SAP Production Planning & Execution (PP)

Repetitive Manufacturing

Post Processing

of ERROR Backflush

2 of 70

  1. Check Stocks (MB52)
  2. Check Production Version Backflush/Staging Location (C223)
  3. Check Planning situation in Planning Table (MF50)
  4. REM Confirmation (MFBF)
  5. Check Post Processing Report (MF47)
  6. Check Dependent Requirement created due to the Backlog of GI (MD04)
  7. Stage more Stocks for RM1 (MF60)
  8. Check Material Document (MB03) and new Stocks situation (MB52)
  9. Post Processing Individual Components (MF47)
  10. Correcting BP1 posting (MFBF)
  11. Display Data Entry Documents (MF12)

3 of 70

Staging Location is SL02 with

356pc

4 of 70

  • Check Stocks (MB52)
  • Check Production Version Backflush/Staging Location (C223)
  • Check Planning situation in Planning Table (MF50)
  • REM Confirmation (MFBF)
  • Check Post Processing Report (MF47)
  • Check Dependent Requirement created due to the Backlog of GI (MD04)
  • Stage more Stocks for RM1 (MF60)
  • Check Material Document (MB03) and new Stocks situation (MB52)
  • Post Processing Individual Components (MF47)
  • Correcting BP1 posting (MFBF)
  • Display Data Entry Documents (MF12)

5 of 70

Check the PV

L1

6 of 70

Staging (Backflush) Storage Location

SL02

for PV L1

7 of 70

  • Check Stocks (MB52)
  • Check Production Version Backflush/Staging Location (C223)
  • Check Planning situation in Planning Table (MF50)
  • REM Confirmation (MFBF)
  • Check Post Processing Report (MF47)
  • Check Dependent Requirement created due to the Backlog of GI (MD04)
  • Stage more Stocks for RM1 (MF60)
  • Check Material Document (MB03) and new Stocks situation (MB52)
  • Post Processing Individual Components (MF47)
  • Correcting BP1 posting (MFBF)
  • Display Data Entry Documents (MF12)

8 of 70

Let’s focus on this Planned Order with 500pc

Double-click

9 of 70

Planned Order

37523 with

500pc

10 of 70

Focus on this Planned Order 37523 for PV L1 for REM Confirmation

11 of 70

  • Check Stocks (MB52)
  • Check Production Version Backflush/Staging Location (C223)
  • Check Planning situation in Planning Table (MF50)
  • REM Confirmation (MFBF)
  • Check Post Processing Report (MF47)
  • Check Dependent Requirement created due to the Backlog of GI (MD04)
  • Stage more Stocks for RM1 (MF60)
  • Check Material Document (MB03) and new Stocks situation (MB52)
  • Post Processing Individual Components (MF47)
  • Correcting BP1 posting (MFBF)
  • Display Data Entry Documents (MF12)

12 of 70

Enter the Planned Order discussed in Slide 9,10

Press ENTER

13 of 70

Other data default from the Planned Order

14 of 70

the By-Product BP1 without the Storage Location will be an ISSUE

RM1 current stock 356 will be an ISSUE

15 of 70

BACK

16 of 70

SAVE to Process from the Defaults (the missing SLoc for BP1 and also insufficient stock of RM1 will be an ISSUE)

17 of 70

Both materials have ISSUES, we can select them and correct it,

but if Posted without Correction; the Materials will be Parked to the Post-Processing report (COGI)

18 of 70

19 of 70

Only GR and Activity Posting

BUT no GI

20 of 70

  • Check Stocks (MB52)
  • Check Production Version Backflush/Staging Location (C223)
  • Check Planning situation in Planning Table (MF50)
  • REM Confirmation (MFBF)
  • Check Post Processing Report (MF47)
  • Check Dependent Requirement created due to the Backlog of GI (MD04)
  • Stage more Stocks for RM1 (MF60)
  • Check Material Document (MB03) and new Stocks situation (MB52)
  • Post Processing Individual Components (MF47)
  • Correcting BP1 posting (MFBF)
  • Display Data Entry Documents (MF12)

21 of 70

Check Post Processing List

22 of 70

23 of 70

An OPTION to DELETE the RECORD (with care and approval)

24 of 70

Check the Details

25 of 70

Detail report of the Backlog

You can SAVE to Postprocessing; HOWEVER, we will not perform this as the SLOC for BP1 not even corrected and RM1 still not enough stocks in SL02)

26 of 70

  • Check Stocks (MB52)
  • Check Production Version Backflush/Staging Location (C223)
  • Check Planning situation in Planning Table (MF50)
  • REM Confirmation (MFBF)
  • Check Post Processing Report (MF47)
  • Check Dependent Requirement created due to the Backlog of GI (MD04)
  • Stage more Stocks for RM1 (MF60)
  • Check Material Document (MB03) and new Stocks situation (MB52)
  • Post Processing Individual Components (MF47)
  • Correcting BP1 posting (MFBF)
  • Display Data Entry Documents (MF12)

27 of 70

A Dependent Requirement with MRP Data Element Text “/NProc.”

