1 of 47

Public-Private Partnerships

in the Philippines

10 June 2025 via Microsoft Teams

PPP Center

1

2 of 47

TABLE OF CONTENTS

2

01

Philippine PPP

Legal Framework

PUBLIC–PRIVATE PARTNERSHIP CENTER OF THE PHILIPPINES

02

Projects in the

Pipeline

03

Considerations for Pursuing PPPs in

the Philippines

04

PDMF

Opportunities

05

Highlighted

Projects

3 of 47

Philippine PPP Legal Framework

3

PPP Code of the Philippines (Republic Act 11966) and its Implementing Rules and Regulations (IRR)

PUBLIC–PRIVATE PARTNERSHIP CENTER OF THE PHILIPPINES

4 of 47

4

Director IV

Capacity Building and Knowledge Management Service

FEROISA FRANCISCA T. CONCORDIA

PUBLIC–PRIVATE PARTNERSHIP CENTER OF THE PHILIPPINES

5 of 47

Legal framework for PPPs

5

Implementing Agency

Previous PPP legal frameworks

Current

RA No. 7718

(BOT Law)

NEDA Joint Venture (JV) Guidelines

Local PPP Code

or JV Ordinances

Special

Charters

RA No. 11966

(PPP Code of the

Philippines)

  • National government

agencies

  • State Universities and

Colleges (SUCs)

  • Government-owned-and-

controlled corporations

(GOCCs)

  • Government corporate

entities (GCEs)

  • Government instrumentalities

with corporate powers

(GICPs)

  • Government financial

institutions (GFIs)

  • Water districts (WDs)

The PPP Code of the Philippines was signed into law on December 5,

2023 and became effective

  • Local government units

on December 23, 2023.

PUBLIC–PRIVATE PARTNERSHIP CENTER OF THE PHILIPPINES

6 of 47

PPPs in the Philippines

6

To finance, design, construct, operate, and

maintain, or any combination or variation

Infrastructure or Development Projects and Services which are typically provided by the public sector

Each party shares in the associated risks.

Investment recovery of the Private Partner is

linked to performance.

Section 4 ( rr) of the PPP Code IRR

A contractual arrangement between an Implementing Agency and a Private Partner

GOVERNMENT

PRIVATE SECTOR

PUBLIC–PRIVATE PARTNERSHIP CENTER OF THE PHILIPPINES

7 of 47

Scope and coverage of PPPs in the Philippines

7

  1. Build-Operate-Transfer (BOT) and its variants
  2. Joint Ventures (JVs) as defined in the Code and its IRR
  3. Lease agreements providing for the rehabilitation, operation, and/or maintenance, including the provision of working capital and/or improvements to, by the Private Partner of an existing land or facility owned by the government for a fixed period of time covering more than one (1) year
  4. Lease agreements, when such lease is a component of a PPP Project
  5. Operations and Maintenance (O&M) facilities
  6. Any Infrastructure or Development Project or Service

that satisfies the elements of a PPP

PPP Code SHALL COVER: PPP Code EXCLUDES the following:

  1. Infrastructure projects and services procured through RA 9184
  2. Management contracts which do not possess elements of a PPP as defined in Section 4(rr) of the IRR; excluding O&M PPP Projects
  3. Service contracts such as for coal, petroleum, and renewable energy service; and service contracts contemplated by the relevant circulars of COA and DBM
  4. Joint venture and lease agreements involving purely commercial arrangements that neither provide nor include public infrastructure or development services
  5. ODA infrastructure, unless otherwise stated in the ODA agreement
  6. divestments or dispositions
  7. corporatization
  8. incorporation of subsidiaries with private sector equity
  9. onerous donations
  10. gratuitous donations

If the infrastructure or development project and service subject of a contractual arrangement satisfies the elements of a PPP as defined in Section 4(rr) of the IRR, such shall be considered a PPP and shall therefore be covered by the PPP Code and its IRR.

