The Universal Smart Grid
Supervised by
Prof. Amr Magdy Abdeen
Submitted by
Andriette Essam Khalil 17p3048�Fadi Adel Mounir Aziz 17p6017�Mariam Mamdouh Kaiser 17p5034�Monica Hesham Malak 17p6010�Olivia Ayman Maher 17p5028�Yoeil Ashraf Waheeb Zakher 17p5046
Graduation Project (II) Spring 2022, ENERGY & RENEWABLE ENERGY ENGINEERING PROGRAM
SMART
Blind
Evolution
2
Universal Smart Grid
Thesis Project Name
Site Electrical Distribution
CASE STUDY
66 KV
22KV
Governmental
Distributer
Stella residence’s main distributor
2 Incomers
Bus Coupler
6 Feeders
6 Km
Governmental main transformers station
5
6
7
8
9
10
Pillar from inside
63 A
250 A
11
12
Section 2 : feeding current villa
Section 3 : feeding next villa
Section 1 : incomer from pillar
13
Site challenges
CASE STUDY
Site challenges and proposed solution
Illegal consumption of energy (government leasing)
2-3M/year
Their current procedure to prevent illegal consumption
Cables from the compound’s main meter (6 Km), 3% of total losses
Negotiations were made but there was no outcome
NO PF CORRECTION (MOTORS, PUMPS)
Capacitor banks proposal (90k)
Bad electrical infrastructure caused lack of system integrity
A system that suits that infrastructure is installed to solve the mentioned problems
15
87%
3%
10%
87%
16
Illegal consumption of energy
CASE STUDY
ILLEGAL CONSUMPTION OF ENERGY
18
System Design
Hardware
1.Pillar Only
- Limiting the inspection zone
- Cost effective
- No detailed reading
20
2.Pillar/Coffret:
21
Readings
At pillar: Meter will calculate Consumption of L1+L2+L3
At Coffret 1: Meter A will calculate Consumption of L2+L3
At Coffret 2: Meter B will calculate Consumption of L3
Advantages
Single consumption viewed
Detailed tracking
Disadvantages
Higher Cost
22
Communication
1- Converter:
2- Logic unit and data logger
3- Transmission over the internet
23
Com Module Options
EGX
Microcontroller
- Converter: EGX
- Logic & Data logging: EGX
- Transmission: Ethernet cables
- Converter: MX485
- Logic & Data logging: ESP
- Transmission: GSM
24
Communication between meters
1- RS485 Wires
CB 1 = address 3 → Coffret meter A = address 1 → Coffret meter b = Address 2
CB 2 = address 4 → Coffret meter A = address 1 → Coffret meter b = Address 2
CB 3 = address 5 → Coffret meter A = address 1 → Coffret meter b = Address 2
2- PLC “Power Line Carrier”
3- Module
�
25
Software System Design
Entries DB
Meter ID, info (Pt, Iph, In, PF, PQS, V, Hz) and timestamp
Meters DB
Classifying meter IDs to Classes
Groups DB
All identified meter Groups
Calculated KWH DB
Calculated from the installed monitoring system
Given KWH DB
Classifying meter IDs to Classes
KWH Difference DB
Difference in KWH between the given and calculated energy values.
System Health DB
PF ,PQS, Peak demand, HZ
power
Tampers w/box DB
Detection sensor logic is changed
Tampers w/PG DB
Logging Iph and In calculations.
