1 of 70

The Universal Smart Grid

Supervised by

Prof. Amr Magdy Abdeen

Submitted by

Andriette Essam Khalil           17p3048�Fadi Adel Mounir Aziz            17p6017�Mariam Mamdouh Kaiser       17p5034�Monica Hesham Malak           17p6010�Olivia Ayman Maher               17p5028�Yoeil Ashraf Waheeb Zakher  17p5046

Graduation Project (II) Spring 2022, ENERGY & RENEWABLE ENERGY ENGINEERING PROGRAM

2 of 70

SMART

Blind

Evolution

2

3 of 70

Universal Smart Grid

Thesis Project Name

4 of 70

Site Electrical Distribution

CASE STUDY

5 of 70

66 KV

22KV

Governmental

Distributer

Stella residence’s main distributor

2 Incomers

Bus Coupler

6 Feeders

6 Km

Governmental main transformers station

5

6 of 70

6

7 of 70

7

8 of 70

8

9 of 70

9

10 of 70

10

11 of 70

Pillar from inside

63 A

250 A

11

12 of 70

12

13 of 70

Section 2 : feeding current villa

Section 3 : feeding next villa

Section 1 : incomer from pillar

13

14 of 70

Site challenges

CASE STUDY

15 of 70

Site challenges and proposed solution

Illegal consumption of energy (government leasing)

2-3M/year

Their current procedure to prevent illegal consumption

Cables from the compound’s main meter (6 Km), 3% of total losses

Negotiations were made but there was no outcome

NO PF CORRECTION (MOTORS, PUMPS)

Capacitor banks proposal (90k)

Bad electrical infrastructure caused lack of system integrity

A system that suits that infrastructure is installed to solve the mentioned problems

15

16 of 70

87%

3%

10%

87%

16

17 of 70

Illegal consumption of energy

CASE STUDY

18 of 70

ILLEGAL CONSUMPTION OF ENERGY

​

​

  • Neutral disturbance

​

  • Meter tampering

​

  • Bypassing meters

​

​

​

​

​

​

​

​

​

18

19 of 70

System Design

20 of 70

Hardware

1.Pillar Only

​

  • Meter reading = L1+L2+L3

​

  • Advantages:

- Limiting the inspection zone

- Cost effective

​

  • Disadvantage:

- No detailed reading

20

21 of 70

2.Pillar/Coffret:

21

22 of 70

Readings

At pillar: Meter will calculate Consumption of L1+L2+L3

At Coffret 1: Meter A will calculate Consumption of L2+L3

At Coffret 2: Meter B will calculate Consumption of L3

Advantages

Single consumption viewed

Detailed tracking

Disadvantages

Higher Cost

22

23 of 70

Communication

1- Converter:

  • The meter output is modbus RS485
  • RS485 must be converted to TCP/IP or serial using the converter

​

2- Logic unit and data logger

  • Gather the data inputs
  • Log them for transmission

​

3- Transmission over the internet

  • The data logged will be sent to a server to be furtherly used

​

23

24 of 70

Com Module Options

EGX

Microcontroller

- Converter: EGX

- Logic & Data logging: EGX

- Transmission: Ethernet cables

- Converter: MX485

- Logic & Data logging: ESP

- Transmission: GSM

24

25 of 70

Communication between meters

1- RS485 Wires

  • Uses Modbus cables to gather the data to the main module at the pillar
  • Meter addressing: using Modscan

CB 1 = address 3 → Coffret meter A = address 1 → Coffret meter b = Address 2

CB 2 = address 4 → Coffret meter A = address 1 → Coffret meter b = Address 2

CB 3 = address 5 → Coffret meter A = address 1 → Coffret meter b = Address 2

​

2- PLC “Power Line Carrier”

  • Uses the already existing electrical cables to transfer the data to the main module at the pillar

​

3- Module

  • Each meter has its own module and address

�

​

25

26 of 70

Software System Design

Entries DB

Meter ID, info (Pt, Iph, In, PF, PQS, V, Hz) and timestamp

Meters DB

Classifying meter IDs to Classes

Groups DB

All identified meter Groups

Calculated KWH DB

Calculated from the installed monitoring system

Given KWH DB

Classifying meter IDs to Classes

KWH Difference DB

Difference in KWH between the given and calculated energy values.