PUBLIC–PRIVATE PARTNERSHIP CENTER OF THE PHILIPPINES

8 of 47

SCOPE AND COVERAGE OF PPPS IN THE PHILIPPINES

PUBLIC–PRIVATE PARTNERSHIP CENTER OF THE PHI

LIPPINES

Infrastructure or Development Projects and Services

Highways

Power generation

and distribution

Water supply, sewerage, and drainage

Government buildings, convention centers and other related facilities

Agri-fishery industrial hubs

Land transportation systems

Downstream oil and gas industry facilities, and related facilities

Educational

infrastructure

Urban redevelopment and housing

Cold chain systems or centers, and related facilities

Transport and traffic management projects

Energy efficiency and conservation

Health

infrastructure

Heritage preservation and adaptive reuse projects

Prisons and other security-related facilities

Port infrastructure

Telecommunications infrastructure

Multi-purpose water resources projects

Markets and slaughterhouses

Environmental and solid waste management

Maritime infrastructure

Information technology (IT) networks

Land reclamation

and flood control

Warehouses and

post-harvest facilities

Climate change adaptation and mitigation, disaster risk reduction and biodiversity conservation

Airports, air navigation, and related facilities

Irrigation and related facilities

Industrial and

tourism estates

Public fish ports and fishponds

Other infrastructure or development projects and services

This list in NON-EXCLUSIVE. The IA may request for a non-policy matter opinion from the PPP Center to determine whether a project is covered by the Code and IRR.

*Related facilities may include commercial spaces within the project scope.

8

9 of 47

Scope of private sector role in PPP

Integrated PPP

Design

Construction

O&M

Private sector undertakes all aspects of the project

Other forms of PPP

Private sector undertakes only certain portions of the project

Project structure

Private sector

Implementing Agency

Legend:

Normally includes transfer of the facility/development infrastructure to the IA at the end of the concession period

Design

Design

Design

Construction

O&M

Construction

O&M

Construction

Operations

Maintenance

9

PUBLIC–PRIVATE PARTNERSHIP CENTER OF THE PHILIPPINES

10 of 47

Investment recovery schemes

Revenue-based PPPs

Private Partner is allowed to

collect charges from users

Examples:

Solid waste project – tipping fees

Water project – bulk water charge Road project – toll fees

Combination of different investment recovery schemes, as approved by the AB

*For NGAs and SUCs, Availability Payments may be covered by Letter of Commitment issued by DBM. (see: National Budget Circular 564-2016)

Availability-based PPPs

IA will allocate budget or funds as payment to the Private Partner*

Examples:

School project – annual payments

by DepEd to private partner Prison project – annual payments by BuCor to private partner

Other investment

recovery schemes

Private Partner may be allowed to explore commercial potentials of a contiguous asset/bundled asset to improve the overall financial viability of the project

Examples:

Government Building project – grant of commercial development rights

Rail Project – grant of advertising rights on the trains and stations

A portion or percentage of a reclaimed land as an investment recovery scheme is subject to fair valuation.

10

PUBLIC–PRIVATE PARTNERSHIP CENTER OF THE PHILIPPINES

11 of 47

Modes of procurement

  • Projects identified by an IA as part

of its List of PPP Projects

  • Projects subjected to public bidding
  • Project proposal made by a Private Proponent to undertake a PPP project pursuant to the PPP Code
  • Projects subjected to comparative challenge

Interested Private Proponents may submit their USP to the PPP Center through the USP Submission Portal. Any other form of submission shall not be accepted and shall not be considered for completeness check.

Solicited PPP Project Unsolicited PPP Project

PUBLIC–PRIVATE PARTNERSHIP CENTER OF THE PHILIPPINES

11

12 of 47

Project Stages for Solicited and Unsolicited PPP Projects

Development stage

Review and Approval stage

Procurement stage

Implementation stage

Review and approval of draft PPP contract

Qualification/Pre-qualification and Bidding/Comparative Challenge

PUBLIC–PRIVATE PARTNERSHIP CENTER OF THE PHILIPPINES

12

13 of 47

Implementing agencies (IAs)

IAs are authorized to identify, develop, assess, evaluate, approve, negotiate, award, and undertake PPP Projects.

A Regulatory Body, exercising quasi-judicial functions, shall not be allowed to undertake PPPs in the sector

or industry that it is mandated to regulate except where there are no available alternative IAs.

Otherwise, it shall adopt a conflict mitigation plan.

