Design Project

Design of a Two People Shelter

(Naggar,Himachal Pradesh-

Kath-Kuni Architecture)

Design Basis Report

​

​

Group 5

​

P. Arun Thamil Kumaran | UCE24158

Kush Chaudhary | UCE24064

Devansh Dave | UCE24034

Aryan Bhansari | UCE24023

2 of 76

3 of 76

Index

3

  1. Introduction
      • Project Background & Objectives
  2. Site Analysis
      • Location & Topography
      • Climate Data
      • Soil & Seismic
  3. Design Criteria
      • Functional Requirements
  4. Drawings & Diagrams
      • Site Plan
      • Site Section
      • Floor Plan
      • Sections
  5. Design Features
      • Spatial Distribution
      • Hybrid Roof
  6. Material Specifications
  7. Quantity Estimations
  8. Construction Sequence
      • Layout & Zoning
      • Foundation
      • Wall Assembly
      • Roof Framing

​

4 of 76

Introduction

5 of 76

5

Project Background & Objectives

  • Location: Kullu Valley, near Naggar town, Himachal Pradesh.
  • Architectural Style: Traditional kath-kuni construction.
  • Purpose: A minimalistic shelter for two explorers.
  • Function: Serves as a basic basecamp, with occupants spending most time outdoors.
  • Design Priorities:
    • Sustainability (low environmental impact).
    • Cultural authenticity (respecting local building traditions).
    • Essential refuge (functional yet simple).

​

​

​

The Site on Google Earth

Image taken from a website

6 of 76

  • Kath-Kuni structures have been prevalent in Himachal for centuries.

​

  • Kath kuni is derived from two words ‘kashth or kath' for wood in Sanskrit and ‘kona' for corner.

​

  • The resilience of the kath kuni structures lie in the flexibility of dry masonry and alternate layers of wood beams without using any mortar. Source(Architectural Digest)

6

Kath-Kuni: The Living Heritage of Himalayan Architecture

Kath

Kona

Image taken from a website

7 of 76

7

The cold weather and snow requires sloping roof upto 45 degrees and has slate roof tiles which are frost resistant. Source (Kaarwan)

The cold weather requires thick insulating walls and the small windows. Source (Architectural Digest)

The section of a house, showing the stone anchor and plinth to prevent landslides. Source(hint of tradition)

Interlocking wooden beams to allow the wood to flex during Earthquakes. Source (ResearchGate)

Adaptations to Climate & Environmental Hazards

Image taken from a website

8 of 76

8

  • The character of a house is the multi-storey unit which is basically a cuboid.

​

  • Each level of the house is utilised in a pattern that makes it a cohesive unit. Source (Academia)

​

​

Note. Sketches showing sketches of seasonal occupation of Space by inhabitants inside Himachali House (Source(Academia))

Adaptive Spatial Design Based on Climatic Conditions

SUMMER

MONSOON

WINTER

March to June

July to October

November to February

Activities take place outside the house, in the balcony and on the plint.

Activities mostly take place inside the house, or in the covered places.

Activities take place inside the rooms in the warmth of wood and stone.

Image taken from a website

9 of 76

Site Analysis

10 of 76

10

Soil & Seismic Factors

​

  • The soil in Naggar is Clayey and Alluvial.
  • They are typically loam to clay loam with grayish-brown to dark brown colors, according to Government of Himachal Pradesh.
  • Soil characteristics, including texture and acidity, can vary with altitude, with heavier stones.
  • Naggar falls within seismic zones IV and V, indicating a high to very high risk of earthquakes.
  • There have been instances of smaller, micro-earthquakes in the state, including Naggar.
  • Despite the seismic activity, some buildings, like Naggar Castle, have demonstrated resilience to earthquakes.This is because of the unique nature of the Kath-Kuni architecture, which is flexible and is not bound by mortar.

