REDEVLOPMENT OF PUNE RAILWAY STATION
CHRONOLOGY:
|
|
|
|
|
|
|
|
|
|
|
|
CHRONOLOGY:
|
|
|
|
|
Sr. No | Description of deliverables | Status and planning |
1 | Inception Report, Feasibility�report, situation analysis report, Method Statement for preparation of DPR and land due diligence report. | Submitted |
2 | Preliminary Report (PR), Infrastructure Development Report (IDR), Land Redevelopment Report (LRR), and Geotechnical Investigations Report (GIR) | Submitted |
3 | Draft Concept Plan & DPR, Conceptual Architectural Plans with 3D views, and walk through presentation, Traffic Planning Report (TPR), Preliminary CAPEX Report & Financial valuation report, and list of approval required. | Submitted |
4 | Final Master Plan, Final DPR, Technical feasibility, Final cost estimates, Specification and Final Valuation report | 'D' Day |
5 | Approval of Master Plan by Division | D + 15 |
6 | Aapproval of Master Plan by HQ | D + 30 |
7 | Submission of Final proposal for sanctioning of Rly Bd. | D + 45 |
8 | Approval of final proposal by Rly Bd. | D + 75 |
9 | Preparation of Detailed Estimate and vetting by Finance | D + 100 |
10 | Submission of Tender drawings and documents | D + 100 (In shadow of vetting time) |
11 | Tender Finalization and submission of GFC drawings and commencement of work | D + 160 |
TIMELINE:
Sr. No | Description of deliverables | Status and planning |
|
|
|
| Execution of works: | Award of Contract date-’ A’ |
11 | Mandatory works: |
|
i | Front station Building completion | A + 730 Days ( 2.0 years) |
ii | Rear station Building completion | A + 730 Days ( 2.0 years) |
iii | FOB cum concourse completion | A + 912 Days (2.5 years) |
iv | Elevated Road completion | A + 1095 Days (3.0 years) |
v | Bus stand completion | A + 365 Days (1 Year) |
vi | Running Room , parcle office and external development completion | A + 365 Days ( 1.0 year) |
|
|
|
12 | Non-Mandatory works: |
|
i | Commercial zone in front station building completion | A + 1095 Days (3.0 years) |
ii | Commercial zone in Rear station building completion | A + 1095 Days (3.0 years) |
TIMELINE:
PROPOSED MASTER PLAN - 3D VIEW
Rear building proposed with commercial tower and dedicated pick up and drop off lanes. The building augments the access to the station
Pick Up and Drop Off
Elevated road has been proposed to access the MLCP in Phase 2
FRONT STATION BUILDING, 2 Floors
EXISTING STATION BUILDING , 2 Floors
PROPOSED COMMERCIAL, 6 Floors
Pedestrian plaza directly leading to the concourse through city connection that allows seamless connection between rear and front side
PROPOSED STATION: ELEVATED ROAD VIEW
FRONT STATION BUILDING
PROPOSED COMMERCIAL, 6 Floors
REAR STATION BUILDING, 6 Floors
16m
REDEVLOPMENT OF SHIVAJINAGAR RAILWAY STATION
CHRONOLOGY:
SHIVAJI NAGAR RAILWAY STATION
|
|
|
|
|
|
|
|
|
CONCEPT 1 (main entry aerial view)
27
SHIVAJI NAGAR RAILWAY STATION, PUNE
29
SHIVAJI NAGAR RAILWAY STATION, PUNE
CONCEPT 1 (various views at platform, air-concourse and FOB level)
30
ROOF PLAZA INTERIOR REFERENCE VIEW (72m wide)
SHIVAJI NAGAR RAILWAY STATION, PUNE
62
REDEVLOPMENT OF SAI NAGAR SHIRDI RAILWAY STATION
CHRONOLOGY:
SAINAGAR SHIRDI RAILWAY STATION
|
|
|
|
|
|
|
|
|
|
|
Proposed View – OPTION 1
PROPOSED THEME FOR REDEVELOPED STATION
Proposed View – OPTION 1
PROPOSED THEME FOR REDEVELOPED STATION
Proposed View – OPTION 1
PROPOSED THEME FOR REDEVELOPED STATION
REDEVLOPMENT OF
MIRAJ JUNCTION RAILWAY STATION
CHRONOLOGY:
MIRAJ RAILWAY STATION
April 24: Presentation to GM/CR is given on 07.03.2024, observation received on 23.04.24 by GM/CR. As per MoM, Pune division is requested to share updated ESP of Miraj on 29.04.24.
May 24: Presentation to GM/CR is given on 07.03.2024, observation received on 23.04.24 by GM/CR. As per ESP received by Division, 4 nos of additional stabling line are proposed on second entry side, due to space constraint and instruction from RLDA HQ site inspection for checking feasibility is held on 29.05.24 with consultant. As per site survey feasibility is being explore for second entry. July 24: As per revised ESP received by Pune Division, feasibility for Second Station building is explored and master plan is revised.
August 24: As per revised ESP received by Pune Division, feasibility for Second Station building is explored and master plan is revised. Video Conference with ED Station Development along with all stake holders on 09 Aug 24. Station Building roof canopy design needs to be revisited and changes incorporated owing to the water retention problem. |
February 25: Physical file of Consultancy contract along with current presentation handed over to CPM/GSU Pune on 17.02.2025. Meeting was held with CAO RFP, DRM/PA, GSU/PA & the RLDA with its consultants presenting the Master Plan to the officials. Novation agreement has been shared to consultant for signing. Consent of consultant is awaited.
|
The consultant is not agreed to sign the novation agreement. The earlier proposal was of Rs 270 Cr. The Railway Board has advised to bring the cost below Rs. 50 Cr. |
VIEW FROM STATION ENTRY (WEST SIDE)
AERIAL VIEW OF STATION DROP-OFF AREA (WEST SIDE)