1 of 7

Design Shower panel

Design Shower Base

Test toilet for pee hole location

House Finishing Critical Path - Day 6 Revision

Evaluate by Saving Old Copies of Revised Plans

Wed Jan 11

House Heat Exchanger from Hillbilly Heater

Build Stove

Build Hydronic Panel

Install TEG

Design: Stove

Wire All Outlets

Wiring Plan

Test Run Pellet Burner

Finish TEG System Design

Test Run TEG

Add Pellet Burner Feeder

Test ¼” outlets

Test Small Pump + overheating

Buy Parts

Connect Pond Pump

Waterproof electrical tape

Propane tank

Finish PV Design

Install pV

House Electrical Plan

Finish Digester Design

Connect Gas Delivery System

Plumb Toilet

Finish Toilet Design

Solenoid Valve Cat 5 Connections

Solenoid Valve Water Connections

Build Water Panel

Design Gutter + Catchment

Install Gutter + Catchment

Connect Sand Filter

Stove + Heat Exchanger

Stove hot water + Tankless Heater

Hydronic Panel + TEG + Digester Heating

Water Panel Up to Ozone

Pond Pump System to Cistern

Sand Filter + Pressure Tank

XXXXXXXXXXXXXXXXXXXXXXXXXX

3 Frames + Grate

Door w/ interior blower attach

Body panels

Ash Drawer

Chimney Flue

Shower Module

Toilet Module

Biodigester

Gas Bag Install

Design: Hydronic Panel + Water Panel + Cistern

Sweiger Metal

Cooler Tube

Water Feed to Cistern

Connect P Tank + Backwash

Publish

2 of 7

Design Shower panel

Design Shower Base

Test toilet for pee hole location

House Finishing Critical Path - Day 1 Revision

Evaluate by Saving Old Copies of Revised Plans

Wed Jan 11

House Heat Exchanger from Hillbilly Heater

Build Stove

Build Hydronic Panel

Install TEG

Design: Stove

Wire All Outlets

Wiring Plan

Test Run Pellet Burner

Finish TEG System Design

Test Run TEG

Add Pellet Burner Feeder

Test ¼” outlets

Test Small Pump + overheating

Buy Parts

Connect Pond Pump

Waterproof electrical tape

Propane tank

Finish PV Design

Install pV

House Electrical Plan

Finish Digester Design

Connect Gas Delivery System

Plumb Toilet

Finish Toilet Design

Solenoid Valve Cat 5 Connections

Solenoid Valve Water Connections

Build Water Panel

Design Gutter + Catchment

Install Gutter + Catchment

Connect Sand Filter

Stove + Heat Exchanger

Stove hot water + Tankless Heater

Hydronic Panel + TEG + Digester Heating

Water Panel Up to Ozone

Pond Pump System to Cistern

Sand Filter + Pressure Tank

XXXXXXXXXXXXXXXXXXXXXXXXXX

3 Frames + Grate

Door w/ interior blower attach

Body panels

Ash Drawer

Chimney Flue

Shower Module

Toilet Module

Biodigester

Gas Bag Install

Design: Hydronic Panel + Water Panel + Cistern

Sweiger Metal

Cooler Tube

Water Feed to Cistern

Connect P Tank + Backwash

Publish

3 of 7

Solenoid - scalable Cat5 connections

Solenoid - scalable water connection

Design Shower panel

Design Shower Base

Test the bathroom for pee hole location

House Finishing Critical Path Until January 20

Evaluate by Saving Old Copies of Revised Plans.

Wed Jan 11

House Heat Exchanger from Hillbilly Heater

Build Stove

Build Hydronic Panel

Install TEG

Design: Hydronic Panel + Water Panel + Cistern + Stove

Wire All Outlets

Wiring Plan

Test Run Pellet Burner

Finish TEG System Design

Test Run TEG

Add Pellet Burner Feeder

Test ¼” outlets

Test Small Pump + overheating

Buy 24V pump with threads

Buy Parts

Connect Pond Pump

Waterproof electrical tape

Propane tank

Finish PV Design

Install pV

House Electrical Plan

Finish Digester Design

Connect Gas Delivery System

Connect Pressure Tank + Backwash

Connect Water Control Panel

Plumb Toilet

Finish Toilet Design

Solenoid Valve Cat 5 Connections

Solenoid Valve Water Connections

Arduino Prototype

Build Water Panel

Design Gutter + Catchment

Install Gutter + Catchment

Connect Sand Filter

  1. Stove + Heat Exchanger
  2. Stove hot water + Tankless Heater
  3. Hydronic Panel + TEG + Digester Heating
  4. Water Panel Up to Ozone
  5. Pond Pump System to Cistern
  6. Sand Filter + Pressure Tank

XXXXXXXXXXXXX

XXXXXXXXXXXXX

Order Parts

3 Frames + Grate

Door w/ interior blower attach

Body panels

Ash Drawer

Chimney Flue

Shower Module

Toilet Module

Biodigester

Gas Bag Install

4 of 7

Sweet Eco Home Finishing

5 of 7

Seed Eco-Home: Layout

16’

48’

16’

32’

kitchen

bath

Utility

greenhouse

4’x6’x20’ tilapia pond

3600 gallon

20k Gallon pond

Grey water

garden

12’

N

South

Digester Bag

Digester

Stove

Water Catchment

12’

12’

Urine

Line

Greywater Line

Blackwater Line

6 of 7

Timeline

Greenhouse

⅛” outlets pressure

Pump minimum power & overheating due to low power?

Hillbilly to heat exchange inside house

Solenoid valve unit - scalable Cat5 connections

Solenoid valve unit - scalable water connection

PV

Biodigester

Water

Bathroom

Finish Design

Buy parts

Hook up pond pump

Test pond pump

Hook up pressure tank + backwash

Finish Design

Do Install

Do cabinet

Wire outlets

Integrate Design

Design Shower panel

Test the bathroom for pee hole location

House Heating via Hillbilly heater

Stove

Build Stove

Control Panel

TEG Testing independent circuit

Pellet burner initial tests - manual feed + auger feed

Finish Design

Connect propane + stove manometer

7 of 7

Open Source Ozonator

Ozonator

0.5 mg/hr

5W

$17

Air Pump $14

Clear PVC

McMaster or