Seismic Map of Naggar, Source(ResearchGate)

Alluvial Soil around Beas River, Source(Oishimaya’s Webloq)

Image taken from a website

11 of 76

11

The floor plan for each of the storeys, cattle is stored in the lowest storey in winter, second storey is storage, Third storey is the living space, with a balcony. Source(Kaarwan)

Section of the house showing heat movement, the outside storage of cattle for warmer weather.The town tends to be centered around a temple or a community space. Source(Wikipedia)

Naggar castle facing south, most buildings face south or southeast. Source(Google Earth)

The Sun path for Naggar, shows that being in a valley gets lesser sunlight. South facing houses receive greater solar radiation. Source(Suncalc)

Sun-Path and Orientation of Houses

Image taken from a website

12 of 76

Design Criteria

13 of 76

13

Location & Topography

​

  • The Shelter is located on the slopes of Kullu valley, on the outskirts of Naggar town in Himachal Pradesh.
  • Naggar is located on the left bank of the Beas River at an altitude of 1,800 meters
  • The site area where shelter will be made is at an altitude of 1,523 meters (see site plan).
  • To the south of the site is Beas River.
  • To the north the mountainous slopes get steeper (see site section).

​

Site-Plan

Site-Section

Sketches adapted from another source-not copied

14 of 76

14

Functional Requirements

  • A two person shelter
  • A sleeping space, a study nook and a semi-open space
  • The ratio of closed to semi-open space to be higher in favour of the open space
  • Built up space no more than 17 square metres
  • Should incorporate the traditional construction method with a touch of modernity
  • Space should not be wasted

The basic idea of the requirements N.T.S

Sketches imagined by the student

15 of 76

Ideation

16 of 76

16

Ideation Plan Sheets

Instead of double bed, bunk beds were used to reduce space consumption.Discarded because the closed space was much more than open and a few corner were unusable practically.

Sketches of potential designs.

Sketches imagined by the student

17 of 76

17

Ideation Plan Sheets

This time single beds were used on both sides of the room. Discarded because the closed space was much more than open and there was not much semi-open space.

Sketches imagined by the student

18 of 76

18

Ideation Plan

Sketches imagined by the student

The first to-scale-plan, had a 50-50 spatial organisation, which was not considered to be ideal.The frontal support of the building was lacking

The second to-scale-plan, this plan had stability issue, the 2 unconnected Kath-Kuni walls and the column would be extremely unstable.

19 of 76

19

Ideation Model

Front View

Back View

Left View

Right View

Roof View

Top View without roof

Sketches imagined by the student

20 of 76

Drawings of Design

21 of 76

21

Site Plan

Sketches traced from another source

Site plan showing shelter corner triangulation, building facing south, for better sunlight Exposure, higher building position for soil stability

22 of 76

22

Site Section

Sketches traced from another source

Cross-section of site with building positioned on gentle slope for sleeping area and stilts on steeper slope and the different levels

23 of 76

23

Floor Plan

Sketches imagined by the student

Architectural plan with south-facing layout, snow-resistant double roof.The Spatial design is roughly two-thirds semi-open wooden construction and the rest is an insulated, sleeping space using Kath-Kuni architecture.

24 of 76

24

Section AA’

Sketches imagined by the student

Section AA’: 1m-deep foundation for sleeping space, stilted semi-open area. Double roof + steep single-slope roof for snow/rain runoff. The hybrid double roof is a double pitched slate roof over the sleeping space and a single pitch wooden roof over the Semi-open space

25 of 76

25

Section BB’

Sketches imagined by the student

Section BB’: Double-sloped roof with overhang meets built-up area limits; includes front railings

26 of 76

Material Specifications

27 of 76

27

Wall Section

​

Joinery between Wooden post and the Wooden roof.

This is the final wall section CC’, showcasing the details of Kath Kuni wall and the wooden roof supported by wooden post and a truss system

Sketches imagined by the student

28 of 76

28

Material Specifications

Item

Specification

Standard

Key Requirements

1.1 Foundation Excavation

Soil: Clayey, alluvial

IS 1498-1970

- Lab tests required (sieve analysis, plasticity).

