1 of 34

Nate Fox | Creative + Marketing Operations Playbook

Creative +

Marketing

Operations Playbook

2 of 34

Hey, I’m Nate

I’m a creative and marketing leader with 14+ years of experience building brands, teams, and systems that scale. I’ve led work at Google, Lyft, and Robinhood, operating at the intersection of creativity, product, and growth.

I’m known for turning ambiguity into structure. I design frameworks that help teams move faster, ship better work, and stay aligned across channels. From large-scale campaigns to scrappy experiments, I focus on ideas that earn attention and deliver results.

I bring a strategic, practical approach to creative leadership. That means clear thinking, strong collaboration, and a bias toward execution. The work you’ll see this deck reflects how I approach operational scale and help teams solve complex, organizational inefficiencies. Let’s connect.

Nate Fox | Creative + Marketing Operations Playbook

NATE FOX

Marketing | Creative | Strategy

14+ years in the creative/marketing space. Ex. Robinhood, Google, & Lyft

3 of 34

  • Briefing
    • What is a DACI?
    • DACI in an Org.
    • Briefing + Brief Template
  • Scoping + Prioritization
    • Tier Definitions
    • Creative Timing Guidelines
    • Practical Application
  • Naming Conventions
  • Kicking Off Work
  • Creative Process + Decision Making
    • Creative Process
    • Decision Making Framework
    • Creative Strategy Timeline
    • How team members can launch projects.
  • The Secret Sauce 🥫

WHAT THIS DECK COVERS

TABLE OF CONTENTS

Nate Fox | Creative + Marketing Operations Playbook

4 of 34

BRIEFING

START HERE

Nate Fox | Creative + Marketing Operations Playbook

5 of 34

Briefing +

Defining DACI

In my 10 years of experience, improper briefing is one of the key tension points among teams. No expensive PM tools, Slack Integrations, or team meetings can make up for the importance of a great brief.

Many leadership teams will blame creative departments for a lack of performance without realizing that the core issue is the lack of clarity, not a lack of ability. I can nearly guarantee that your team’s productivity, outputs, and general happiness will improve drastically if you commit to implementing the proper briefing, scoping, and prioritization frameworks.

The following slides give a great starting point. I hope these can help your teams learn and grow. 🤘

WHY IT MATTERS

Need help applying this in your company? Let’s connect!

Nate Fox | Creative + Marketing Operations Playbook

6 of 34

DACI - DEFINITIONS

D

Owner of the project, drives the key initiative forward

DRIVER

A

the final sign-off at each stage of the creative process

APPROVERS

C

influences decision with expertise and will be asked for feedback along the way

CONTRIBUTORS

I

FYI and for visibility only

INFORMED

Defining your DACI in each project helps every team know what role they play. This avoids confusion, scope creep, and misalignment. It allows creative teams to have the confidence and next steps to complete projects in an efficient way.

Need help applying this in your company? Let’s connect!

Nate Fox | Creative + Marketing Operations Playbook

7 of 34

EXAMPLE DACI IN A COMPANY

Stage

Timeframe

Driver

Approver

Contributor

Informed

Est. time

Drives key initiative forward

Makes the decision

Influences w/ expertise

Informed of final decision

Stage 1:

KPI Identified & Brief Drafted

2 business days

Project Driver

Department Lead

X-functional team

Department

Stage 2:

Brief Intake

2 business days

Creative PM

Director

X-functional team

Creative Ops Leadership

Stage 3:

Creative Kickoff

w/in 1 week of approval

Creative PM

Creative Director

X-functional team

Creative Leadership

Stage 4:

Creative Development

TBD depending on scope

Creative PM

Creative Director

X-functional team

Creative Leadership

Stage 5:

Production

TBD depending on scope

Creative PM

/Producer

Creative Director

X-functional team

Creative Leadership

Stage 6:

Launch

TBD depending on scope

Project Driver

Department/Company Leadership

X-functional team

Driver’s Lead

Nate Fox | Creative + Marketing Operations Playbook

8 of 34

STRATEGY + BRIEF

A solid brief is the foundation of great work. It’s easy to feel like you can cut corners when it comes to briefs, but that is not true. Giving your creative teams a single source of truth to review and look back on is crucial to them performing at their highest. A brief is NOT the same as a creative request form. PM softwares often allow creative request forms, which are great for smaller tasks. However, every large campaign or project your team is looking to launch should have a brief.