National IAs:

NGAs, SUCs, GOCCs including GICPs, GCEs, and GFIs, water districts, and economic zone authorities

Local IAs:

LGUs and LUCs

PUBLIC–PRIVATE PARTNERSHIP CENTER OF THE PHILIPPINES

13

14 of 47

The PPP Center of the Philippines

14

PUBLIC–PRIVATE PARTNERSHIP

CENTER OF THE PHILIPP

INES

Advocate for policy initiatives to

enhance enabling environment

The PPP Center facilitates the implementation of the country’s PPP Program. It serves as the

central coordinating and monitoring

agency for all PPP projects.

14

Provide technical assistance in PROJECTS

(development to implementation)

Conduct capacity building activities to improve skills of government agencies and the private sector

Draft policy matter opinions for approval of the PPPGB and issue non-policy matter opinions relating to PPPs upon request of IAs and the private sector

Manage and administer the Project Development and Monitoring Facility and Risk Management Fund

15 of 47

Overview of PPP projects in the pipeline

15

PUBLIC – PRIVATE PARTNERSHIP CENTER

No.

PhP (Bn)

USD (Bn)

National

124

2,426.10

48.52

Local

65

155.15

3.10

*Total estimate project cost does not include projects undergoing studies and with costs that are yet to be finalized

By Approving Body**

As of May 28, 2025

189

PROJECTS

IN THE PIPELINE

PHP 2,581.26 Billion*

(USD 51.63 Billion)

Approving Body

General

Classification

Total

Solicited

Unsolicited

NEDA Board

12

14

26

Head of IA

40

22

62

To Be Determined

36

0

36

Total

88

36

124

**For National PPP Projects: Based on indicative project costs and cost

threshold pursuant to Sec. 7(a) of the PPP Code

Sector

Total

Transportation and road

61

Property Development

42

ICT

21

Health

15

Water and Sanitation

15

Agriculture and Food Security

7

Power/Energy

6

Solid Waste Management

7

Tourism

10

Education

4

Justice and Corrections

1

Total

189

Mode

Classification

Total

National

Local

Solicited

88

33

121

Unsolicited

36

32

68

Total

124

65

189

By Sector

Stage

Classification

Total

National

Local

Procurement

6

7

13

Approval

9

6

15

Negotiation

7

9

16

Project Preparation

102

43

145

Total

124

65

189

By Mode and Level By Stage

16 of 47

PPP projects dashboard

16

Link to PPP Projects Dashboard:

https://ppp.gov.ph/project-dashboard/

PUBLIC – PRIVATE PARTNERSHIP CENTER

17 of 47

Considerations for UK Organizations Pursuing PPP Projects in the Philippines

17

18 of 47

Director III

Project Development Service

RAPHAEL M. BADILLO

PUBLIC–PRIVATE PARTNERSHIP CENTER OF THE PHILIPPINES

18

19 of 47

Sustainability, resiliency, climate change and GEDSI in PPP projects

Gender Equality, Disability, and Social Inclusion (GEDSI)

Climate Change

Sustainability

Resiliency

Integration of sustainability, resiliency, climate change and GEDSI in PPP projects is mandated by the PPP Code and its IRR

PUBLIC–PRIVATE PARTNERSHIP CENTER OF THE PHILIPPINES

19

  • Identified as guiding principles in identifying and developing PPP projects
  • Related project safeguards and Key Performance Indicators are required to be included in Feasibility Studies and are mandatory provisions in PPP contracts
  • Included in the evaluation criteria for PPP projects submitted to approving bodies
  • Other initiatives:
  • Project preparation and transaction advisory support for sustainable and resilient PPP

projects, in partnership with facilities such as the ADB-UCCRTF and UNDP

  • Development of Investment Portfolios for Risk Resilience which contain recommended climate-resilient actions and investments to manage risks or impact of climate change, some of which may be through PPPs tapping climate finance
  • Developing guidelines on conservation tourism PPP projects in protected areas in

partnership with UNDP BIOFIN and DENR Biodiversity Management Bureau

  • Comprehensive Capacity Building Program on Climate Change, Disaster Risk Management, and Resiliency

20 of 47

Policy Considerations

20

PUBLIC–PRIVATE PARTNERSHIP CENTER OF THE PHILIPPINES

•.