​

Compaction: 95% max dry density

IS 2720 (Part 8)-1983

- Proctor test for OMC/MDD. 3-5 layers, 25-56 hammer blows/layer.

​

Tolerance: ±50mm level

IS 1200 (Part 1)-1992

- Strict level control.

1.2 Foundation Infill

Stone: Dressed river stone

IS 1124-1974

- Strength ≥3.5 MPa. No cracks/voids. Grading: 150-300mm.

​

Placement: Staggered joints

-

- Compacted in layers ≤300mm.

29 of 76

29

Material Specifications

Item

Specification

Standard

Key Requirements

Plinth Stones

Material: Natural stone

IS 1124-1974

- Laid natural bed-wise. Staggered joints.

​

Mortar: Mud (10-20% clay)

IS 2116-1980

- Well-graded sand.

Wooden Components

Species: Deodar/Kail (Grade I/II)

IS 3629-1986

- Grade I: ≤20mm knots, no shakes. Grade II: ≤30mm knots.

​

Moisture: 12-15%

IS 287-1993

- Seasoned timber.

30 of 76

30

Material Specifications

Item

Specification

Standard

Key Requirements

Wooden Walls

Tolerance: ±2mm

-

- Dovetail joints. Wooden nails (same species).

Wooden Roof

Rafters: Straight grain

IS 3629-1986

- Mortise-tenon joints. No defects.

Stone Masonry

Weather-resistant stone

IS 1124-1974

- Uniform layers (100mm). Mud mortar. Rough/smooth dressed.

31 of 76

31

Material Specifications

Item

Specification

Standard

Key Requirements

Roofing

Slate tiles (4-6mm thick)

IS 2220-1983

- Water absorption <0.6%. Strength >30 MPa.

Doors/Windows

Material: Kail wood

-

- Hinges: Wrought iron (IS 2629-1985). Gaps ≤3mm.

Fasteners

Wooden nails: Hardwood, tapered

-

- Same species as main members.

​

Heavy-duty nails: Galvanized

IS 277-1998

- Zinc coating ≥395 g/m².

32 of 76

Quantity Estimations

33 of 76

33

Quantity Estimate

34 of 76

34

34

Quantity Estimate

35 of 76

35

35

Quantity Estimate

Graph on the main materials used in the Kath-Kuni structure, in volume, unit is cubic metre

12.5

2.7

0.75

0.75

Graph on the numbers on the different fasteners used.

36 of 76

36

36

Quantity Estimate

A pie chart for the percentage of the component used in the construction of the shelter

37 of 76

37

37

Material Procurement and Regulation Compliance

  • Locally Sourced Materials: Most of the main materials are locally sourced, the undressed stone can be acquired from the Beas river bank and some amount of the infill, The remaining infill and dressed river stone can be acquired from Stone dealers in Naggar or in the rest of Kullu Valley
  • Responsible Timber Use: Only essential trees are carefully selected and felled, with the harvested wood fully utilized in construction to avoid waste.
  • Compliance with Standards:
    • All materials and construction methods adhere to Indian Standard (IS) codes for safety and durability.
    • Where IS codes lack provisions, references are drawn from Prathaa (2023) and supplementary online resources (cited in the bibliography and in the speaker notes).

​

38 of 76

Construction Sequence

39 of 76

39

  • The construction begins with site preparation by marking the front two corners of the house through triangulation, using nearby trees as reference points as indicated in the site map.

​

​

​

  • The house is oriented such that the semi-open area faces the southeast direction to take advantage of optimal sunlight and climatic conditions.

​

​

​

  • Once the orientation is finalized and the corner points are fixed, a grid system is laid out on the site. This consists of three horizontal and three vertical grid lines, each corresponding to the alignment of structural walls and internal partitions.

