Presented by :
PDL Group - Progress Dynamics (Pvt) ltd.
CERTIFICATIONS
Progress dynamics (Pvt) LTD. Is registered with Pakistan engineering council in C-A (no limit) category, and also in compliance with the quality standards of ISO 9001:2015, ISO 14001:2015 & ISO 45001:2018
C&W Department
Punjab Highway Department
C&W Department
Punjab Building Department
PHE & HUD Department
Capital Development Authority
COMPANY’S BRIEF HISTORY
A turnkey steel fabrication & engineering company established in 1996 and incorporated with engineering council , well-known client in 2005 with state of the art facilities, having superb and excellent track record of completing fast track and complex projects with pace and precision according to the international standards /specifications and to the satisfaction of customer/client.
Since its inception, the company has achieved remarkable success in
Our Group
WHERE DESIGN COMES TO LIFE
Fabrication / Form Work
Pre-engineered Building
Mobile Units
Porta Cabin
Galvanizing
Bowsers
Hydro Power
Metro Bus System
Tanks, Silos & Vessels
WHAT WE DO
Crane & Conveyors
Towers
Pipe Line
Street Furniture
Garbage Bins
Road Safety
Clients
Certificates
Gantry Structure & Signage
WHERE DESIGN COMES TO LIFE
Projects�(Under Construction)
Projects�(recently completed)
Projects�(Our Key Projects)
Projects in Pipe Line
FORM WORK /SCAFFOLDING SYSTEM
Form work (Orange Line Ring Road Flyover, Lahore)
ROOF / SLAB FORM WORK
Versatile slab/Roof form work for ceilings in residential and industrial buildings
• Small number of individual parts
• Optimized material deployment
• For any slab thickness
• Length adjustment through overlapping of girders
• Light-weight individual parts
• Optimized adjustment to any layout
Hydro Power Projects� Formworks.
WHERE DESIGN COMES TO LIFE
TUNNEL LINER FORM WORK
PROCESS DYNAMICS
www.pdl.com.pk
SUPPLY OF HORIZONTAL MOVABLE LINER 6.7M DIA
AT KOTLI GULPUR 102 MW HYRDO POWER PLANT
SUPPLY OF LOWER BEND AT KOTLI GULPUR
102 MW HYRDO POWER PLANT
SUPPLY OF LOWER BEND AT KOTLI GULPUR
102 MW HYRDO POWER PLANT
SUPPLY OF LOWER BEND AT KOTLI GULPUR
102 MW HYRDO POWER PLANT
SUPPLY OF LOWER BEND AT KOTLI GULPUR
102 MW HYRDO POWER PLANT
SUPPLY OF LOWER BEND AT KOTLI GULPUR 102 MW HYRDO POWER PLANT
SUPPLY OF LOWER BEND AT KOTLI GULPUR 102 MW HYRDO POWER PLANT
SUPPLY OF LOWER BEND AT KOTLI GULPUR
102 MW HYRDO POWER PLANT
SUPPLY OF LOWER BEND AT KOTLI GULPUR
102 MW HYRDO POWER PLANT
SUPPLY OF VERTICAL LINER 6.7M DIA AT KOTLI GULPUR
102 MW HYRDO POWER PLANT
FABRICATION AND INSTALLATION
CEMENT PLANT
Progress Dynamics (Pvt) Ltd. has been awarded projects for fabrication & Installation by renowned Cements Plants of Pakistan:
Askari Cement Co. (Pvt) Ltd. Attock KPK, Pakistan
Bestway Cement Co. (Pvt) Ltd. Hattar Taxila, KPK, Pakistan
Lucky Cement Limited. Lucky Marwat, KPK, Pakistan
DG Cement (Reon). Kallar Kahar, Punjab, Pakistan
FABRICATION AND INSTALLATION
BESTWAY CEMENT PLANT
FABRICATION AND INSTALLATION
ASKARI CEMENT PLANT
FULFILL YOUR MATERIAL HANDLING NEEDS
CONVEYORS & CRANES
We have expertise to provide & install variety of conveyors & cranes to meet different operations according to need. We have extensive experience in various industries. Our expert team understand industry-specific conveyors systems including monorail, belt driven and Pneumatic. We are committed to getting it right the first time, keeping it simple and being easy to work with. We think of our customers as long term business partners, and their success is ours. Its is our goal to provide quality products that make you profitable
INSTALLATION OF CONVEYOR AT KOTLI GULPUR
102 MW HYRDO POWER PLANT
INSTALLATION OF CONVEYOR AT KOTLI GULPUR
102 MW HYRDO POWER PLANT
INSTALLATION OF CONVEYOR AT KOTLI GULPUR
102 MW HYRDO POWER PLANT
Road / Transport Infrastructure PROJECT
The Metro Bus System (MBS), is the country’s first rapid mass transit bus project which provides the best travelling facilities to the citizens. There are 27 bus stations on 27 Km long road track from Gajumata to Shahdara.
By the grace of ALLAH we have successfully completed different tasks of MBS given to us. We have completed fabrication work at certain Bus stations & points on Metro Bus route which includes Railing, Bus Stations, Pedestrian Bridges, Shuttering, Ticketing Booths etc.