System Health DB

PF ,PQS, Peak demand, HZ

power

Tampers w/box DB

Detection sensor logic is changed

Tampers w/PG DB

Logging Iph and In calculations.

Tampers w/module DB

MC is disconnected

26

27 of 70

Alpha

28 of 70

Prototype

28

29 of 70

29

30 of 70

Initial prototype

Written with rust. The prototype is simple representation of logging actual consumption (Entry, meter, group and Calc. kwh Databases included)

30

31 of 70

Beta-1 phase in stella compound

32 of 70

“Beta 1-phase” Target

Test each component if suitable on the site

The accuracy and efficiency of the system communication

Verify system’s operation and to detect any deficiencies

32

33 of 70

The implemented circuit diagram

  • Loads were implemented in 2 villas
  • The first meter was installed at one circuit breaker at the pillar
  • The second meter was installed at the outgoing of the coffret of the first villa

​

​

Villa 2

Villa 1

33

34 of 70

Pillar only implementation circuit:

34

34

35 of 70

Pillar/Coffret implementation circuit:

35

35

36 of 70

 Installation Results��

Pillar/ coffret gave out successful readings:

Pillar meter readings:

​

V1 = 207.4 V

V2 = 206.5 V

V3 = 208.2 V

V avg = 207.4 V

I1 =3.561 A

I2 = 3.375 A

I3 = 3.442 A

I avg = 3.459 A

P tot = 2.148 W

Q tot = -110.6 VAR

S tot = 2.152 VA

E tot = 2.1 KWH

V1 = 207.6 V,

V2 = 207.9 V

V3 = 206.8 V

V avg = 207.4 V

I1 = 1.732 A

I2 = 1.673 A

I3 = 1.652 A

I avg = 1.681 A

P tot = 1.048 KW

Q tot = -40.45 VAR

S tot = 1.049 KVA

E tot = 0.4 KWH

P.F = 0.999

36

37 of 70

Data Readings for Pillar/Coffret

Coffret readings:

​

​

V1 = 207.6 V,

V2 = 207.9 V

V3 = 206.8 V

V avg = 207.4 V

I1 = 1.732 A

I2 = 1.673 A

I3 = 1.652 A

I avg = 1.681 A

P tot = 1.048 KW

Q tot = -40.45 VAR

S tot = 1.049 KVA

E tot = 0.4 KWH

P.F = 1.00

37

38 of 70

The illegal consumption trial

​

  • Pillar /coffret The illegal consumption trial was done through bypassing our implemented meter at the coffret connected to villa 1 output (that gives out villa 2 readings)

​

Villa 1

Villa 2

38

39 of 70

Pillar/coffret readings

Pillar/coffret

​

​

​

​

Etot - KWH/day

Cost - EGP

pillar

51.5

59.225

Coffret – villa “2”

25.2

29.325

Villa “1”

​

29.9

Pillar/coffret

​

​

​

​

Etot - KWH/day

Cost - EGP

pillar

51.5

59.225

Coffret – villa “2”

13.58

15.617

Villa “1”

​

43.608

Before illegal consumption

After illegal consumption

59.225-15.617

59.225-29.325

39

40 of 70

Beta 1 �“To be continued”

41 of 70

Pillar Only

The module will be placed on the pillar meter

The result: the server receives the total of the 2 villas

Pillar/Coffret

Another module will be added at the coffret meter

The result: the server receives detailed readings about each villa

41

42 of 70

  • The data collected will then be used as it will be discussed in the following slides

​

  • Expected outcome:

- All tampers will be detected

- System tracking

- System security

42

43 of 70

Moving towards smart grid

44 of 70

Moving towards smart grid

  • Beta 1 outcomes
  • Expendable system (solving more problems)

Illegal Consumption Detection System

--

-Economical P.F correction

- Fixed cost reduction

44

45 of 70

Moving towards smart grid

  • Adding service areas to the residential loads

Ex: water desalination , sewage treatment plants , water lifting stations.

