PRESENTED AT THE ONE (1) DAY
STAKEHOLDERS FORUM ON
MONDAY, 19TH MARCH, 2018
BY BABATUNDE RAJI FASHOLA, SAN
HONOURABLE MINISTER OF POWER, WORKS & HOUSING
FEDERAL MINISTRY OF POWER, WORKS & HOUSING (WORKS SECTOR)�
DEVELOPMENTS IN THE ROAD SECTOR HIGHLIGHTING:
PLANS, PROGRAMMES AND PROGRESS ON THE FEDERAL ROAD NETWORK
2
1
2
3
4
5
6
7
8
9
10
PRESENTATION OUTLINE
�
3
INTRODUCTION
��� INTRODUCTION���
4
The Road transport accounts for over 90% of freight and passenger services for inland transportation and therefore the importance of the national road network as a major contributor to the socio-economic development of the country can therefore, not be over-emphasized
Efforts are being made to keep the Federal road network in serviceable condition, given its socio-economic importance
MAP OF FEDERAL ROAD NETWORK
5
�
6
MAJOR ROUTES ON THE FEDERAL HIGHWAY NETWORK AND CORRIDORS CONNECTING OTHER COUNTRIES
��MAJOR NORTH-SOUTH ROUTES ON THE �FEDERAL ROAD NETWORK�ROUTE A1 TO A9��
7
The Major North-South routes carry the heaviest traffic in the country including imports from the ports to the hinterland and produce to the ports for export.
These major roads are classified as Route A1 to A9 and require adequate attention to be in serviceable condition for traffic at all times in order to ensure that economic operations are efficient and optimized.
FEDERAL HIGHWAY ROUTE A1�The road starting at the main entrance gate to Apapa Wharf (Lagos)-Ikorodu-Shagamu-Ibadan-Oyo-Ilorin-Jebba- Kontagora-Yelwa-Koko-Jega-Tambawal-Sokoto-Illela-Niger Republic border. �
HIGHWAYS PLANNING AND DEVELOPMENT
8
FEDERAL HIGHWAY ROUTE A2�The road starting at Kongolam at the boundary with Niger Republic- Daura-Kano-Zaria-Kaduna-Abuja- Lokoja-Auchi-Benin- Warri.�
HIGHWAYS PLANNING AND DEVELOPMENT
9
FEDERAL HIGHWAY ROUTE A3�The road starting at the road over rail bridge at PortHarcourt-Aba-Umu Uyo-Owerrinta-Umuahia-UmuDuru-Okigwe-Awgu-Oji River-Otukpa-Oturkpo-Aliade-Makurdi-Lafia-Akwanga-Wamba-Jos-Bauchi-Kiri-Potiskum-Maiduguri- Gamboru.�
HIGHWAYS PLANNING AND DEVELOPMENT
10
FEDERAL HIGHWAY ROUTE A4�The road starting from Calabar-Ugep-Ikom - Ogoja-Katsina Ala-Jalingo-Yola Gombi-Bama-Maiduguri�
HIGHWAYS PLANNING AND DEVELOPMENT
11
Bama
FEDERAL HIGHWAY ROUTE A5�The road starting 62.7 metres from the south abutment of Carter Bridge on Lagos Island and continuing over Carter Bridge - Denton Street-Clifford Street-City Way- Yaba Roundabout-Agege -Sango Otta-Abeokuta-Ibadan.�
HIGHWAYS PLANNING AND DEVELOPMENT
12
Sango Otta
FEDERAL HIGHWAY ROUTE A6�The road starting from Onitsha-Nnewi-Ihiala-Owerri-to the Junction of Trunk Road A.3 at Umu Uyo.�
HIGHWAYS PLANNING AND DEVELOPMENT
13
FEDERAL HIGHWAY ROUTE A7�The road starting from Chikanda - Yeshikere-Kosubosu-Kaiama Kishi-Ilorin.�
HIGHWAYS PLANNING AND DEVELOPMENT
14
FEDERAL HIGHWAY ROUTE A8�The road starting from Mayo Belwa Junction-Ganye-Jamtari-Serti-Mayo Selbe-Gembu on the Mambilla Plateau.�
HIGHWAYS PLANNING AND DEVELOPMENT
15
FEDERAL HIGHWAY ROUTE A9�The road starting from Jibiya-Katsina-Kano.�
HIGHWAYS PLANNING AND DEVELOPMENT
16
17
MAJOR ROAD CORRIDORS IN NIGERIA LINKING OTHER COUNTRIES
HIGHLIGHTS OF THE ABIDJAN-LAGOS CORRIDOR
18
MAJOR ROAD CORRIDORS IN NIGERIA LINKING OTHER COUNTRIES – cont’d
19
MAJOR ROAD CORRIDORS IN NIGERIA LINKING OTHER COUNTRIES – cont’d