Sketches traced from another source

Sketches imagined by the student

The base of the model with contours

Part of the Site section with triangulation and grid

Construction Sequence

40 of 76

40

  • A rectangular area defined between grid lines A, B, 1, and 2,(with the longer side parallel to grid line A), is leveled to prepare the ground for foundation work of the kath kuni structure.

​

  • A trapezoidal pit, 1m is excavated for the kath kuni construction. .

​

  • The kath kuni foundation is built using large uncut stones, placed dry without mortar.

​

  • The stones used in the foundation are approximately 40–50 cm in length, 30–35 cm in width, and 5–6 cm in thickness, are stacked in successive layers, each around 30 cm in height.

  • After placing each layer, the stones are manually compacted to eliminate gaps and ensure interlocking stability.

​

The model with excavation pit visible

Construction Sequence

Small stones and Rubble

Bigger Stones

Grids used for the sequence

Construction Sequence

Sketches/model imagined/made by the student

41 of 76

41

Construction Sequence

  • The foundation is then followed by a wooden a wooden plinth for the walls.

​

​

​

  • Following the completion of the wooden plinth,

wall construction begins using the traditional Kath-Kuni technique, which involves alternating courses of stone masonry and timber beams.

​

A wooden formwork is used which helps in maintaining a consistent wall width of 30 cm.

Wooden Plinth being laid on the foundation

The first layer of the wall

Kath-Kuni wall layering

Sketches/model imagined/made by the student

42 of 76

42

Construction Sequence

  • Wooden beams are laid longitudinally on both the inner and outer faces of the wall, with a 10 cm cavity between them.

​

​

​

  • The outer timber beams are made from Deodar (Cedrus deodara), known for its durability and weather resistance, while the inner beams are made from Kail (Pinus wallichiana), a softer wood suitable for interior applications.

​

​

​

  • The timber members are crafted by local carpenters and carved with dovetail joints (Maanvi), fixed every 50 cm to ensure the strength and connectivity of between the wooden beams.. The 10 cm cavity between the beams is filled with compacted loose material of stone rubble

​

​

​

  • Vertical interlocking between timber layers is achieved using wooden dowels (Kadils), which provide structural integrity without the use of nails.

Deodar (Cedrus deodara)

Kail (Pinus wallichiana)

Kadil

Dovetail joints (Maanvi)

Wall layering with different elements

Sketches traced from another source

43 of 76

43

Construction Sequence

  • Openings for windows are incorporated during wall construction, with one located along grid line 1 and the other along grid line 2. The wall is built up to a height of 1.2 m before placing a wooden sill of dimensions 50 cm in length, 30 cm in width, and 10 cm in thickness.

​

  • A window frame measuring 60 cm by 40 cm is assembled using traditional joinery and fitted directly onto the sill.

​

​

  • A wooden lintel, identical in section to the sill, is installed above the frame and integrated into the wall’s timber courses, allowing the construction to proceed smoothly around the opening. The same process is repeated for the second window.

​

​

​

​

  • For the door opening, a frame measuring 2.0 m in height and 1.0 m in Kadils)width is placed directly on the wooden plinth.. A wooden lintel of the same section as that used for the windows is fixed above the door to function as a beam, enabling efficient stacking of masonry above it. The wall construction then continues up to the final height of 2.5m.

Lintel

Sill

A Traditional wooden frame joinery used in Kath Kuni Construction

Image taken from a website

44 of 76

44

Construction Sequence

  • Once the walls are completed, the roof structure is assembled. Timber rafters and purlins, each with a cross-section of 5 cm by 5 cm, are placed at 25 cm intervals.

​

​

  • Purlins run parallel to the ridge of the roof and are supported by angled rafters extending from the ridge beam to the wall tops. Locally sourced slate tiles are installed over the purlins using traditional methods involving wooden pegs and dowels, ensuring a tight fit without synthetic fasteners.

​

​

  • The roof is completed with the placement of a ridge beam that crowns the structure and provides alignment and support for the rafters.

