1 of 29

Team Iron

By: Dennis, Hai, and Khoa

2 of 29

Problem Statement

Room 908 at Yerba Buena High School is mainly dependent on grid produced electricity.

3 of 29

Design Statement

Reduce electrical grid dependency

4 of 29

Question

How many tons of carbon dioxide does room 908 absorb when installed with solar panels?

5 of 29

Client objectives

Project objectives

Building information modeling (BIM)

Project production management (PPM)

Integrated concurrent engineering (ICE)

6 of 29

Client objectives

Project objectives

Building information modeling (BIM)

Project production management (PPM)

Integrated concurrent engineering (ICE)

7 of 29

Scope

Function(why): Classroom Sustainability

Form(what): 3000 sq.ft.: Classroom

Behavior(how): Reduce electric dependency

8 of 29

Buildings with solar panels and skylights

Skylights

Solar Panels

9 of 29

Client objectives

Project objectives

Building information modeling (BIM)

Project production management (PPM)

Integrated concurrent engineering (ICE)

10 of 29

Organization

Functions: Project Manager, Owner and Contractor(Renaissance Builders, Sunpower)

Forms: ICE meetings( Roger, Hai, Dennis, Khoa Mr.Ochoa and Contractors)

Behavior: Modeling, support data, proper representation

11 of 29

Schedule

Solar Tubes (first)

-Renaissance Builders

-2 Months

Solar Panels (Third)

-Sun Power

-2 Months

LED Lighting(Second)

-Glo Electric

-2 weeks

Time Completion: 5 Months

12 of 29

Client objectives

Project objectives

Building information modeling (BIM)

Project production management (PPM)

Integrated concurrent engineering (ICE)

13 of 29

Process

Functions: Improving energy usage

Form:Employees, Solar Install, LED light, Skylights, Battery Charging System, Evaporative Cooler

Behavior: Reduce electrical dependency

14 of 29

15 of 29

Power

Demand

16 of 29

Power Demand

17 of 29

Solar Panels Power Output

18 of 29

Solar Panels Required

19 of 29

20 of 29

21 of 29

Client objectives

Project objectives

Building information modeling (BIM)

Project production management (PPM)

Integrated concurrent engineering (ICE)

22 of 29

Project Metrics

23 of 29

Client objectives

Project objectives

Building information modeling (BIM)

Project production management (PPM)

Integrated concurrent engineering (ICE)

24 of 29

Social Justice

  • Safety reduces variability in a construction site by reducing delays in a schedule
  • Occupational Safety and Health Act: enforce health and safety standards
  • Solar and Skylight Installers
    • Safety Net System
    • Cranes, Conveyors

25 of 29

Social Justice

  • Workers are exploited and lose money

  • Fair Labor Standards Act: Enforce standard wages and overtime pay

26 of 29

Energy Justice

  • Why: Water Waste, inequality in education
  • Standards:
    • Energy Efficiency Resource Standard : Achieve annual energy savings
    • Renewable Portfolio Standard: at least 25% renewable by 2025
    • Affordable Solar Program: installation incentives to low income families

27 of 29

Challenges

Khoa and Hai did not have prior experience with 3D software.

28 of 29

Thank you for listening!!!

29 of 29