General Fabrication Works
Orange Line Stations and Bridges
Under Construction Projects
Mehmood Boti, Shalemar, Pakistan Mint, Salam Park, Salamat Pura
25M X 150M
Orange Line Stations and Bridges
Mehmood Boti, Shalemar, Pakistan Mint, Salam Park, Salamat Pura
Plant Fabrication and Erection (Tile Plant).
Orient Ceramica
Orient Tile Plant Album
Plant Fabrication and Erection (Poly-pack Film Plant).
PETPAK Films (Pvt.) Ltd.
Plant Fabrication and Erection (Poly-pack Film Plant).
Tripack Films (Pvt.) Ltd.
Double Wall Underground Fuel Tanks. (Total Parco)
PORTA CABINS
&
PRE FAB BUILDINGS
PRE FAB BUILDINGS
Process dynamics has achieved an excellence in the designing and construction of metal buildings. It’s a portable steel building made up of columns, rafters , purlins . these components are fabricated in factory or manufacturing site and then transported to construction site, where it is assembled and installed.
Over the past few years the company has completed numerous projects of metal buildings.
PRE FAB Structures Buildings
Some of our Major Pre Feb Projects. | |||||
SR | Project Name & Location | Client | Consultant: | Cost | Year |
| Lahore | Sarwar & Co (Pvt) Ltd | Nespak | 27.3 million | 2012 |
| BRTS Rawalpindi- Islamabad� BUS DEPOT | Habib Construction Services (Pvt) LTD | Nespak | 50.2 million | 2015 |
| Garrison University Lahore� (Basket Ball Court) | Garrison University | Talat Javed Associate | 8.5 million | 2018 |
| ORANGE LINE STATIONS | Habib Construction services (Pvt) LTD | Nespak | 140 million | 2018 |
| BHUSSA SHELTER (MES) | Military Engineering Services | MES | 17.5 million | 2019 |
| PAKISTAN PETROLEUM LTD (SHADADPUR - RESIDENCES) | : PPL | PPL | 120 million | 2019 |
| FWO (SITE CAMP AT M2) | LAHORE ISLAMABAD MOTORWAY , M2 , NEAR JARANWALA | ZEERUK | 80 million | 2019 |
| POWER PLANT WORKSHOP (K2) | PPW | PPW | 140 million | 2014 |
Porta Cabin And Pre-Feb Buildings Click
Prefab, Canopies, depot and container projects Pictures.
PEB Structure Projects
SILOS, TANKS & VESSELS
100 & 150 tons: SILO
We design and manufacture customized steel tanks for a wide range application. Process Dynamics has the design, manufacturing capability & product diversity. If you are in search of a dependable experienced source for customized tanks, pressure vessels, heat exchanges, field erection & repair, or related products and services.
“then PROCESS DYNAMICS is the answer”
We are ready to put our expertise and commitment to quality for your future projects
1500 tons: SILO
Spray Dryer Nimir’s Group
Spray Dryer Testing Videos
Project Name: Supply and Installation of Spray Dryer
Client Nimir’s: Resins Limited
Project Start Date: December 2018
Handover to Client: with in100 Business Day after LPO.
Location: Nimir's , Sheikhupura
PDL Major Client for Solar Structures.�
Solar Structure Projects
We take pride in showcasing our track record of successful project completions. Over the years, our dedicated team has delivered a multitude of projects, each marked by precision, innovation, and client satisfaction.
Our portfolio speaks volumes about our commitment to excellence. Currently, we're actively engaged in few projects, where we're applying cutting-edge solutions to achieve remarkable outcomes.
This blend of past successes and ongoing endeavors underlines our expertise and dedication to driving projects from concept to completion.
FABRICATION AND INSTALLATION
LUCK CEMENT 34 MW SOLAR STRUCTURE
WE MAKE YOUR VISION A REALITY
TOWERS
Lattice / Angular Tower
Tubular Tower
Monopole
Guy Mast Tower
Octagonal Pole
Rooftop Towers
Electricity Tower
The need for business transformation for communication service providers has been greater than before. With a rapidly changing business landscape in communication services, it is necessary for service providers today to establish their brand as the best in the market and at the same time transform their systems to support and launch new services continuously across multiple channels of communication.
In this competitive landscape, Process Dynamics is helping communication service providers provide gain new agility in responding to change, with a communication practice that blends industry knowledge, targeted services, technology & functional expertise: Our few products are
WE MAKE YOUR VISION A REALITY
ELECTRICITY TOWERS & CROSS ARMS
LT Structure 30’-8”
HT Structure 34’
HT Structure 40’
HT Structure 45’
Supporting Rods
Single GSM Antenna Mounts
Dual GSM Antenna Mounts
Microwave Mounts
Cable ladder
ODU Sunshades
Tower Strengthening Material
Solar Support Material
Material Fabrication Pictures for� Miscellaneous Clients
Material Fabrication Pictures for� Miscellaneous Clients
Flood Lights Poles
Muzaffarabad Cricket Stadium
ROAD SAFETY
PROJECT TO YOUR SATISFACTION
CLIENT LIST
Question & Answer
Thank You