​

​

​

​

​

  • Internally, the surfaces of the walls and floor are plastered with a mixture of mud and cow dung, providing insulation and a breathable interior finish.

Roof Assembly on the model

Sketch of the Roof Assembly

Sketches/model imagined/made by the student

45 of 76

45

Construction Sequence

  • The semi-open area is constructed with a wooden floor composed of planks supported by a system of wooden joists and vertical stilts.

​

​

  • The joists are anchored into the Kath-Kuni walls and stilts rest on a two-tier foundation system consisting of a 15 cm × 15 cm × 10 cm wooden footing placed over a 30 cm × 30 cm × 20 cm stone base to prevent settlement into the soil.

​

​

  • Above the semi-open wooden floor, vertical posts are erected to support the extended roof. A series of seven timber brackets, each 1.0 m long and 5 cm × 5 cm in section, are fixed to the posts at 80 cm intervals.

​

​

  • These brackets support wooden purlins of 80 cm in length and 5 cm × 5 cm in section, placed at 70 cm spacing. The brackets and purlins are connected using nails and traditional joinery techniques, completing the roofing system of the semi-open area.

​

​

  • Finally the semi-open area is partially covered with a wooden railing of height of 1m to ensure safety.

Sketches/model imagined/made by the student

Wooden Roof

Wooden Post

Wooden Floor

Wooden Railing

Wooden Partition

Wooden Stilts

46 of 76

46

Model

Front View of the Model

3D view of the Model

Side View of the Model

Top view of the model

Sketches/model imagined/made by the student

47 of 76

Bibliography

  1. Abhyankar, S. (2023, April 11). Himachal Pradesh: A look at the traditional Kath Kuni architecture. Architectural Digest India. https://www.architecturaldigest.in/content/himachal-pradesh-traditional-kath-kuni-architecture/
  2. Hansda, Excy. (2020). Preserving the Cultural Landscape Heritage of Bhimakali Temple and its surroundings, Sarahan, Himachal Pradesh, India. Chitrolekha Journal on Art and Design. 2. 10.21659/cjad.23.v2n306. https://www.researchgate.net/publication/342898013_Preserving_the_Cultural_Landscape_Heritage_of_Bhimakali_Temple_and_its_surroundings_Sarahan_Himachal_Pradesh_India
  3. Climate data for Himachal Pradesh. (2024). IMD Climate Portal.

https://clims.imd.gov.in

  1. Rishiraj Das (n.d.). Standing firm: Traditional aseismic architecture of west central Himalayas.People’s Science Institute, Dehradun.
  2. Dave, B., Thakkar, J. & Shah, M. (2013) Prathaa: Kath-khuni architecture of Himachal Pradesh. 1st edn. Ahmedabad: SID Research Cell, CEPT University.
  3. Singh, S. K. (n.d.). An outline of vernacular architecture of Himachal Pradesh. Academia.edu.https://www.academia.edu/download/47194624/chapter_12.pdf
  4. Katoch, V., & Thakur, N. (n.d.). Ecotourism potential zone of Naggar Block [Figure 3]. ResearchGate. https://www.researchgate.net/figure/Ecotourism-potential-zone-of-Naggar-Block_fig3_335869615
  5. Williams, D. K. (2022, March 24). Differences between north- and south-facing slopes. Sciencing. https://www.sciencing.com/differences-between-north-southfacing-slopes-8568075.html
  6. Alamy. (n.d.). Village house South India [Stock photographs]. Alamy. https://www.alamy.com/stock-photo/village-house-south-india.html?page=10

​

48 of 76

Bibliography

10. Shah, M. (n.d.). Student work: Model exploration of Kath-khuni house by Pooja Nagaraj. Mansi Shah.

11. Pablo Evans. (2006). DSC00483.JPG [Photograph]. Flickr. https://www.flickr.com/photos/98719591@N00/164693226/

12. Bahçe Peyzaj Mimarlığı. (2024, September 28). Pinus excelsa (Ağlayan çam) [Photograph]. Instagram. https://www.instagram.com/p/DAdAIAONE2r/

