Ilorin-Jebba

Benin-Shagamu

Onitsha-Enugu-Port Harcourt

Abuja-Kaduna-Zaria-Kano

Odukpani-Itu-Ikot Ekpene

39 of 103

���ACHIEVEMENTS IN THE ROAD SECTOR (3)���

  • The following are highway projects that are on-going on the major arterial routes in the country:
      • Abuja-Abaji-Lokoja;
      • Kano-Maiduguri;
      • Lagos-Ibadan-Ilorin-Jebba;
      • Benin-Shagamu
      • Onitsha-Enugu-Port Harcourt
      • 2nd Niger Bridge
      • Loko-Oweto Bridge

​

​

​

​

​

​

​

39

40 of 103

���PRIORITIZATION OF PROJECTS���

SOME PRIORITIZED MAJOR BRIDGE PROJECTS

​

​

​

​

​

​

40

2nd Niger Bridge

Loko- Oweto Bridge

41 of 103

��� ACHIEVEMENTS IN THE ROAD SECTOR � NATIONWIDE BRIDGE IMPROVEMENT PROGRAMME ���

  • The Bridge Department was commissioned to carry out Bridge inspections to determine the present condition of all bridges nationwide;
  • The inspection showed that Federal Bridges nationwide are in unsatisfactory condition;
  • The reason for this condition destruction by insurgents, willful damage by illegal under-bridge squatters, vandalization of bridge members and lack of routine and periodic maintenance, etc.

​

​

​

​

41

42 of 103

���PRIORITIZATION OF PROJECTS���

SOME PRIORITIZED HIGHWAY ON-GOING PROJECTS THROUGH AGRICULTURAL PRODUCING AREAS

​

​

​

​

​

​

42

Rehabilitation Sokoto-Tambuwal-Jega-Kontagora-Makera Road,

Rehabilitation of 9th Mile-Oturkpo-Makurdi Road (Otukpa-Oturkpo Section) in Benue State,

Gombe-Numan-Yola Road

43 of 103

�

​

​

​

PART THREE:

TWO YEARS ACHIEVEMENTS

29TH MAY 2015 – 29TH MAY, 2017

​

​

​

43

44 of 103

���PRIORITIZATION OF PROJECTS���

SOME PRIORITIZED HIGHWAY LEADING TO NNPC DEPOTS, PORTS, & MINERAL PRODUCING AREAS

​

44

Dualisation of Suleja-Minna Road in Niger State

Rehabilitation of Access Road to Apapa/Tin Can Island Port-NNPC Depot (Atlas Cove) in Lagos State

Construction Of Agaie-Katcha-Barro Road (Rigid Pavement) in Niger State

45 of 103

��� ACHIEVEMENTS IN THE ROAD SECTOR � NATIONWIDE BRIDGE IMPROVEMENT PROGRAMME ���

​

​

​

​

45

The Bridge Department was commissioned to carry out Bridge inspections to determine the present condition of all bridges nationwide resulting from destruction by insurgents, willful damage by illegal under-bridge squatters, vandalization of bridge members and lack of routine and periodic maintenance, etc.

The inspection showed that Federal Bridges nationwide are in unsatisfactory condition

46 of 103

HIGHWAYS PLANNING AND DEVELOPMENT

46

47 of 103

HIGHWAYS PLANNING AND DEVELOPMENT

47

48 of 103

�

​

​

​

​

​

48

ACHIEVEMENTS FROM

MAY, 2015 – JUNE, 2017

49 of 103

ACHIEVEMENTS�

Physical works completed on various projects location across the Federal Road network are as follows:

      • 715.16km of road has been constructed;
      • 600.56km of road has been rehabilitated; and
      • 6.28km of bridges constructed;
      • 4.71km of bridges maintained; and
      • 31,227 jobs were created.