Tampers w/module DB
MC is disconnected
26
Alpha
Prototype
28
29
Initial prototype
Written with rust. The prototype is simple representation of logging actual consumption (Entry, meter, group and Calc. kwh Databases included)
30
Beta-1 phase in stella compound
“Beta 1-phase” Target
Test each component if suitable on the site
The accuracy and efficiency of the system communication
Verify system’s operation and to detect any deficiencies
32
The implemented circuit diagram
Villa 2
Villa 1
33
Pillar only implementation circuit:
34
34
Pillar/Coffret implementation circuit:
35
35
Installation Results��
Pillar/ coffret gave out successful readings:
Pillar meter readings:
V1 = 207.4 V
V2 = 206.5 V
V3 = 208.2 V
V avg = 207.4 V
I1 =3.561 A
I2 = 3.375 A
I3 = 3.442 A
I avg = 3.459 A
P tot = 2.148 W
Q tot = -110.6 VAR
S tot = 2.152 VA
E tot = 2.1 KWH
V1 = 207.6 V,
V2 = 207.9 V
V3 = 206.8 V
V avg = 207.4 V
I1 = 1.732 A
I2 = 1.673 A
I3 = 1.652 A
I avg = 1.681 A
P tot = 1.048 KW
Q tot = -40.45 VAR
S tot = 1.049 KVA
E tot = 0.4 KWH
P.F = 0.999
36
Data Readings for Pillar/Coffret
Coffret readings:
V1 = 207.6 V,
V2 = 207.9 V
V3 = 206.8 V
V avg = 207.4 V
I1 = 1.732 A
I2 = 1.673 A
I3 = 1.652 A
I avg = 1.681 A
P tot = 1.048 KW
Q tot = -40.45 VAR
S tot = 1.049 KVA
E tot = 0.4 KWH
P.F = 1.00
37
The illegal consumption trial
Villa 1
Villa 2
38
Pillar/coffret readings
Pillar/coffret | | |
| Etot - KWH/day | Cost - EGP |
pillar | 51.5 | 59.225 |
Coffret – villa “2” | 25.2 | 29.325 |
Villa “1” | | 29.9 |
Pillar/coffret | | |
| Etot - KWH/day | Cost - EGP |
pillar | 51.5 | 59.225 |
Coffret – villa “2” | 13.58 | 15.617 |
Villa “1” | | 43.608 |
Before illegal consumption
After illegal consumption
59.225-15.617
59.225-29.325
39
Beta 1 �“To be continued”
Pillar Only
The module will be placed on the pillar meter
The result: the server receives the total of the 2 villas
Pillar/Coffret
Another module will be added at the coffret meter
The result: the server receives detailed readings about each villa
41
- All tampers will be detected
- System tracking
- System security
42
Moving towards smart grid
Moving towards smart grid
Illegal Consumption Detection System
--
-Economical P.F correction
- Fixed cost reduction
44
Moving towards smart grid
Ex: water desalination , sewage treatment plants , water lifting stations.
45
System design of smart grid
Beta 1
Beta 2
Using O/P data for manipulation & Visualization
Components’ life time
Overtime problems ( GSM + readings arrival)
Illegal Consumption Detection
Readings
47
System design of smart grid
Starting with one unit (meter & module)
To test system coherence and reliability
48
Site implementation
SG implementation will be in
Service areas
Residential areas
50
Residential loads
SG detecting illegal electrical consumption
2M-3M EGP/year from the 400 occupied units
7.5M EGP/year from the 1500 occupied units
51
Strategy of residential implementation
400 units( occupied units )
Pillar only
pillar/coffret
1500 units
Pillar only
pillar/coffret
52
2 or 3 villas
53
Service areas :
54
CT
CT
CT
55
Software implementation
Software implementation over 400 units
If we want to expand from 400 to 1500 units
56
Data Science
Data science
Data gathering
The data is gathered from all the installed meters
Data manipulation
These data will then be manipulated to get V,I,P,E….ETC of each unit.
Data visualization
The manipulated data will then be visualized into graphs and charts to be easily assimilated by the user.
58
59
60
Financial goals
FIXED COST
Hardware
(total = 4,195 EGP)
Smart meter (Acti-9iEM3000 )3,000 EGP
Communication module
ESP
Modbus converter
Protection Box
Embedded software system
Web-based software system
Design
Backend
Frontend
Installation
20,000 to 132,000 EGP CASES
Total software: 260,000 EGP
62
RUNNING COST
Maintenance service = 16,000 EGP
(not including any hardware replacements)
63
Total cost 400 unit
PILLAR
Hardware = 969,045 EGP
Software = 260,000 EGP
Installation = 20,000 EGP
PILLAR / COFFRET
Hardware = 1,808,045 EGP
Software = 260,000 EGP
Installation = 37,350 EGP
<2M-3M EGP
Total 1,249,045 EGP
Total 2,105,395 EGP
64
Total cost 1500 unit
PILLAR
Hardware = 3,276,295 EGP
Software = 260,000 EGP
Installation = 67,700 EGP
PILLAR / COFFRET
Hardware = 6,422,545 EGP
Software = 260,000 EGP
Installation = 132,600 EGP
<7.5M-10M EGP
Total 6,825,145
Total 3,604,000 EGP
65
BMC
67
Illegal Energy Consumption
Smart Grid
68
Stella Visit
Major Problem
Major Solution
“SMART”
Future
69
Thank You