PUBLIC UTILITIES

As defined in Sec.10 of the Act

  • Distribution of Electricity
  • Transmission of Electricity
  • Petroleum and Petroleum Products Pipeline Transmission Systems
  • Water Pipeline Distribution Systems and Wastewater Pipeline Systems, including sewerage pipeline systems
  • Seaports
  • Public Utility Vehicles(PUVs)*

CRITICAL INFRASTRUCTURE

As defined in Sec. 2(g) and Rule VIII of the Act

Telecommunications

Sec 2(g), refers to any public service which owns, uses, or operates systems and assets, whether physical or virtual, so vital to the Republic of the Philippines that the incapacity or destruction of such systems or assets would have detrimental impact on national security; and as declared by the President of the Philippines.

*Sec. 2(v)PUVs are internal combustion vehicles that carry passengers and/ or domestic cargo for a fee,

offering services to the public except those operating through transport netork corporations (e.g., Grab)

Airlines and Airports

Rail ays

Express ays

Shipping

Public Service Act (RA 11659)

Identifies public services as businesses affected with public interest; Distinguishes public services from public utilities and critical infrastructure

PUBLIC SERVICES

21 of 47

Policy Considerations

21

PUBLIC–PRIVATE PARTNERSHIP CENTER OF THE PHILIPPINES

Public Service Act (RA 11659)

  • Identifies public services as business affected with public interest;
  • Distinguishes public services from public utilities and critical infrastructure

•.

PUBLIC SERVICES

Allows up to 100% equity investment of foreign nationals

PUBLIC UTILITIES

Nationality requirements of the 1987 Philippine Constitution apply (Art. XII, Sec. 11) for operators of a Public Utility:

  • Citizens of the Philippines; or
  • Corporations or associations organized under Philippine law, with at least 60% of their capital owned by Filipino citizens.

CRITICAL INFRASTRUCTURE

(Sec. 45) Foreign ownership in entities involved in the management and operation of critical infrastructures is capped at 50% unless the country of origin of such foreign entity accords reciprocity to Philippine Nationals.

22 of 47

Policy Considerations

22

PUBLIC–PRIVATE PARTNERSHIP CENTER OF THE PHILIPPINES

Legal

Structure

Consortium Corporation

Sole Proprietorship

Financial

Equity Financing

  • Sufficient net worth for

minimum equity investment in the PPP project.

Debt financing

  • Access and eligibility to obtain bank financing

equivalent to the debt

requirement of the project

Technical

  • Firm experience-

similar projects

successfully completed ( in terms of scope and cost)

  • Key personnel with

relevant experience

  • Applicable technical licenses

Qualification requirements* for entities interested to participate in PPPs as the Private Sector Partner

*Refer to Section 72 of the PPP Code IRR

23 of 47

Opportunities with PPP Center’s Project Development and Monitoring Facility (PDMF)

23

24 of 47

Project Development Officer

Project Development and Monitoring Facility Service

24

RANEL P. LOMBRES

PUBLIC–PRIVATE PARTNERSHIP CENTER OF THE PHILIPPINES

25 of 47

The Project Development and Monitoring Facility

25

Independent Consultant and

Third-party Appraisers

Project preparation and transaction advisory consultants

Probity Advisory

Other Services

  • Constitution/utilization of dispute resolution boards
  • Other services as may be approved by the PPPGB

PUBLIC – PRIVATE PARTNERSHIP CENTER

with initial contribution to ADB Capacity Building TA for PPP from:

83.93

14.43

0.41

The PDMF is a Php 4.4 Billion (USD 98.77M) revolving fund designed for the upstream and downstream financing requirements of PPP projects, managed by the PPP Center and institutionalized under the PPP Code of the Philippines

PDMF Fund Sources

(in USD million)

Philippine Government

Australian Government via ADB

Urban Climate Change Resilience Trust Fund (UCCRTF) via ADB

26 of 47

The PDMF Portfolio

26

Our portfolio is comprised of successfully awarded and developed PPP projects in various sectors.