COUNTRIES THAT ARE MEMBERS OF THE TRANS-SAHARAN ROAD LIAISON COMMITTEE
TRANS-SAHARAN ROADS CORRIDOR
20
MAJOR ROAD CORRIDORS IN NIGERIA LINKING OTHER COUNTRIES – cont’d
MAJOR ROAD CORRIDORS IN NIGERIA LINKING OTHER COUNTRIES – cont’d
21
NIGERIA
CAMEROON
MAJOR ROAD CORRIDORS IN NIGERIA LINKING OTHER COUNTRIES – cont’d
ENUGU – CAMEROON BORDER ROAD
22
�
23
MANAGEMENT OF THE ROAD ASSET
ROAD ASSET MANAGEMENT SYSTEM (RAMS)
24
ROAD ASSET MANAGEMENT SYSTEM (RAMS)- Cont’d
25
CORING OF WEARING COURSE TO UNDERTAKE
DYNAMIC CONE PENETROMETER (DCP) TEST
FALLING WEIGHT DEFLECTOMETER (FWD) EQUIPMENT TESTING PAVEMENT STRENGTH
RAMS will improve the technical capacity, skills and management capability of the Ministry, thus improving efficiency and cost effectiveness in road improvement activities
26
2017 TRAFFIC CENSUS SURVEY
ROAD ASSET MANAGEMENT SYSTEM (RAMS)- Cont’d
27
2017 TRAFFIC CENSUS SURVEY
ROAD ASSET MANAGEMENT SYSTEM (RAMS)- Cont’d
ROAD ASSET MANAGEMENT SYSTEM (RAMS)- Cont’d
28
2017 TRAFFIC CENSUS SURVEY
�
29
���FUNDING OF FEDERAL ROADS DEVELOPMENT���
30
31
MINISTRY’S ANNUAL INVESTMENT BUDGET FOR ROAD PROJECTS
IN THE LAST FIVE (5) YEARS
���SOLVING THE FUNDING GAP���
32
HIGHWAYS PLANNING AND DEVELOPMENT
33
FUNDING OF SUKUK PROJECTS BY ZONE
34
�
35
PRIORITIZATION OF ROUTES DEVELOPMENT AND ACHIEVEMENTS (MAY, 2015 – FEBRUARY, 2018)
PRIORITIZATION OF PROJECTS�
The Works Sector (Highway) programme for restoration of our road network has been defined taking into account the main challenges facing the sector namely:
As priority, the need is seen to put emphasis on the completion of ongoing projects on a prioritized basis.
36
Prioritized Projects for 2017-2019�
37
���PRIORITIZATION OF PROJECTS���
SOME PRIORITIZED CRITICAL HIGHWAY ON-GOING PROJECTS ON THE MAJOR ARTERIAL ROUTES
38
Kano-Maiduguri;
Abuja-Abaji-Lokoja;
Lagos-Ibadan-Ilorin-Jebba
Benin-Shagamu
Onitsha-Enugu-Port Harcourt
Abuja-Kaduna-Zaria-Kano
Odukpani-Itu-Ikot Ekpene
���ACHIEVEMENTS IN THE ROAD SECTOR (3)���
39
���PRIORITIZATION OF PROJECTS���
SOME PRIORITIZED MAJOR BRIDGE PROJECTS
40
2nd Niger Bridge
Loko- Oweto Bridge
��� ACHIEVEMENTS IN THE ROAD SECTOR � NATIONWIDE BRIDGE IMPROVEMENT PROGRAMME ���
41
���PRIORITIZATION OF PROJECTS���
SOME PRIORITIZED HIGHWAY ON-GOING PROJECTS THROUGH AGRICULTURAL PRODUCING AREAS
42
Rehabilitation Sokoto-Tambuwal-Jega-Kontagora-Makera Road,
Rehabilitation of 9th Mile-Oturkpo-Makurdi Road (Otukpa-Oturkpo Section) in Benue State,
Gombe-Numan-Yola Road
�
PART THREE:
TWO YEARS ACHIEVEMENTS
29TH MAY 2015 – 29TH MAY, 2017
43
���PRIORITIZATION OF PROJECTS���
SOME PRIORITIZED HIGHWAY LEADING TO NNPC DEPOTS, PORTS, & MINERAL PRODUCING AREAS
44
Dualisation of Suleja-Minna Road in Niger State
Rehabilitation of Access Road to Apapa/Tin Can Island Port-NNPC Depot (Atlas Cove) in Lagos State
Construction Of Agaie-Katcha-Barro Road (Rigid Pavement) in Niger State
��� ACHIEVEMENTS IN THE ROAD SECTOR � NATIONWIDE BRIDGE IMPROVEMENT PROGRAMME ���
45
The Bridge Department was commissioned to carry out Bridge inspections to determine the present condition of all bridges nationwide resulting from destruction by insurgents, willful damage by illegal under-bridge squatters, vandalization of bridge members and lack of routine and periodic maintenance, etc.
