1 of 1

M&O / Ludlow Access Road

Towards the end of the year in 2021, the access road for Ludlow Preschool was expanded to two lanes. Miller Paving was the awarded contractor. They excavated 9 inches of the existing road and widened the road by 5 feet on both sides. This increased the road total by 21 feet, allowing cars to drive on the road as a two lane road where before it was a one lane road.

before

in progress

after