Brunei case study

Module 6a

2 of 11

Location of Brunei

3 of 11

Brunei background

    • Brunei has vast reserves of petroleum and gas, which has fueled the nation’s economy for the past 85 years and more. 
    • Exploration started in 1899 with operations commencing in 1913 .
    • Production was interrupted due to WW2 – but production recovered to 15,000 barrels/day after the war.
    • Today’s average is 120,000 barrels/day.

4 of 11

Brunei background (continued)

    • Population of 420,000;
    • Brunei has the second-highest Human Development Index in Southeast Asia behind Singapore;
    • Is ranked 5th in the world by IMF according to the gross domestic product per capita;
    • IMF estimated in 2011 Brunei was one of two with a public debt at 0% of the national GDP.

5 of 11

Brunei Shell Petroleum (BSP)

    • BSP was officially accredited with the Environmental Management System ISO 14001 certification in November 2005.
    • ISO 14001 is a standard that reflects how well a company manages their environmental risks and impacts.
    • Issuance of the certificate means that BSP must strive to performed its business within the stringent environmental requirements.
    • A key demonstrator of BSP’s commitment to the Environment and Sustainable Development is the Sungai Bera Holding Basin Remediation Project.

6 of 11

Sungai Bera Holding Basin

    • The SBHB covered 6 hectares and was used to “store” OBMs, cuttings, tank bottom sludges – within three unlined basins.
    • Estimated to be some 100,000 m3 of oily sludge within basins.
    • Plus 50,000 m3 of contaminated soil (underlying & surrounding the basins).
    • The major treatment systems were mobilised from Australia – so technology can be imported.

7 of 11

Sungai Bera Holding Basin

    • Project commenced in Q3 2000 and took almost 3 years to complete.
    • First phase to recover and treat the floating product.
    • Well-point dewatering was required to facilitate sludge & soil excavation due to the shallow water-table.
    • Waste-water from dewatering runoff from the sludge/soil storage areas was collected and treated through the Wastewater Treatment Plant.

8 of 11

Sungai Bera Holding Basin

    • Oily sludges and contaminated soils were treated through Low Temperature Thermal Desorption (LTTD) Plant.
    • Oily sludge and contaminated soil blended to create a consistent feed, with a hydrocarbon content of approximately 15% and moisture content of less than 25%.

9 of 11

Sungai Bera Holding Basin

    • Some 160,000 cubic meters of contaminated material treated;
    • 70,000 barrels of recovered oil treated and delivered back to BSP;
    • Some 5,000 drums, containing hazardous material were cleaned, crushed and disposed of.
    • Project cost USD 20 million.