SAP Material Management

“Material Unknown” Contract

with item Category “M”

“Inclusion RULE”

to Generate

Material Source List

2 of 24

ME31K create a Plant specific Contract

3 of 24

Contract period 17.09.2016 to

31.12.2016

4 of 24

Item Category “M” (Material unknown)

means the Contract is valid for more than one material with same material group and price

5 of 24

All materials must be same price

All materials must have same material group

6 of 24

Material entry not required for item category “M”

7 of 24

Maintain Source List

8 of 24

Valid Period must be within the Contract period

now set as “Exclusion” rule

Material entered must be same material group 001

9 of 24

This presentation we look at “Inclusion”, so deselect it

10 of 24

Generate 5 source list

For “Inclusion” rule, so deselect it (not click)

11 of 24

Note Contract 4600000068

12 of 24

The contract is negotiated for 10,000 pc @ $10/pc

for 5 materials (via the source list inclusion method)

Meaning PO can be issued to buy any of the 5 materials within the period but total is 10,000 pc @ $10/pc

13 of 24

Source List generated for

T-T101 to T-T105

Contract and line item

14 of 24

15 of 24

Source list for all 5 material generated

16 of 24

Source determination for T-T101 picks up the Contract from the Source List

17 of 24

Source determination for T-T102 picks up the Contract from the Source List

18 of 24

Source determination for T-T102 picks up the Contract from the Source List

19 of 24

Note PR

20 of 24

21 of 24

Note all 3 material linke to one Contract line item

22 of 24

Note PO

23 of 24

Review Contract Release Statistics

24 of 24

Contract 10,000

release 2,300

Balacnce 7,700