The inspection showed that Federal Bridges nationwide are in unsatisfactory condition
HIGHWAYS PLANNING AND DEVELOPMENT
46
HIGHWAYS PLANNING AND DEVELOPMENT
47
�
48
ACHIEVEMENTS FROM
MAY, 2015 – JUNE, 2017
ACHIEVEMENTS�
Physical works completed on various projects location across the Federal Road network are as follows:
49
�
50
SOME PICTURES OF ON-GOING PROJECTS
�����PROGRESS PHOTOGRAPHS�����
DUALISATION OF SULEJA-MINNA ROAD IN NIGER STATE
51
REHABILITATION OF ILORIN-JEBBA-MOKWA-BOKANI ROAD IN KWARA STATE, C/NO.6210
NORTH CENTRAL ZONE
�����PROGRESS PHOTOGRAPHS�����
CONSTRUCTION OF LOKO – OWETO BRIDGE ACROSS RIVER BENUE IN NASARAWA AND BENUE STATES, CONTRACT NO. 6108
52
DUALIZATION OF ABUJA-ABAJI-LOKOJA ROAD SECTION I, INTERNATIONAL AIRPORT LINK ROAD JUNCTION - SHEDA VILLAGE JUNCTION C/NO 5862;
NORTH CENTRAL ZONE
����PROGRESS PHOTOGRAPHS����
53
DUALIZATION OF KANO-MAIDUGURI ROAD (SECTION IV,POTISKUM-DAMATURU) IN YOBE STATE, C/NO.5881
NORTH EAST ZONE
COMPLETION OF GOMBE-NUMAN-YOLA ROAD PHASE II (GOMBE-KALTUNGO) IN GOMBE STATE, C/NO.6261
����PROGRESS PHOTOGRAPHS����
54
JALINGO -KONA-LAU-KARIM LAMIDO ROAD, PHASE L IN TARABA STATE
NORTH EAST ZONE
REHABILITATION OF YOLA – HONG – MUBI ROAD IN ADAMAWA STATE
����PROGRESS PHOTOGRAPHS����
55
DUALIZATION OF KANO-KATSINA ROAD, PHASE I IN KANO/KATSINA STATES
NORTH WEST ZONE
REHABILITATION OF SECTION IA OF SOKOTO-TAMBUWAL-JEGA-KONTAGORA-MAKERA ROAD, PHASE I IN SOKOTO/KEBBI STATES
����PROGRESS PHOTOGRAPHS����
56
NORTH WEST ZONE
REHABILITATION OF ZARIA-GUSAU-SOKOTO-BIRNIN KEBBI ROAD (FUNTUA-GUSAU SECTION) IN KATSINA STATE
�����PROGRESS PHOTOGRAPHS�����
57
REHABILITATION OF ENUGU-PORT HARCOURT DUAL CARRIAGEWAY SECTION I: LOKPANTA-UMUAHIA IN ABIA STATE C/NO.6208
REHABILITATION OF ENUGU-PORT HARCOURT DUAL CARRIAGEWAY SECTION III: ENUGU-LOKPANTA IN ENUGU STATE
SOUTH EAST ZONE
�����PROGRESS PHOTOGRAPHS�����
58
REHABILITATION OF ENUGU-ONITSHA DUAL CARRIAGEWAY
SOUTH EAST ZONE
�����PROGRESS PHOTOGRAPHS�����
59
DUALISATION OF OBAJANA JUNCTION TO BENIN PHASE 2: SECTION IV( EHOR-BENIN) IN EDO STATE, C/NO.6138
SOUTH SOUTH ZONE
CONSTRUCTION WORK ON BODO -BONNY ROAD WITH BRIDGES (SUBSOIL INVESTIGATION )
�����PROGRESS PHOTOGRAPHS�����
60
REHABILITATION OF ALESI – UGEP (IYAMOYUNG – UGEP) SECTION IN CROSS RIVER STATE
SOUTH SOUTH ZONE
DUALIZATION OF YENEGWE ROAD JUNCTION-KOLO-OTUEKE-BAYELSA PALM (20KM) IN BAYELSA STATE