​

​

49

50 of 103

�

​

​

​

​

​

​

50

SOME PICTURES OF ON-GOING PROJECTS

51 of 103

�����PROGRESS PHOTOGRAPHS�����

DUALISATION OF SULEJA-MINNA ROAD IN NIGER STATE

51

REHABILITATION OF ILORIN-JEBBA-MOKWA-BOKANI ROAD IN KWARA STATE, C/NO.6210

NORTH CENTRAL ZONE

52 of 103

�����PROGRESS PHOTOGRAPHS�����

CONSTRUCTION OF LOKO – OWETO BRIDGE ACROSS RIVER BENUE IN NASARAWA AND BENUE STATES, CONTRACT NO. 6108

52

DUALIZATION OF ABUJA-ABAJI-LOKOJA ROAD SECTION I, INTERNATIONAL AIRPORT LINK ROAD JUNCTION - SHEDA VILLAGE JUNCTION C/NO 5862;

NORTH CENTRAL ZONE

53 of 103

����PROGRESS PHOTOGRAPHS����

​

​

​

​

​

​

53

DUALIZATION OF KANO-MAIDUGURI ROAD (SECTION IV,POTISKUM-DAMATURU) IN YOBE STATE, C/NO.5881

NORTH EAST ZONE

COMPLETION OF GOMBE-NUMAN-YOLA ROAD PHASE II (GOMBE-KALTUNGO) IN GOMBE STATE, C/NO.6261

54 of 103

����PROGRESS PHOTOGRAPHS����

​

​

​

​

​

​

54

JALINGO -KONA-LAU-KARIM LAMIDO ROAD, PHASE L IN TARABA STATE

NORTH EAST ZONE

REHABILITATION OF YOLA – HONG – MUBI ROAD IN ADAMAWA STATE

55 of 103

����PROGRESS PHOTOGRAPHS����

55

DUALIZATION OF KANO-KATSINA ROAD, PHASE I IN KANO/KATSINA STATES

NORTH WEST ZONE

REHABILITATION OF SECTION IA OF SOKOTO-TAMBUWAL-JEGA-KONTAGORA-MAKERA ROAD, PHASE I IN SOKOTO/KEBBI STATES

56 of 103

����PROGRESS PHOTOGRAPHS����

56

NORTH WEST ZONE

REHABILITATION OF ZARIA-GUSAU-SOKOTO-BIRNIN KEBBI ROAD (FUNTUA-GUSAU SECTION) IN KATSINA STATE

57 of 103

�����PROGRESS PHOTOGRAPHS�����

​

​

​

​

​

​

57

REHABILITATION OF ENUGU-PORT HARCOURT DUAL CARRIAGEWAY SECTION I: LOKPANTA-UMUAHIA IN ABIA STATE C/NO.6208

REHABILITATION OF ENUGU-PORT HARCOURT DUAL CARRIAGEWAY SECTION III: ENUGU-LOKPANTA IN ENUGU STATE

SOUTH EAST ZONE

58 of 103

�����PROGRESS PHOTOGRAPHS�����

​

​

​

​

​

​

58

REHABILITATION OF ENUGU-ONITSHA DUAL CARRIAGEWAY

SOUTH EAST ZONE

59 of 103

�����PROGRESS PHOTOGRAPHS�����

​

​

​

​

​

​

59

DUALISATION OF OBAJANA JUNCTION TO BENIN PHASE 2: SECTION IV( EHOR-BENIN) IN EDO STATE, C/NO.6138

SOUTH SOUTH ZONE

CONSTRUCTION WORK ON BODO -BONNY ROAD WITH BRIDGES (SUBSOIL INVESTIGATION )