28 of 70

Select the MRP Data Element Text “/NProc.” data line and

CLICK “Pegging”

29 of 70

Such a BACKLog Posting do not have any PEGGING

30 of 70

  • Check Stocks (MB52)
  • Check Production Version Backflush/Staging Location (C223)
  • Check Planning situation in Planning Table (MF50)
  • REM Confirmation (MFBF)
  • Check Post Processing Report (MF47)
  • Check Dependent Requirement created due to the Backlog of GI (MD04)
  • Stage more Stocks for RM1 (MF60)
  • Check Material Document (MB03) and new Stocks situation (MB52)
  • Post Processing Individual Components (MF47)
  • Correcting BP1 posting (MFBF)
  • Display Data Entry Documents (MF12)

31 of 70

Check missing stocks in SL02 for PV L1

32 of 70

33 of 70

34 of 70

35 of 70

Stock Determination Strategy results in this Storage Location to Replenish from

Qty missing suggested

36 of 70

Let’s stage 200pcs from

SLoc SL01 to SL02

37 of 70

38 of 70

39 of 70

Material Document Posted for the Transfer Posting

40 of 70

  • Check Stocks (MB52)
  • Check Production Version Backflush/Staging Location (C223)
  • Check Planning situation in Planning Table (MF50)
  • REM Confirmation (MFBF)
  • Check Post Processing Report (MF47)
  • Check Dependent Requirement created due to the Backlog of GI (MD04)
  • Stage more Stocks for RM1 (MF60)
  • Check Material Document (MB03) and new Stocks situation (MB52)
  • Post Processing Individual Components (MF47)
  • Correcting BP1 posting (MFBF)
  • Display Data Entry Documents (MF12)

41 of 70

42 of 70

Before the Staging

SL01 300

SL02 356

After the Staging

SL01 300 - 200 = 100

SL02 356 + 200 = 556

43 of 70

  • Check Stocks (MB52)
  • Check Production Version Backflush/Staging Location (C223)
  • Check Planning situation in Planning Table (MF50)
  • REM Confirmation (MFBF)
  • Check Post Processing Report (MF47)
  • Check Dependent Requirement created due to the Backlog of GI (MD04)
  • Stage more Stocks for RM1 (MF60)
  • Check Material Document (MB03) and new Stocks situation (MB52)
  • Post Processing Individual Components (MF47)
  • Correcting BP1 posting (MFBF)
  • Display Data Entry Documents (MF12)

44 of 70

45 of 70

we can check the Stocks of RM1

46 of 70

Current stock in SL02

47 of 70

48 of 70

Note BP1 still without a Storage Location for the GI (but change mode seems not available here)

RM1 current stock is 556 (Slide 46), so the Backlog correction should be possible now

49 of 70

SAVE

50 of 70

BP1 missing Storage Location is not Possible

51 of 70

52 of 70

DELETE BP1

53 of 70

54 of 70

BP1 Backlog deleted

55 of 70

  • Check Stocks (MB52)
  • Check Production Version Backflush/Staging Location (C223)
  • Check Planning situation in Planning Table (MF50)
  • REM Confirmation (MFBF)
  • Check Post Processing Report (MF47)
  • Check Dependent Requirement created due to the Backlog of GI (MD04)
  • Stage more Stocks for RM1 (MF60)
  • Check Material Document (MB03) and new Stocks situation (MB52)
  • Post Processing Individual Components (MF47)
  • Correcting BP1 posting (MFBF)
  • Display Data Entry Documents (MF12)

56 of 70

In MFBF

Component Backflush

57 of 70

58 of 70

REMOVE RM1

59 of 70

Enter the GR Storage Location and SAVE

BP1 is a By-Product -10 means GR

60 of 70

Material Document Posted (it says GI)

but since BP1 is a By-Product, actually GR was Posted

61 of 70

  • Check Stocks (MB52)
  • Check Production Version Backflush/Staging Location (C223)
  • Check Planning situation in Planning Table (MF50)
  • REM Confirmation (MFBF)
  • Check Post Processing Report (MF47)
  • Check Dependent Requirement created due to the Backlog of GI (MD04)
  • Stage more Stocks for RM1 (MF60)
  • Check Material Document (MB03) and new Stocks situation (MB52)
  • Post Processing Individual Components (MF47)
  • Correcting BP1 posting (MFBF)
  • Display Data Entry Documents (MF12)

62 of 70

Check Material Documents LOG

63 of 70

64 of 70

Slide 19

Original REM Confirmation with BACKLOG

(note WARNING)

65 of 70

Double-click

66 of 70

FG1 posted via REM Confirmation in MFBF

(only FG1 and the Components RM1 and BP1 not posted)

67 of 70

Slide 49

Correcting RM1 Backflush via “Post Processing Lists of Components” via MF47

68 of 70

RM1 corrected Posting via MF47

69 of 70

Slide 56-59

By-Product Re-posting via MFBF

70 of 70

Correction Posting of BP1 via MFBF