�����PROGRESS PHOTOGRAPHS�����
61
REHABILITATION OF LAGOS-SHAGAMU-IBADAN DUAL CARRIAGEWAY SECTION I: LAGOS-SHAGAMU IN LAGOS/OGUN STATES
REHABILITATION/RECONSTRUCTION OF LAGOS-IBADAN DUAL CARRIAGEWAY SECTION II: SHAGAMU – IBADAN IN OGUN/OYO STATES
SOUTH WEST ZONE
�����PROGRESS PHOTOGRAPHS�����
62
RECONSTRUCTION OF APAPA-WHARP ROAD IN LAGOS STATE
DESIGN AND CONSTRUCTION OF TEWURE-AJINAPA ROAD IN OYO STATE
OVERLAY OF BENIN-OFOSU-AJEBANDELE- SHAGAMU DUAL CARRIAGEWAY,PHASE IV IN ONDO/OGUN STATES
SOUTH WEST ZONE
�
63
ABUSE OF ROAD INFRASTRUCTURE
64
ABUSE OF ROAD INFRASTRUCTURE Cont’d
HGV PLYING THE ROAD WITHOUT TYRE ON ONE AXLE WHICH CAUSES UNEVEN DISTRIBUTION OF VEHICLE LOAD
65
ABUSE OF ROAD INFRASTRUCTURE Cont’d
ILLEGAL MOTOR PARK AROUND AND UNDER ISAAC BORO PARK/ MILE 1 BRIDGE IN PORT HARCOURT
66
ABUSE OF ROAD INFRASTRUCTURE Cont’d
BURNT EKO BRIDGE IN LAGOS DUE TO ILLEGAL ACTIVITIES UNDER THE BRIDGE
67
Summary of Results of Independent Axle Load Survey carried out in 2008�
Source: Axle Load Survey, 2008
Heavy Vehicle Class | No. counted | No. weighed | No. of Overloaded vehicles | % vehicles Overloaded | No. of Overloaded axles | Average % Overloaded per axle |
2 Axle | 1479 | 316 | 97 | 30.7 | 114 | 36.1 |
3 Axle | 656 | 162 | 100 | 61.7 | 192 | 57.4 |
4 Axle | 1696 | 691 | 407 | 58.9 | 1112 | 51.1 |
5 Axle | 648 | 166 | 89 | 53.6 | 287 | 46.8 |
6 & more Axle | 111 | 15 | 7 | 46.7 | 29 | 35.4 |
Totals | 4590 | 1350 | 700 | 51.9 | 1734 | 48.8 |
68
ABUSE OF ROAD INFRASTRUCTURE Cont’d
Comparison of 2008 Traffic Data and 2017
Source: Axle Load Study 2008 69
2008 Traffic Volume on Major Federal Roads
ABUSE OF ROAD INFRASTRUCTURE Cont’d
Heavy Goods Vehicle Flow
Source: Axle Load Study 2008 70
ABUSE OF ROAD INFRASTRUCTURE - Cont’d
�
71
CONTROL OF AXLE LOAD ON THE FEDERAL ROAD NETWORK
�
72
EFFECT OF EXCESSIVE AXLE LOAD
EFFECT OF EXCESSIVE AXLE LOAD
73
EFFECT OF EXCESSIVE AXLE LOAD – Cont’d
PAVEMENT DAMAGE ON ABUJA-LOKOJA EXPRESSWAY DUE TO OVER LOADING
�
75
TYPICAL OVERLOADED COMMERCIAL VEHICLE
IN NIGERIA
EFFECT OF EXCESSIVE AXLE LOAD –Cont’d
76
EFFECT OF EXCESSIVE AXLE LOAD –Cont’d
TYPICAL OVERLOADED COMMERCIAL VEHICLE
IN NIGERIA
AXLE LOAD CONTROL IN OTHER AFRICAN COUNTRIES
77
Ghana National Government enforced the axle load policy to control loading at the ports of entry effective June 1, 2009 in accordance with ECOWAS regulations.