​

45

46 of 70

System design of smart grid

47 of 70

Beta 1

Beta 2

Using O/P data for manipulation & Visualization

Components’ life time

Overtime problems ( GSM + readings arrival)

Illegal Consumption Detection

Readings

47

48 of 70

System design of smart grid

Starting with one unit (meter & module)

​

    • 1 pillar (street lighting)
    • 1 breaker (service areas)

To test system coherence and reliability

48

49 of 70

Site implementation

50 of 70

SG implementation will be in

Service areas

Residential areas

50

51 of 70

Residential loads

​

  • 400 occupied units from 1500 units

SG detecting illegal electrical consumption

2M-3M EGP/year from the 400 occupied units

7.5M EGP/year from the 1500 occupied units

51

52 of 70

Strategy of residential implementation

400 units( occupied units )

Pillar only

pillar/coffret

1500 units

Pillar only

pillar/coffret

52

53 of 70

2 or 3 villas

53

54 of 70

​

Service areas :

  • 22 street lightings
  • 9 service stations

​

54

55 of 70

CT

CT

CT

55

56 of 70

Software implementation

Software implementation over 400 units

  • Data collected from our modules will be stored by the server for building future machine learning

​

  • Machine learning will be updated each 6 months

​

If we want to expand from 400 to 1500 units

​

  • Giving the admin access to the compound electrical operator to add new meters to the current database

​

56

57 of 70

Data Science

58 of 70

Data science

Data gathering

The data is gathered from all the installed meters

Data manipulation

These data will then be manipulated to get V,I,P,E….ETC of each unit.

Data visualization

The manipulated data will then be visualized into graphs and charts to be easily assimilated by the user.

58

59 of 70

59

60 of 70

60

61 of 70

Financial goals

62 of 70

FIXED COST

Hardware

(total = 4,195 EGP)

Smart meter (Acti-9iEM3000 )3,000 EGP

Communication module

ESP

Modbus converter

Protection Box

Embedded software system

Web-based software system

Design

Backend

Frontend

Installation

20,000 to 132,000 EGP CASES

Total software: 260,000 EGP

62

63 of 70

RUNNING COST

Maintenance service = 16,000 EGP

(not including any hardware replacements)

63

64 of 70

Total cost 400 unit

PILLAR

Hardware = 969,045 EGP

Software = 260,000 EGP

Installation = 20,000 EGP

PILLAR / COFFRET

Hardware = 1,808,045 EGP

Software = 260,000 EGP

Installation = 37,350 EGP

<2M-3M EGP

Total 1,249,045 EGP

Total 2,105,395 EGP

64

65 of 70

Total cost 1500 unit

PILLAR

Hardware = 3,276,295 EGP

Software = 260,000 EGP

Installation = 67,700 EGP

PILLAR / COFFRET

Hardware = 6,422,545 EGP

Software = 260,000 EGP

Installation = 132,600 EGP

<7.5M-10M EGP

Total 6,825,145

Total 3,604,000 EGP

65

66 of 70

BMC

67 of 70

67

68 of 70

Illegal Energy Consumption

    • System design
    • Solved 87%

Smart Grid

    • Solves 100%
    • Monitor and Track
    • Take action

68

69 of 70

Stella Visit

Major Problem

    • Illegal Electricity consumption
    • System Design 🡪2 cases
    • Solving 87%

Major Solution

“SMART”

    • Solves 100%
    • Monitoring and tracking

Future

69

70 of 70

Thank You

70