13. Van der Zanden, M. (n.d.). Graduation project on the Kath-kuni architecture in India. TU Delft. https://www.tudelft.nl/en/education/study-programme-orientation/student-stories/graduation-project-on-the-kath-kuni-architecture-in-india

14.Shah, M. (n.d.). Student work: Model exploration of Kath-khuni house by Pooja Nagaraj. Mansi Shah. https://mansi-shah.weebly.com/student-work.ht

​

49 of 76

This slide contains how references are cited in every slide of this presentation. Every image has a legend/symbol on their top-right corner and that image represents all the sketches incorporated in it.

​

Images that are directly taken from websites.

Sketches/images that are directly taken from any book.

Sketches that are done by the students and are traced by looking from other references.

Sketches that are adapted from other sources, however, are not a copy of them.

Sketches that are completely imagined by the students or Images clicked by the student.

Sources/links of all images have a hyperlink under them of the website.

All Sources are available in the speaker notes in APA 7th Edition Formatting.

The Source of the Background Image in the title cover is - Source.

​

​

​

​

49

Guide for Image/Sketch References

50 of 76

Annexure

51 of 76

51

Quantity Estimations

Sketches imagined by the student

52 of 76

52

Quantity Estimations

Sketches imagined by the student

Sketches traced from another source

53 of 76

53

Quantity Estimations

Sketches imagined by the student

54 of 76

54

Quantity Estimations

Sketches imagined by the student

55 of 76

55

Quantity Estimations

Sketches imagined by the student

56 of 76

56

Arun | UCE24158

Quantity Estimations

Sketches imagined by the student

57 of 76

57

Materials research and Joineries

58 of 76

58

List of IS Codes referenced

IS Code

Key Specifications

IS 1498-1970

Soil classification (clay, sand, silt, etc.)

IS 2720 (Part 8)

Soil compaction method (Proctor test)

IS 1124-1974

Stone strength, size, and dressing tolerance

IS 3629-1986

Timber grades (I-IV) and acceptable defects

IS 401-2001

Wood preservatives and treatment methods

IS 2220-1983

Slate thickness, strength, and water resistance

IS 2629-1985

Wrought iron strength and bend test

IS 14687-1999

Deflection limits for wooden ceilings

59 of 76

59

Cedrus Deodara, ‘deodar’, Trees grow upto 5m, 3m wide trunks, resistant to insects and weather rot. Dried for months, Natural oils used for rot and moisture. Source

Pinus Excelsa, ‘Kail’, Generally of the same size, is cheaper, lighter, easier to work with, available at higher altitudes, not pest or weather resistant and might only last 10-20 years. Source

Hard stones, not affected by water, absorbs heat and insulates, loose seismic infill-seismic resistant, widely available. Source

Slate roof tiles, heavy, triangular or square tiles, overlapped without nails. High quartz content-water and frost resistant, widely available. Source

Mud Plaster, good insulation, plaster for walls and floor boards, also for making fireplace ‘chulah’. Source

Material Properties

Image taken from a website

60 of 76

60

Wall Section of Kath-Kuni house,, stone courses reduces as you go higher, non rigid construction allows flex and dissipate energy, wall storage may be built in peripheral walls. Source

Dovetail joint used to connect parallel timber planks. Source

A Traditional Mistri working on the wood. Source

A partially constructed balcony of a Kath-Kuni house model. Source

The Balcony of a Kath-Kuni house, acts as a bridge between private and public spaces, large enough for the family, perform chores (weaving in some cases), wood carving made during construction. Source

Construction Elements

Image taken from a website

61 of 76

61

Joinery Details

15 - 20 cm

20 - 25 cm

Sketches adapted from another source-not copied

62 of 76

62

Joinery and Peculiar Details

Sketches traced from another source

63 of 76

63

The vertical connection between wooden layers is provided using kadils, which are timber dowels.