Here is a Brief Template to get you started: Click Here

I used to say “If it’s not worth a brief, it’s not worth our team’s time.”

  • Larger Projects (Tier 1 + 2) use a Creative Brief Template
  • Smaller asks (Tier 3 + 4) use a PM software automated form. (Wrike is the best… but that’s for another day.)

But wait… what’s a tier? That will be covered in the next section. :)

Need help applying this in your company? Let’s connect!

Nate Fox | Creative + Marketing Operations Playbook

9 of 34

SCOPING + PRIORITIZATION

Nate Fox | Creative + Marketing Operations Playbook

10 of 34

Scoping and Prioritization

Having clear indicators of Scope and Priority are instrumental in helping creative teams be most effective. It allows teams to quickly identify the most impactful work quickly and efficiently- removing distractions and limiting ambiguity.

Scoping and prioritization takes a lot of upfront work from key stakeholders and department leads, but it is worth it. The following slides cover tiering, timing, and how these items can be applied practically to 360/annual planning. 🌐

WHY IT MATTERS

Need help applying this in your company? Let’s connect!

Nate Fox | Creative + Marketing Operations Playbook

11 of 34

TIER DEFINITIONS

Company priority and major impact on a KPI

Criteria:

  • 90% of Target Audience
  • 10 markets
  • Press Interest
  • All employees
  • $$$$

Approvers:

Top-level Leadership

TIER 1

Very visible, potentially high business impact

Criteria:

  • 70% of Target Audience
  • 5-10 markets
  • Press Interest expected
  • $$$

Approvers:

Top-level Leadership

TIER 2

Lower visibility and reach

Criteria:

  • 40% of Target Audience
  • 2-5 Markets
  • Reactive Press ok
  • $$

Approvers:

Project Driver’s Manager

TIER 3

Supports business need

Criteria:

  • 20% of Target Audience
  • 2 Markets
  • Reactive Press ok
  • $

Approvers:

Project Driver

TIER 4

Need help applying this in your company? Let’s connect!

Nate Fox | Creative + Marketing Operations Playbook

12 of 34

CREATIVE TIMING GUIDELINES

Important Note: Timeline for Creative Development starts once creative has been kicked off

Project

Example

Strategic Development

(not added to total)*

Creative Development

Approvals

Production

Total

Tier 1

2 - 4 Weeks

4 - 6 weeks

1 - 3 weeks

1 - 3 weeks

4 - 12 weeks

Tier 2

1 -2 Weeks

2 - 5 weeks

1 - 3 weeks

1 - 3 weeks

4 - 12 weeks

Tier 3

0-1 week

1- 2 weeks

1- 2 weeks

< 1 week

2 - 4 weeks

Tier 4

N/A

< 1 week

< 1 week

< 1 week

1 - 2 weeks

Need help applying this in your company? Let’s connect!

Nate Fox | Creative + Marketing Operations Playbook

13 of 34

Practical Application:

Department OKRs/KPIs

(have these at the top so your team is always reminded)

T1

T2

T1

T2

T3

T3

T3

T3

T4

T4

T4

T4

T4

T4

T4

T4

T2

T2

T3

T3

T3

T3

T4

T4

T4

T4

T4

T4

T4

T4

Q1

Q2

Q3

Q4

Need help applying this in your company? Let’s connect!

Nate Fox | Creative + Marketing Operations Playbook

14 of 34

NAMING CONVENTION

Nate Fox | Creative + Marketing Operations Playbook

15 of 34

Naming Conventions

Have you ever wasted countless hours looking for old files? Nothing bothers me more than wasted time looking for things that should be easily accessible.

Many teams look to DAMs and other solutions, which are all great. However- they can be very pricey. There are ways that teams (especially on small budgets) can save countless hours by simply having a proper naming convention in place.