Health

Educatio n

Agriculture and

food security

Water supply and sanitation

Tourism

Physical connectivity

Digital connectivit y

Energy

PUBLIC – PRIVATE PARTNERSHIP CENTER

27 of 47

Snapshot of PDMF Portfolio

15

Completed PDMF support

13

Project Preparation and Transaction Advisory

2

Independent

Consultant

8

For consultant selection

3

Ongoing open

competitive bidding

5

For publication

(1- ADB)*

20

Ongoing Consulting Contracts

14

Transport

(3-IFC, 3-ADB)

2

Property Development

1

Water

1

Agriculture (1-ADB)

1

Health*

1

Education (1-ADB)

*procurement of IFI via negotiated procurement

28 of 47

The PDMF Portfolio

Automatic Fare Collection System Project

South (ITS) Project

Bulacan Bulk Water Supply Project

NLEX-SLEX

Connector

Road Project

Civil Registry System IT Project, Phase II

IC

Independent

Consultant Services

*Tender and award of EPC and O&M contracts were done by BCDA (IA)

PPTA

Project Preparation & Transaction Advisory

Percentage of Contract Value from Total Project Cost: 1.59%

PPP for School Infrastructure Project I

MCIA – New

Passenger Terminal Project

Clark International Airport EPC Project*

Cavite- Laguna Expressway Project

PPP for School Infrastructure Project II

Southwest Integrated Transport System (ITS) Project

Completed PDMF support

Modernization of the Philippine Orthopedic Center

Laguindingan International Airport

Bohol-Panglao International Airport

Civil Registry System IT

Project, Phase II

29 of 47

The PDMF Portfolio

20 ongoing PDMF-supported consulting services

Tender Stage

  • Bislig City Bulk Water Supply and Septage Project

Approval Stage

  • UP PGH in Diliman Project
  • UPLB Agro-Industrial and IT Parks Project
  • NEDA sa Makati Property Redevelopment Project
  • San Ramon Newport Project
  • Unsolicited Proposals for Regional Airports*

Project Development Stage

  • O&M of the Cebu Bus Rapid Transit Project
  • NCR EDSA Busway Project
  • MAPALLA Ferry Project
  • North Long Haul Project
  • Mindanao Railway Project Phase III (Northern Mindanao)
  • San Mateo Railway Project
  • North Integrated Transport System
  • Air Traffic Services-Air Navigation Services Project
  • Light Rail Transit Line 2 (LRT2) Project
  • Philippine Automatic Fare Collection System Project
  • Davao Public Transport Modernization Project
  • National Food Hub Project
  • MRT 3 Operations and Maintenance Project
  • PPP for School Infrastructure Project Phase III

PUBLIC – PRIVATE PARTNERSHIP CENTER

29

*Bundled PPTA consulting services to three projects: Laguindingan, Bohol and Iloilo Airports. To date, Laguindingan and Bohol Airports have already been successfully awarded. Iloilo Airport is currently being reviewed by the Approving Body.

30 of 47

The PDMF Portfolio

8 projects for consultant selection

Project Preparation and Transaction Advisory

  • Halls of Justice Project (Php54.730M)
  • Cavite Bulk Water Supply Project (Php63.720M)*
  • Nuclear Medicine Research and Innovation Center (Php33.730M)
  • Senate-Deped Teacher’s City Project (Php29.150M)
  • Philippine Digital National Identity Project (Php23.48M)
  • DOTr Central Office Main Building (Php 37.123 M)

Independent Consultancy (IC)

  • Civil Registry System - IT Project, Phase 2 (Php22.439M)
  • Laguindingan International Airport (CGY) (Php500.272M) and Bohol-Panglao International Airport (TAG) (Php514.381M)

30

*Awaiting further instructions from Provincial Government of Cavite prior to publication of REOI

31 of 47

Upcoming PDMF Opportunities

4 projects for technical assistance

agreement execution

Project Preparation and Transaction Advisory

  • Iloilo-Capiz-Aklan Expressway Project
  • Poro Point Seaport Modernization Project
  • MRT 4 Operations and Maintenance Project
  • PPP for School Infrastructure Project Connect

Conceptual Alignment of the

ICAEx Project

Poro Point Seaport Modernization Project

31

32 of 47

Upcoming PDMF Opportunities

32

2 provisionally approved projects

Project Preparation and Transaction

Advisory

  • La Union Bulk Water Supply Project
  • O&M of the Panguil Bay Bridge Project

La Union Bulk Water Supply Project

O&M of the Panguil Bay Bridge Project

33 of 47

Process and timelines

*subject to change depending on a variety of factors

**PDMF application should be submitted at least 1 month before the scheduled PDMF Committee Meetings

General process and indicative timelines

Application for PDMF Support

PDMF

Committee

Approval

  • Evaluation of the complete PDMF application will take up to 2 weeks
  • PDMF Committee Secretariat to include the application in the PDMF Committee meeting agenda for approval
  • Approves PDMF Applications on the same day
  • Technical Assistance Agreement between PPP Center and the IA will be executed

