1 of 19

​

Essex Elementary School Project

Community Meeting No. 07

June 4, 2026 @ 6:00 PM

​

2 of 19

Community Outreach

2

Sustainability Working Group

7

Community Meetings

7

Communications Working Group

2

Site Logistics Working Group

22

School Building Committee

(SBC)

Meetings

https://www.mersd.org/building-committee

2

Educational Plan Validation

2

School Board Meetings

6

School Tours

3

Educational Programming Workshops

3

MEP Working Group

2

Site, Safety & Security Working Group

1

Community Gallery Walk

3 of 19

3

6/4/2026

​

Site Plan

Considerations:

•Minimize impacts to wetlands areas

​

•Utilize slope to provide multiple points of building entry in close proximity

​

•Western Ave is primary entry for parent and bus circulation

​

•Story Street accesses dedicated Pre-K Entry

​

•Outdoor play areas and fields adjacent to Community Wing

​

•Student pedestrian circulation separated from vehicular access and away from road

​

4 of 19

4

6/4/2026

​

Site Context

5 of 19

5

6/4/2026

​

Main Level Plan

Considerations:

​

•“The Landing” centralized vertical spine provides connectivity between all three levels

​

•Discrete Community and Academic Wings facilitate after-hour use

​

•Learning Commons (Media, World Language & Art) in close proximity to Music

​

•Learning Neighborhoods organized around an L-Shaped breakout with integrated MTSS and SPED

​

•Three-grade cluster aligns SPED students with their peers

​

​

​

6 of 19

6

6/4/2026

​

Lower Level Plan

Considerations:

​

•“The Landing” centralized vertical spine provides connectivity between all three levels

​

•Story Street accesses dedicated Pre-K Entry

​

•Pre-K classrooms have direct access to outdoor play

​

•Footprint works with existing slope to minimize cut and fill

​

​

​

7 of 19

7

6/4/2026

​

Upper Level Plan

Considerations:

​

•“The Landing” centralized vertical spine provides connectivity between all three levels

​

•Learning Neighborhoods organized around an L-Shaped breakout with integrated MTSS and SPED

​

•Three-grade cluster aligns SPED students with their peers

​

​

8 of 19

8

6/4/2026

​

Construction Phasing Plan

9 of 19

9

6/4/2026

Sustainable Design: Project Requirements and Recommendations 

10 of 19

10

6/4/2026

Inspiration – Cultural Heritage of Essex 

11 of 19

11

6/4/2026

Inspiration Imagery and Color Theory

12 of 19

12

6/4/2026

Inspiration Imagery and Color Theory

13 of 19

13

6/4/2026

Inspiration Imagery and Color Theory

14 of 19

14

6/4/2026

Main Entry Examples

15 of 19

Schedule Update

MAY

​

5/12 – SBC Meeting

5/26 – SBC Meeting

​

​

JUNE

​

6/4 – Community Meeting #6

6/9 – SBC Meeting

6/23 – SBC Meeting

​

JULY

​

7/14 – SBC Meeting

7/28 – SBC Meeting

​

​

AUGUST

​

8/11 – SBC Meeting

8/25 – Community Meeting #7

8/25 - SBC Meeting

​

SEPTEMBER

​

9/8 – SBC Meeting

9/22 – SBC Meeting

​

​

OCTOBER

​

10/13 – SBC Meeting

10/27 – SBC Meeting

10/29 – Community Meeting #8

​

NOVEMBER

​

11/10 – SBC Meeting

11/24 – SBC Meeting

​

​

16 of 19

Working Groups Schedule Update

MEP/Sustainability

​

Meeting #4 – June 22nd 10-11

Meeting #5 – July 13th 10-11

Site, Safety, and Security

​

Meeting #2 – May 29th 9-10

Meeting #3 – July 15th 8-9

​

Design

​

Meeting #2 – May 28th 3-4

Meeting #3 – June 18th 4-5

**Times are TBD

17 of 19

Q&A

​

​

18 of 19

18

6/4/2026

Project Website

19 of 19

Thank You!

Thank you!