60 of 103

�����PROGRESS PHOTOGRAPHS�����

​

​

​

​

​

​

60

REHABILITATION OF ALESI – UGEP (IYAMOYUNG – UGEP) SECTION IN CROSS RIVER STATE

SOUTH SOUTH ZONE

DUALIZATION OF YENEGWE ROAD JUNCTION-KOLO-OTUEKE-BAYELSA PALM (20KM) IN BAYELSA STATE

61 of 103

�����PROGRESS PHOTOGRAPHS�����

​

​

​

​

​

​

61

REHABILITATION OF LAGOS-SHAGAMU-IBADAN DUAL CARRIAGEWAY SECTION I: LAGOS-SHAGAMU IN LAGOS/OGUN STATES

REHABILITATION/RECONSTRUCTION OF LAGOS-IBADAN DUAL CARRIAGEWAY SECTION II: SHAGAMU – IBADAN IN OGUN/OYO STATES

SOUTH WEST ZONE

62 of 103

�����PROGRESS PHOTOGRAPHS�����

​

​

​

​

​

​

62

RECONSTRUCTION OF APAPA-WHARP ROAD IN LAGOS STATE

DESIGN AND CONSTRUCTION OF TEWURE-AJINAPA ROAD IN OYO STATE

OVERLAY OF BENIN-OFOSU-AJEBANDELE- SHAGAMU DUAL CARRIAGEWAY,PHASE IV IN ONDO/OGUN STATES

SOUTH WEST ZONE

63 of 103

�

​

​

​

​

​

​

​

63

  • ABUSE OF ROAD INFRASTRUCTURE

64 of 103

ABUSE OF ROAD INFRASTRUCTURE

  • Abuse of the road & infrastructure;
  • Abuse of the Right of Way (RoW);
  • Over speeding;
  • Indiscriminate parking of HGVs on the shoulders;
  • Overloading;
  • Defacing of road signage;
  • Improperly secured containers and iron rods on flatbed trucks;
  • Substance abuse by drivers;
  • Discharging petroleum fuels on pavement surface after/ during repairs of broken down trucks.

​

64

65 of 103

ABUSE OF ROAD INFRASTRUCTURE Cont’d

HGV PLYING THE ROAD WITHOUT TYRE ON ONE AXLE WHICH CAUSES UNEVEN DISTRIBUTION OF VEHICLE LOAD

65

66 of 103

ABUSE OF ROAD INFRASTRUCTURE Cont’d

ILLEGAL MOTOR PARK AROUND AND UNDER ISAAC BORO PARK/ MILE 1 BRIDGE IN PORT HARCOURT

66

67 of 103

ABUSE OF ROAD INFRASTRUCTURE Cont’d

BURNT EKO BRIDGE IN LAGOS DUE TO ILLEGAL ACTIVITIES UNDER THE BRIDGE

67

68 of 103

Summary of Results of Independent Axle Load Survey carried out in 2008�

Source: Axle Load Survey, 2008

Heavy Vehicle Class

No.

counted

No. weighed

No. of Overloaded

vehicles

% vehicles Overloaded

No. of Overloaded axles

Average % Overloaded per axle

2 Axle

1479

316

97

30.7

114

36.1

3 Axle

656

162

100

61.7

192

57.4

4 Axle

1696

691

407

58.9

1112

51.1

5 Axle

648

166

89

53.6

287

46.8

6 & more Axle

111

15

7

46.7

29

35.4

Totals

4590

1350

700

51.9

1734

48.8

68

ABUSE OF ROAD INFRASTRUCTURE Cont’d

69 of 103

Comparison of 2008 Traffic Data and 2017

Source: Axle Load Study 2008 69

2008 Traffic Volume on Major Federal Roads

ABUSE OF ROAD INFRASTRUCTURE Cont’d

70 of 103

Heavy Goods Vehicle Flow

Source: Axle Load Study 2008 70

ABUSE OF ROAD INFRASTRUCTURE - Cont’d

71 of 103

�

​

​

​

​

​

71

CONTROL OF AXLE LOAD ON THE FEDERAL ROAD NETWORK

​

  • EFFECT OF EXCESSIVE AXLE LOAD
  • AXLE LOAD CONTROL
  • MANAGEMENT OF WEIGH BRIDGES
  • PENALTIES FOR AXLE LOAD VIOLATION

​

72 of 103

�

​

​

​

​

​

72

EFFECT OF EXCESSIVE AXLE LOAD

73 of 103

EFFECT OF EXCESSIVE AXLE LOAD

  • The road pavement is designed based on the cumulative axle load that the pavement is expected to carry during its design life.
  • This is because every axle load impact induces some permanent strain on the pavement which aggregate to cause failure.
  • Overloading exerts more load than the pavement is designed to carry which leads to rapid and premature failure of road pavement.
  • Axle load survey carried out in 2008 revealed over 48% of trucks are overloaded and exceed the legal maximum axle load of 11.5 tons