Activities

Indicative

timeline*

Remarks

Review and approval of complete PDMF Application

≈ 2 weeks**

PDMF Committee to deliberate on the PDMF application during regular meetings (once every quarter)

Signing of Technical Assistance Agreement (TAA) between PPP Center and IA

≈2 weeks

Includes finalization of the Terms of Reference and preparation of the Bidding Documents

Procurement of Consulting Services

≈1.5-2 mos. if engagement of IFI

≈5-6 mos. through open competitive bidding*

Via RA 9184: Government Procurement Reform Act

≈3-4 mos. using panel of consultants

Via ADB Procurement

Guidelines

E PARTNERSHIP CENTER 33

≈4-5 mos. using ADB

open bidding

PUBLIC – PRIVAT

34 of 47

PDMF Recovery

34

Reimbursement Mechanism

Recoverable Amount* shall be reimbursed as follows:

For Project Preparation and Transaction Advisory

  • If successfully awarded, reimbursement will be by the winning bidder of the PPP project, as a condition precedent to the signing of the PPP contract.
  • If not awarded, reimbursement will be by the IA if there is/can be no winning bidder
    • if the reason is beyond the control of IA, reimbursement may be reduced subject to approval by the PDMF

Committee.

For Implementation Monitoring

  • Cost of the consulting contract to be shared between IA and Concessionaire. Only Grantor’s Share will be drawn from the PDMF. Concessionaire Share will be administered by the PPP Center pursuant to the PDMF Guidelines. The reimbursement of the PDMF amount shall be done by the IA.

*PDMF Cost Drawn + 10% Cost Recovery Fee

For more info, you may visit https://ppp.gov.ph/pdmf-guidelines

PUBLIC – PRIVATE PARTNERSHIP CENTER

35 of 47

35

Highlighted Projects

Transportation Sector

36 of 47

San Ramon Newport Project

Project Status

Approved

Mode

Solicited

Project

Description

The project involves the construction, operation, and maintenance of a world-class seaport at ZamboEcozone, aimed to improve its competitiveness and fulfill its vision of becoming a world-class economic zone that will link resources, markets, and other logistical activities that can contribute to the economic development of Zamboanga City and Mindanao.

Implementing

Agency

Zamboanga City Special Economic Zone Authority

Estimated Project Cost

PHP 14.82 billion (approx. USD 296.4 million*)

Contractual

Arrangement

Build-Operate-Transfer

Location

Zamboanga City (Region IX)

Upcoming

Project Milestone

Issuance of invitation to pre-qualify bidders - July 22, 2025

*Conversion rate: USD 1 = PHP 50

37 of 47

Project Status

For Approval

Mode

Solicited

Project

Description

This project is for the O&M service provider capable of providing high standards of safety and levels of service for the MMSP. The service provider will be engaged through an O&M concession under the PPP Code.

Implementing Agency

Department of Transportation

Estimated Project Cost

PHP 80.14 billion (approx. USD 1.60 billion*)

Contractual Arrangement

Operations and Maintenance

Location

National Capital Region

Upcoming Project Milestone

Approval is anticipated by June 2025

*Conversion rate: USD 1 = PHP 50

Metro Manila Subway Project (MMSP)

Operations and Maintenance (O&M) PPP Project

38 of 47

Project Status

For Approval

Mode

Solicited

Project Description

The project involves the O&M of the NSCR trains, depots, stations, guideways, electromechanical systems , and auxiliary facilities from Clark to Calamba, including management of interoperations of MMSP and NSCR trains within the NSCR system, particularly in the Bicutan to Calamba segment with a concession period of 15 years of full operations (i.e., on top of pre- and partial operations period, as may be applicable).

Implementing Agency

Department of Transportation

Estimated Project

Cost

PHP 193.81 billion (approx. USD 3.87 billion*)

Contractual Arrangement

Operations and Maintenance

Location

National Capital Region

Upcoming Project Milestone

Approval is anticipated by June 2025

*Conversion rate: USD 1 = PHP 50

North-South Commuter Railway (NSCR)

Operations and Maintenance (O&M) Public-Private Partnership (PPP) Project

39 of 47

Project Status

Ongoing project study preparation

Mode

Solicited

Project Description

Design, finance, upgrade, enhance, operate and maintain the airport facilities. Investment requirements aim to ensure the airport is compliant with regulation and standards along with expansion of passenger terminal and new taxiway to ensure short term demand can be serviced in the short term; and expand passenger terminal, aprons, runway and taxiways with respect to traffic growth and develop other landside facilities.

