  • Spectrum Aspects and WRC-23 Preparation Working Group Interim meeting was held from 19th to 22nd April 2022 in Geneva. The meeting was in hybrid mode. A total of 6 delegates from TSDSI registered for the meeting.

- In the meeting, it was recommended that the focus in the WP5D meeting should be given to the further development of the draft CPM text for WRC-23 agenda items 1.1 and 1.2

  • A total of 21 output documents were produced during this interim meeting (as detailed in Doc. 5D/ADM/274)
  • The list of output documents is embedded below

  • These documents should be used as the basis for input contributions to the next WP 5D meeting.

A workshop on [IMT.Vision 2030 and beyond] will be held in the June meeting of WP5D. Details are shared over email by the Secretariat. TSDSI presentation is proposed to be submitted for the workshop.

Next ITU-R WP5D meeting schedule

3 of 7

Some other Important work areas (1/4)

3

SNo.

Name of the Document

Last WP5D meeting for submitting contributions

Status from WP5D#40e

1

Working document towards a preliminary draft new Recommendation ITU-R M.[IMT.VISION 2030 AND BEYOND]:Framework and overall objectives of the future development of IMT for 2030 and beyond

Meeting No. 43 (January 31-February 9 2023, [Geneva])

Work in progress.

2

Draft working document towards a preliminary draft new Report ITU-R M.[IMT.FUTURE TECHNOLOGY TRENDS OF TERRESTRIAL IMT SYSTEMS TOWARDS 2030 AND BEYOND]

Meeting No. 41 (13-24 June 2022)

The received contributions were merged, and an edited document was upgraded to Preliminary draft new report. Document to be finalized in the next meeting.

4 of 7

Some other Important work areas (2/4)

4

SNo.

Name of the Document

Last WP5D meeting for submitting contributions

Status from WP5D#40e

3

Draft working document towards a preliminary draft new Report ITU-R M.[IMT TERRESTRIAL BROADBAND REMOTE COVERAGE]: This Report provides details on scenarios associated with the provisioning of enhanced mobile broadband services to remote sparsely populated and underserved areas with a discussion on enhancements of user and network equipment

Meeting No. 41 (13-24 June 2022)

Document was upgraded to Preliminary draft new report. Document to be finalized in the next meeting.

4

Working document toward a preliminary draft new Report ITU-R M.[IMT Media]. This document is intended to deal with Capabilities of the terrestrial of IMT-2020 systems for media application [and/or Audio-visual] in the Land Mobile Service.

Meeting No. 43 (February 2023, [TBD])

Work in progress

5 of 7

Some other Important work areas (3/4)

5

SNo.

Name of the Document

Last WP5D meeting for submitting contributions

Status from WP5D#40e

5

Draft working document towards a preliminary draft new Report ITU-R M.[IMT. Above 100 GHz Technical feasibility of IMT in bands above 100 GHz]

Meeting No. 44 (13-23 June 2023, [TBD])

Work in progress

6

Working document towards a preliminary draft new Report ITU-R M.[IMT.INDUSTRY] - Applications of IMT for specific societal, industrial and enterprise usages

Meeting No. 42 (10-21 October 2022, [TBD])

Work in progress

6 of 7

Some other Important work areas (4/4)

6

SNo.

Name of the Document

Last WP5D meeting for submitting contributions

Status from WP5D#40e

7

Working document towards a preliminary draft new Recommendation ITU-R M.[FSS_ES_IMT_26GHz] - Guidelines to assist administrations to mitigate interference from FSS earth stations into IMT stations operating in the frequency bands 24.65-25.25 GHz and 27-27.5 GHz