1 of 19

Essex Elementary School Project

Community Meeting No. 07

June 4, 2026 @ 6:00 PM

2 of 19

Community Outreach

2

Sustainability Working Group

7

Community Meetings

7

Communications Working Group

2

Site Logistics Working Group

22

School Building Committee

(SBC)

Meetings

https://www.mersd.org/building-committee

2

Educational Plan Validation

2

School Board Meetings

6

School Tours

3

Educational Programming Workshops

3

MEP Working Group

2

Site, Safety & Security Working Group

1

Community Gallery Walk

3 of 19

3

6/4/2026

Site Plan

Considerations:

Minimize impacts to wetlands areas

Utilize slope to provide multiple points of building entry in close proximity

Western Ave is primary entry for parent and bus circulation

Story Street accesses dedicated Pre-K Entry

Outdoor play areas and fields adjacent to Community Wing

Student pedestrian circulation separated from vehicular access and away from road

4 of 19

4

6/4/2026

Site Context

5 of 19

5

6/4/2026

Main Level Plan

Considerations:

“The Landing” centralized vertical spine provides connectivity between all three levels

Discrete Community and Academic Wings facilitate after-hour use

Learning Commons (Media, World Language & Art) in close proximity to Music

Learning Neighborhoods organized around an L-Shaped breakout with integrated MTSS and SPED

Three-grade cluster aligns SPED students with their peers

6 of 19

6

6/4/2026

Lower Level Plan

Considerations:

“The Landing” centralized vertical spine provides connectivity between all three levels

Story Street accesses dedicated Pre-K Entry

Pre-K classrooms have direct access to outdoor play

Footprint works with existing slope to minimize cut and fill

7 of 19

7

6/4/2026

Upper Level Plan

Considerations:

“The Landing” centralized vertical spine provides connectivity between all three levels

Learning Neighborhoods organized around an L-Shaped breakout with integrated MTSS and SPED

Three-grade cluster aligns SPED students with their peers

8 of 19

8

6/4/2026

Construction Phasing Plan

9 of 19

9

6/4/2026

Sustainable Design: Project Requirements and Recommendations 

10 of 19

10

6/4/2026

Inspiration – Cultural Heritage of Essex 

11 of 19

11

6/4/2026

Inspiration Imagery and Color Theory

12 of 19

12

6/4/2026

Inspiration Imagery and Color Theory

13 of 19

13

6/4/2026

Inspiration Imagery and Color Theory

14 of 19

14

6/4/2026

Main Entry Examples

15 of 19

Schedule Update

MAY

5/12 – SBC Meeting

5/26 – SBC Meeting

JUNE

6/4 – Community Meeting #6

6/9 – SBC Meeting

6/23 – SBC Meeting

JULY

7/14 – SBC Meeting

7/28 – SBC Meeting

AUGUST

8/11 – SBC Meeting

8/25 – Community Meeting #7

8/25 - SBC Meeting

SEPTEMBER

9/8 – SBC Meeting

9/22 – SBC Meeting

OCTOBER

10/13 – SBC Meeting

10/27 – SBC Meeting

10/29 – Community Meeting #8

NOVEMBER

11/10 – SBC Meeting

11/24 – SBC Meeting

16 of 19

Working Groups Schedule Update

MEP/Sustainability

Meeting #4 – June 22nd 10-11

Meeting #5 – July 13th 10-11

Site, Safety, and Security

Meeting #2 – May 29th 9-10

Meeting #3 – July 15th 8-9

Design

Meeting #2 – May 28th 3-4

Meeting #3 – June 18th 4-5

**Times are TBD

17 of 19

Q&A

18 of 19

18

6/4/2026

Project Website

19 of 19

Thank You!

Thank you!