This is for possible bundling with other DOTr regional airports.

Implementing Agency

Department of Transportation

Estimated Project Cost

To be determined

Contractual

Arrangement

To be determined

Location

To be determined

Upcoming Project Milestone

Feasibility Study completion by September 2025

Davao International Airport and Bundled Regional Airports

Solicited Public-Private Partnership Project

40 of 47

Project Status

Ongoing project study preparation

Mode

Solicited

Project Description

Financing, design and construction of enhanced bus stations, operations control centers and bus depots, and the supply, operations and maintenance of a high-capacity busway/Bus Rapid Transit (BRT) system plying through Circumferential Road 4 (EDSA) and other major and feeder roads.

Implementing Agency

Department of Transportation

Estimated Project Cost

To be determined

Contractual Arrangement

To be determined

Location

National Capital Region

Upcoming Project

Milestone

Feasibility Study completion by June 2025

NCR EDSA Busway

Solicited Public-Private Partnership Project

41 of 47

North Integrated Transport System

Project Status

Ongoing project study preparation (Pre-Feasibility Study)

Mode

Solicited

Project

Description

The project is an integrated multi-modal transport and logistics system designed to be a multi-level, mixed-use terminal facility. It shall host provincial buses of northern destinations, serve passengers bound for/departing from areas north of NCR, and connect said passengers to urban transport systems which are serving inner Metro Manila.

Implementing

Agency

Department of Transportation

Estimated Project Cost

To be determined

Contractual

Arrangement

To be determined

Location

National Capital Region

Upcoming Project

Milestone

Pre-Feasibility Study completion by the 3rd Quarter of 2025

42 of 47

42

Highlighted Projects

Information and Communications Technology (ICT) Sector

43 of 47

New Clark City Information Communications Technology Passive Infrastructure Project

Project Status

Under Procurement (Published the Instructions to Bidders in May 28, 2025)

Mode

Solicited

Project Description

The Information and Communications Technology (ICT) for the New Clark City (NCC) envisions a smart urban development which has to be under a phased building concept to consider the demand increase through time and the greenfield nature of the city. The scope was conceived under an Open Access Fiber which shall be implemented with the construction of passive infrastructure assets that shall carry bandwidth of Telecommunication Companies and Data Transmission Providers down to every lettable unit (e.g. residences, businesses, institutions and offices, and data centers) inside the NCC.

Implementing Agency

Bases Conversion and Development Authority

Estimated Project Cost

PHP 2.5 billion (approx. USD 50 million*)

Contractual Arrangement

Joint Venture

Location

Tarlac (Region III)

Upcoming Project

Milestone

Issuance of final Instructions to Bidders – July 1, 2025

*Conversion rate: USD 1 = PHP 50

44 of 47

Philippines Digital National Identity

44

RTNERSHIP CENTER

Project Status

Ongoing Negotiation

Mode

Unsolicited

Project Description

Involves the financing, upgrade, design and development, and operation and maintenance of the existing information technology infrastructure of PhilSys that is already owned by the Philippine Statistics Authority, designed to collect, store, maintain, manage and verify identity information of qualified individuals who deal with government agencies and other public and private persons or entities, required to be administered under the PhilSys. The Project intends to introduce state-of-the-art technology, which will streamline and improve the PhilSys registration and identity authentication services to effectively meet the needs of the Filipino public.

Implementing

Agency

Philippine Statistics Authority

Estimated Project Cost

To be determined

Contractual

Arrangement

Build-Transfer-Operate

Location

Nationwide

Upcoming Project

Milestone

Conclusion of Negotiations by the 3rd Quarter of 2025

45 of 47

45

Question & Answer

46 of 47

46

Closing Remarks

47 of 47

47

For further information, please visit: www.ppp.gov.ph

For inquiries, you may e-mail:

info@ppp.gov.ph

PUBLIC–PRIVATE PARTNERSHIP CENTER OF THE PHILIPPINES