​

Horizontal connections are established using the Maanwi connection, that is dovetail joint.

The Primary function of these joineries is to enhance the stability of the timber beams by preventing them from shifting out of position.

Wall Section and Its Details

Sketches adapted from another source-not copied

64 of 76

Load Bearing Structure and Case Studies

65 of 76

65

Diagram Showing Various Load Distribution in the Traditional House of Naggar

Dead Load

Weight of permanent structural components, distributed vertically downwards.

Live Load

Variable loads from occupants, furniture, and temporary storage, Also acts vertically.

Snow Load

During heavy snowfall in winter.�Acts vertically downward on the roof.

Rain Load

Acts in the angle of rain with respect to the ground.

Wind Load

Lateral load, though typically less critical.

Seismic Load

Lateral load on the foundation due to earthquake ground motion.

​

Sketches adapted from another source-not copied

66 of 76

66

The first step of construction is to dig a trench 1m deep, the dimensions in this case would be 6m*4m to maintain the 3:2 ratio.

The second step is to lay loose stone, upto the plinth level which in this case is 0.6m

The third step is to begin laying the wall starting with the first layer the wall thickness is about 45 cms.

The fourth step as the wall construction continues,while adding the second layer the main doors are added.

Case Study I: A Typical two-Storey House: Construction Sequence

For all Sketches in this Slide.

Sketches imagined by the student

67 of 76

67

The fifth step is to complete the first storey, add the windows and add the slab layer to finish the first storey.

The sixth step is to similarly complete the second storey and add the cantilever that will form the balcony.

The final step is to complete the balcony and build up the roof which is a wood framework with interlocking slate roofing tiles.

For all Sketches in this Slide.

Sketches imagined by the student

68 of 76

68

  • There are a few design choices for the case study that are specific to Naggar, for example assuming this is a two storey house, while if it was higher up in a less earthquake prone zone it might be a three storey house using kail instead of deodar as it is easier to acquire but is weaker and has a shorter lifespan in a building.
    • Being in an Earthquake prone zone requires the stronger Deodar
    • Deodar is more weather and pest-resistant than kail
  • In terms of maintenance, the wood choice of Deodar already makes it immune to certain issues like moisture or pests, but to stand for a century or so it needs to have maintenance.
    • Annually the loose stones are checked for gaps and restacked any further gaps are filled with a clay mortar.
    • To check for termites the wooden beam is tapped to check if hollow, neem oils or charring is used in affected areas
    • All the wood to wood joineries are checked and tightened with kadil if required
    • If any slate tiles are damaged they are replaced
    • Snow is removed with a wooden rake.

Source

Case Study I: A Typical two-Storey House: Design Considerations and Maintenance

69 of 76

69

Case Study II : Understanding of Construction Technique

  1. Foundation

2. Wall Construction

4. Roof

3. Upper Floors

5. Finished House

Sketches traced from another source

Images taken from a book

70 of 76

70

Primary Mind Map

  • To start making the design, a mind map was first created so that every factor was considered in the design of the shelter.

The Mind Map showing the different initial design ideas

71 of 76

Process Drawings

72 of 76

72

Ideation Plan Sheets

  • Then, different plans & sections of the shelter were made to explore the designs and try to tackle the problems that could be faced by the occupants.
  • The sleeping room is a triangle and the study nook is a separate room
  • Discarded because the space was wasted and closed was much more than open
  • The sleeping room is a hexagon and the study nook is a separate room
  • Discarded because the space was wasted and closed was much more than open

Sketches imagined by the student

73 of 76

73

Ideation Plan Sheets

  • Sleeping room was kept as small as possible
  • More favoured than other plans. Discarded because the the roof overhang was very less.

Sketches imagined by the student

74 of 76

74

Ideation Section Sheets

  • This is the section of the plan in the previous slide.

Sketches imagined by the student

75 of 76

76 of 76

Thank You