​

73

74 of 103

EFFECT OF EXCESSIVE AXLE LOAD – Cont’d

PAVEMENT DAMAGE ON ABUJA-LOKOJA EXPRESSWAY DUE TO OVER LOADING

75 of 103

�

75

TYPICAL OVERLOADED COMMERCIAL VEHICLE

IN NIGERIA

EFFECT OF EXCESSIVE AXLE LOAD –Cont’d

76 of 103

76

EFFECT OF EXCESSIVE AXLE LOAD –Cont’d

TYPICAL OVERLOADED COMMERCIAL VEHICLE

IN NIGERIA

77 of 103

AXLE LOAD CONTROL IN OTHER AFRICAN COUNTRIES

77

Ghana National Government enforced the axle load policy to control loading at the ports of entry effective June 1, 2009 in accordance with ECOWAS regulations.

Other African Countries such as Namibia, Uganda, South Africa etc. have made axle load control on highways a priority.

Ghanaian Weighbridge Station

Kenya National Highways Authority

(KeNHA) officials at a Weighbridge Station

Ugandan Weighbridge Station

78 of 103

�

​

​

​

​

​

78

AXLE LOAD CONTROL

79 of 103

CONTROL OF AXLE LOAD ON THE NATION’S ROAD NETWORK

  • The Federal Highways Act vests the powers for management, direction and control of Federal Highways throughout Nigeria on the Minister responsible for Federal Highways.
  • The powers include regulating axle loads and management of weighbridges.
  • The maximum permissible total axle load in Nigeria is 51 tonnes to be carried by at least 6 axles
  • Axle Load limits are imposed for a number of reasons: -
    • To ensure that loads carried by trucks are transported safely,
    • To ensure long life spans for vehicles,
    • To protect the road pavement from early deterioration and failure,
    • To protect bridges from structural weakening, fatigue and failure.

​

​

​

79

80 of 103

CONTROL OF AXLE LOAD ON THE NATION’S ROAD NETWORK

80

PERMISSIBLE GROSS WEIGHTS PER AXLE FOR THE VARIOUS AXLE CONFIGURATIONS AND PENALTY FEES

 

81 of 103

CONTROL OF AXLE LOAD ON THE NATION’S ROAD NETWORK

81

PERMISSIBLE GROSS WEIGHTS PER AXLE FOR THE VARIOUS AXLE CONFIGURATIONS AND PENALTY FEES-Cont’d

 

82 of 103

CONTROL OF AXLE LOAD ON THE NATION’S ROAD NETWORK

82

PERMISSIBLE GROSS WEIGHTS PER AXLE FOR THE VARIOUS AXLE CONFIGURATIONS AND PENALTY FEES-Cont’d

 

83 of 103

�

​

​

​

​

​

83

MANAGEMENT OF WEIGH BRIDGES

84 of 103

���MANAGEMENT OF WEIGH BRIDGES����

84

​

THE PROCESS OF RE-INTRODUCING AXLE LOAD CONTROL ON THE FEDERAL HIGHWAY AT SOME SELECTED LOCATIONS NATION WIDE IS ON-GOING

​

85 of 103

MANAGEMENT OF WEIGHBRIDGES

  • Weighbridges in Nigeria are expected to conform to the following specifications:
  • Surface Mounted Digital Computerized System
  • Full Size Length – 18m
  • Full Size Width – 3m
  • Maximum Weight – 140 tonnes
  • Capacity – 100 tonnes
  • Sensitivity – 10kg
  • Dust Proof – 100%

​

85

86 of 103

�����COMPLETED WEIGHBRIDGE STATION�����

​

​

​

​

​

​

86

SOME OF THE CONSTRUCTED WEIGH BRIDGE STATIONS FOR AXLE LOAD CONTROL

87 of 103

�

​

​

​

​

​

87

PENALTIES FOR AXLE LOAD VIOLATION

​

88 of 103

88

  • Fine for using an overloaded vehicle on Federal Road is N1,000,000.00 payable at the Weighbridge Station (WBS).
  • In addition, the vehicle operator or owner will pay fines corresponding to the excess weights.
  • Where the fees prescribed above are not paid in 90days, an issue of a notice of sale by auction of the vehicle and its cargo shall be given and the sales carried out 7days from the date of the notice.
  • Overloaded vehicles shall have two (2) days moratorium for parking after which they shall pay fees for parking at the WBS.