The next slides cover a simple naming convention and show how to practically apply it to your flow. 🌊

WHY IT MATTERS

Need help applying this in your company? Let’s connect!

Nate Fox | Creative + Marketing Operations Playbook

16 of 34

Easy-to-use Folder Naming Structure

Year+Team_ProjectNumber_Tier_NameofProject

*year + team, #, tier, Details

Great for reporting and knowing scale of projects. Justifies new hires

Establishes year and team to help with tracking and organization

23BRAND_001_T4_Culture_Blog_Header

Helps keep track of how many projects and gives idea of when a project was completed

Recommend this being 5 words or less. Give enough detail to know what it is without going too granular

Need help applying this in your company? Let’s connect!

Nate Fox | Creative + Marketing Operations Playbook

17 of 34

Folder Contents

Need help applying this in your company? Let’s connect!

Nate Fox | Creative + Marketing Operations Playbook

18 of 34

KICKING OFF WORK

Nate Fox | Creative + Marketing Operations Playbook

19 of 34

Kicking Off Work

Everyone rushes to the Kick-off. There is something about that phrase that gets teams jazzed. BUT- premature kick-offs lead to wasted hours, undefined priorities, and a lot of swirl. All things that nobody wants in their creative teams.

The next slide covers a Creative KO process. Use this to help explain to your C-Suite why their shiny new idea they’ve had since lunch can’t be kicked-off before Friday. 🙃

WHY IT MATTERS

Need help applying this in your company? Let’s connect!

Nate Fox | Creative + Marketing Operations Playbook

20 of 34

KICKING OFF

WORK

SCOPING + PRIORITIZATION + BRIEFING

CREATIVE INTAKE / ASSESSMENT / APPROVAL

OUTSOURCE

INTERNAL

CREATIVE RECOMMENDATION

Recommendations are made based on:

-scope of work

-expertise/level of specificity needed

to execute on creative

-internal creative bandwidth

-budget

CREATIVE KICKOFF

Need help applying this in your company? Let’s connect!

Nate Fox | Creative + Marketing Operations Playbook

21 of 34

CREATIVE PROCESS AND DECISION MAKING

Nate Fox | Creative + Marketing Operations Playbook

22 of 34

I can’t tell you how many times I’ve had to describe the creative process to key stakeholders… in the same day. I love zeal- but re-explaining things can actually waste valuable time and energy. So, instead of complain about it… I made simple graphs to help internal and external teams understand all that goes into every single project.

These next few slides are a great visualization for those who don’t fully understand the creative process. It allows others to grasp the full flow and (hopefully) understand why things aren’t as fast as TikTok and all the new AI influencers make them seem.

Adding method to the madness? Now that’s true magic. 🪄

Creative Process + Decision Making

WHY IT MATTERS

Need help applying this in your company? Let’s connect!

Nate Fox | Creative + Marketing Operations Playbook

23 of 34

CREATIVE PROCESS

TIER 1+2 PROJECTS

Team OKRs

GTM BRIEF

CREATIVE BRIEF

CREATIVE DECISION

REVIEW 1

REVIEW 2

BRAND, COMMS, LEGAL APPROVAL

MARKETING PROJECT BRIEFS

CREATIVE REVIEW

PUBLISH & CATALOGUE

DEBRIEF

CREATIVE KICKOFF

PLANNING + INTAKE

STAFFING

CREATIVE PRODUCTION

PUBLISH + DEBRIEF

LIKELY TO INVOLVE INTERNAL AND EXTERNAL CREATIVE RESOURCES

Driver: Project owner

Approver: Head Marketing

Contributors: Brand, comms, legal, Xfunctional teams

Informed: Driver manager, Xfunctional teams

Driver: CPM

Approver: Creative Director

Contributors: Project owner

Informed: Xfunctional teams, Head of Marketing

Driver: CPM

Approver: Head of Marketing

Contributors: Creatives, project owner, Xfunctional teams

Informed: Xfunctional teams

Driver: Project owner

Approver: ^

Contributors: ^

Informed: Xfunctional teams

Nate Fox | Creative + Marketing Operations Playbook

24 of 34

CREATIVE PROCESS

TIER 3+4 PROJECTS

Team OKRs

Marketing Project Brief

Creative Decision

Review

Round 2

(If needed)