Other African Countries such as Namibia, Uganda, South Africa etc. have made axle load control on highways a priority.
Ghanaian Weighbridge Station
Kenya National Highways Authority
(KeNHA) officials at a Weighbridge Station
Ugandan Weighbridge Station
�
78
AXLE LOAD CONTROL
CONTROL OF AXLE LOAD ON THE NATION’S ROAD NETWORK
79
CONTROL OF AXLE LOAD ON THE NATION’S ROAD NETWORK
80
PERMISSIBLE GROSS WEIGHTS PER AXLE FOR THE VARIOUS AXLE CONFIGURATIONS AND PENALTY FEES
CONTROL OF AXLE LOAD ON THE NATION’S ROAD NETWORK
81
PERMISSIBLE GROSS WEIGHTS PER AXLE FOR THE VARIOUS AXLE CONFIGURATIONS AND PENALTY FEES-Cont’d
CONTROL OF AXLE LOAD ON THE NATION’S ROAD NETWORK
82
PERMISSIBLE GROSS WEIGHTS PER AXLE FOR THE VARIOUS AXLE CONFIGURATIONS AND PENALTY FEES-Cont’d
�
83
MANAGEMENT OF WEIGH BRIDGES
���MANAGEMENT OF WEIGH BRIDGES����
84
THE PROCESS OF RE-INTRODUCING AXLE LOAD CONTROL ON THE FEDERAL HIGHWAY AT SOME SELECTED LOCATIONS NATION WIDE IS ON-GOING
MANAGEMENT OF WEIGHBRIDGES
85
�����COMPLETED WEIGHBRIDGE STATION�����
86
SOME OF THE CONSTRUCTED WEIGH BRIDGE STATIONS FOR AXLE LOAD CONTROL
�
87
PENALTIES FOR AXLE LOAD VIOLATION
88
PENALTIES FOR AXLE LOAD VIOLATION
CONTROL OF AXLE LOAD ON THE NATION’S ROAD NETWORK
89
�
90
RE-INTRODUCTION OF TOLL PLAZAS
RE-INTRODUCTION OF TOLL PLAZAS
91
The Federal Government is considering the re-introduction of Tolling on “Bankable Roads” on the Federal road network to enhance sustainable maintenance of the roads
Axle load control on the nation’s highways has become necessary to limit the excess traffic loading on the roads and extend the service life of the pavements
������
92
THE TOLLING SYSTEM ON THE NATIONS FEDERAL HIGHWAYS WILL INCLUDE FACILITIES SUCH AS REST AREAS
THE PROPOSED TOLLING SYSTEM IS DESIGNED TO BE CASHLESS EFFICIENT SYSTEM
RE-INTRODUCTION OF TOLL PLAZAS – Cont’d
������
93
PROPOSED TOLL GATE WITH MODERN FACILITIES TO BE INTRODUCED AT DIFFERENT LOCATIONS NATION WIDE
RE-INTRODUCTION OF TOLL PLAZAS – Cont’d
�
94
ROAD FURNITURE ON FEDERAL ROADS
�
95
INSTALLATION OF ROAD FURNITURE�
96
INSTALLATION OF ROAD FURNITURE�
97
PRODUCTION OF STANDARDISED ROAD SIGNS BY FRSC
98
PROVISION OF ROAD FUNITURE �(ROAD SIGN AND RUBBLE STRIPS)
�
99
WAY FORWARD/CONCLUSION
100
WAY FORWARD
CONCLUSION
Effective axle load control will:
101
102
CONCLUSION-Cont’d
The Ministry will continue to deploy her human and material resources to ensure that her vision is to elevate Nigerian roads to a standard where they become veritable national assets and a tool for national integration, contributing to national growth and development and help to re-invent the trust and confidence of Nigerians in the Federal Government.
THANK YOU
103