PENALTIES FOR AXLE LOAD VIOLATION

89 of 103

CONTROL OF AXLE LOAD ON THE NATION’S ROAD NETWORK

89

90 of 103

�

​

​

​

​

​

90

RE-INTRODUCTION OF TOLL PLAZAS

91 of 103

RE-INTRODUCTION OF TOLL PLAZAS

​

​

91

The Federal Government is considering the re-introduction of Tolling on “Bankable Roads” on the Federal road network to enhance sustainable maintenance of the roads

Axle load control on the nation’s highways has become necessary to limit the excess traffic loading on the roads and extend the service life of the pavements

92 of 103

������

92

​

THE TOLLING SYSTEM ON THE NATIONS FEDERAL HIGHWAYS WILL INCLUDE FACILITIES SUCH AS REST AREAS

​

THE PROPOSED TOLLING SYSTEM IS DESIGNED TO BE CASHLESS EFFICIENT SYSTEM

​

RE-INTRODUCTION OF TOLL PLAZAS – Cont’d

93 of 103

������

​

​

​

​

​

​

93

PROPOSED TOLL GATE WITH MODERN FACILITIES TO BE INTRODUCED AT DIFFERENT LOCATIONS NATION WIDE

RE-INTRODUCTION OF TOLL PLAZAS – Cont’d

94 of 103

�

​

​

​

​

​

94

ROAD FURNITURE ON FEDERAL ROADS

95 of 103

�

​

​

​

      • The Ministry in 2016 commenced the programme of providing adequate road signs on the Federal Road Network
      • This is to aid motorists traversing the network and improve safety on Federal Roads
      • Road signs were installed on 41 roads across the country in 2016 and 56 roads were selected for installation of road furniture in 2017 (Road signs and Rumble Strips)
      • The Ministry is partnering with the FRSC to produce the road signs
      • This is to ensure standardization of the signs and promote local content in line with the Federal Government’s policy on patronizing made in Nigeria goods

​

​

95

INSTALLATION OF ROAD FURNITURE�

96 of 103

96

  • The road sign installation by the Ministry seems to be have a positive effect on safety of motorists
  • Analysis of the Federal Road Safety Corps (FRSC) for Road Crash Report November, 2017 shows 1% decrease in fatality (deaths), 3% decrease in crash cases (RTC) and 9% decrease in the number of people injured as compared to the preceding month of October, 2017.
  • Speed Violation (SPV) was identified as the singular most prevalent causal factor to road traffic crash cases in the month under review, accounting for 430 cases representing 58% of the total causes of crashes.

INSTALLATION OF ROAD FURNITURE�

97 of 103

97

PRODUCTION OF STANDARDISED ROAD SIGNS BY FRSC

98 of 103

98

PROVISION OF ROAD FUNITURE �(ROAD SIGN AND RUBBLE STRIPS)

99 of 103

�

​

​

​

​

​

99

WAY FORWARD/CONCLUSION

100 of 103

100

  • Public and stakeholders support is essential to prolong the service life of the National Road Network
  • Laws and regulation guiding the safe use of road infrastructure should be obeyed by all.

​

WAY FORWARD

101 of 103

CONCLUSION

Effective axle load control will:

    • Improve safety
    • Facilitate equitable transport
    • Reduce damage to roads
    • Improve environment for concessioning roads and can be integrated easily
    • Generate saving in terms of prolonged life of the road structure

101

102 of 103

102

CONCLUSION-Cont’d

The Ministry will continue to deploy her human and material resources to ensure that her vision is to elevate Nigerian roads to a standard where they become veritable national assets and a tool for national integration, contributing to national growth and development and help to re-invent the trust and confidence of Nigerians in the Federal Government.

103 of 103

​

THANK YOU

103