Comms, Legal Approval

Creative Review

Publish & Catalogue

Debrief

Creative Kickoff

PLANNING + INTAKE

APPROVALS

CREATIVE PRODUCTION

PUBLISH

Driver: Project owner

Approver: Driver manager

Contributors: Brand, comms, legal, Xfunctional teams

Informed: Driver manager, Xfunctional teams, Head of Marketing (for Tier 2)

Driver: CPM

Approver: Creative

Contributors: Project owner

Informed: Xfunctional teams

Driver: Project owner

Approver: Project owner

Contributors: Creatives, Xfunctional teams

Informed: Xfunctional teams

Driver: Project owner

Approver: See above

Contributors: See above

Informed: Xfunctional teams

Nate Fox | Creative + Marketing Operations Playbook

25 of 34

Creative Decision Making Framework

PROJECT CATEGORIES

____ Team�Drives conversions

____ Team �Drives demand

____ Team�Drives awareness

Team

Product marketing, Growth

Demand generation

Brand & content

Target audience

Determined by team

Determined by team

Determined by team

Project manager

CPM

Project drivers

Project drivers

Creative team

Majority of assets to be created by in-house design team or designated agency

50/50 split between in-house and external.

Majority of assets to be created by external creative bench (hourly designers). Style guides and net new templates created in house.

Content type

Product-related content - in house

Email & ad creative - in house

New templates - in house

Videos - In house/approved vendors

New email + ad templates, new photography - in house

Email + ad production - external

Videos - TBD

Templates - in house as appropriate

Pitch decks, webinars, sales enablement one pagers; case studies; white papers; reports; eBooks; videos - external

Nate Fox | Creative + Marketing Operations Playbook

26 of 34

Internal Creative Strategy Process

Timing is typically 1-3 weeks from intake through Build/QA

A/B Test + Share Results

Tests run from 1 - 4 weeks to gain enough data to share and see if results are stat sig

Intake

Stakeholders submit project request form which is automatically assigned to Project Manager

Creative KO

Stakeholder sets up KO and creative officially begins

Build / QA

Approved files handed off to build, QA and ship

Creative Concepting + Reviews

Internal team, Stakeholders, Legal

Quarterly Planning

Two weeks before EOQ stakeholders submit approved plans in scope tracker

Creative resources + timing confirmed

Project Managers assign team and lock in schedules

Need help applying this in your company? Let’s connect!

Nate Fox | Creative + Marketing Operations Playbook

27 of 34

TIER 1+2 PROJECTS

Stage

01

  1. Schedule in-person review with Manager, then Head of Dept. Determine DACI / executive approvals. Approve brief with Brand, Comms, Legal.
  2. Complete Master Creative Brief. Secure approval from Driver’s Manager in a quick sync if realignment is needed; Otherwise, secure approval over email, then present brief to Creative.

PLANNING AND INTAKE

HOW CAN DRIVERS LAUNCH A T1+T2 PROJECT?

Stage

02

STAFFING

  • Schedule Creative Decision: Meet with Creative team and CPM to determine internal and external staffing; Document evergreen decisions and involve Head of Dept. if conflict,
  • Complete Marketing Project Briefs, all linked to Master Creative Brief.
  • Submit PM Software Request. Creative project manager assigns projects.

Stage

03

  • Schedule Kickoff in person with copy AND creative, provide necessary direction/resources.
  • Schedule Round 1 Reviews in person with copy AND creative, consolidate feedback.
  • Schedule Round 2 Reviews as needed, approve w/ Driver Manager, then Head of Ent Dept.
  • Attend Creative Review, to which CPM/Driver adds approved creative. Lead modifications.

CREATIVE PRODUCTION

Stage

04

PUBLISH + DEBRIEF

  • Secure Brand approval with executives identified in Stage 1.
  • Secure Comms, then Legal Approval.
  • Save and Catalogue content in Agency Drive.
  • Conduct Debrief with cross-functional parties. Provide post-launch insights to team.

28 of 34

TIER 3+4 PROJECTS

Stage

01

  • Schedule in-person review with Manager. Confirm DACI, scope. Approve brief with Brand, Comms, Legal if needed.
  • Finalize Project Strategy. Secure approval from Manager in a quick sync if realignment is needed; Otherwise, secure approval over email.

PLANNING AND INTAKE

Stage

02

STAFFING

  • Submit PM Software Request. Project owner confirm production timeline works for external creatives.
  • Assign. CPM will assign projects and manage production, in the case of templates being created in-house.

Stage

03

  • Schedule Kickoff in person with copy AND creative, provide necessary direction/resources.
  • Schedule Review in person with copy AND creative, consolidate feedback, share with necessary parties as needed, involve Manager if questions. Driver approves.
  • Attend Creative Review, to which Driver adds approved creative, leads modifications.

CREATIVE PRODUCTION

Stage

04

PUBLISH + DEBRIEF

  • Secure Brand, Comms, Legal Approvals.
  • Save and Catalogue content in Drive.
  • Schedule Debrief. Provide post-launch insights to cross-functional teams.

HOW CAN DRIVERS LAUNCH A T3+T4 PROJECT?

29 of 34

THE SECRET�SAUCE

Nate Fox | Creative + Marketing Operations Playbook

30 of 34

Process is cool. Tools are cool. AI is cool. But, nothing happens without having the right team.

While these resources are meant to help you add some method to the creative madness, it’s crucial to remember that you need someone to actually put these plans and processes into actions. Having a skilled and dedicated Creative Producer/PM could be the key differentiator in bringing your creative and marketing outputs from good to great. 🤩

The Right

Team Members

WHY IT MATTERS

Need help applying this in your company? Let’s connect!

Nate Fox | Creative + Marketing Operations Playbook

31 of 34

Remember Me?

I’d love to help your teams scale. I have experience in marketing, creative production, operations, strategy, design, creative direction, team building, and starting side businesses which have grown to millions of users/year at a global scale. (And all organic growth)

I have an extensive network of some of the highest-quality creatives in the biz. So regardless- let’s connect on LinkedIn. 🤘

View Portfolio

Nate Fox | Creative + Marketing Operations Playbook

NATE FOX

Marketing | Creative | Strategy

14+ years in the creative/marketing space. Ex. Robinhood, Google, & Lyft

32 of 34

Thank You .

Nate Fox | Creative + Marketing Operations Playbook

Need help applying this in your company? Let’s connect!

33 of 34

Appendix

Nate Fox | Creative Operations Playbook

34 of 34

DETAILED CREATIVE PROCESS

C

MARKETING STRATEGY

MARKETING/

CREATIVE BRIEF

CREATIVE KO

CREATIVE DEVELOPMENT +

PRODUCTION

REVIEW / APPROVAL

BUILD + QA

LAUNCH

D

C

C

C

D

D

D

Driver

A

Approver

C

Consulted (Creative)

D

A

Handoff

POST LAUNCH INSIGHTS

DRIVER: to set up kickoff

CREATIVE: to invite creative team

PARTICIPANTS:

  • PMM, PM, Product Designer, Creative (copy & design)
  • (Optional: Lead engineer, Legal, Help)

C

DRIVER : owns brief approval + refining with strategist

  • Collects important resources for kickoff (learnings/data, product screenshots)
  • Manage ELT approvals

CREATIVE: review brief in PM software, provide creative workbacks, resourcing

DRIVER : owns overall cross functional project management

  • Works with main stakeholders to develop marketing strategy
  • Responsible for aligning cross functional timelines, final deliverables, and approval process
  • Responsible for wrangling all important project details prior to kickoff

DRIVER: to lead exec reviews

  • Consolidates all feedback across various stakeholders (including legal review)

CREATIVE: PM to lead stakeholder reviews and handoff

PARTICIPANTS:

  • PMM, PM, Creative, Strategist

DRIVER: to manage communication of scope changes through creative PM + stakeholders

CREATIVE: if scope changes, provide updated workback

DRIVER: to provide post launch insights

DRIVER: to manage final delivery of assets

D

Kickoff

D

D

A

A

Nate Fox | Creative Operations Playbook