NORFOLK DISTRICT

1

U.S. ARMY CORPS OF ENGINEERS

SAME: Wind, Water, & the Warfighter

Kristin Mazur

Coastal Storm Risk Program Manager

2 December 2022

“The views, opinions and findings contained in this report are those of the author(s) and should not be construed as an official Department of the Army position, policy, or decision, unless so designated by other official documentation”.

2 of 8

PROGRAM AT A GLANCE

*Further Small Business socio-economic set-aside may be determined pending results of market research

PROGRAM SUMMARY:

FY18

FY19

FY20

FY21

FY22

FY23

MILITARY:

$134M

$118M

$477M

$315M

$105M

$100M

IES:

$16M

$33M

$28M

$145M

$85M

CIVIL & OPS

$82M

$86M

$51M

$60M

$153M

$150M

ANC:

$24M

$45M

$30M

$20M

$10M

DoDEA:

$24M

$22M

$27M

$25M

$25M

$25M

IIJA

$557M

$280M

$304M

$613M

$565M

$935M

*Does not include new or awards from existing AE IDIQs

2

3 of 8

Bipartisan Infrastructure Law (BIL)�(Infrastructure Investment and Jobs Act, P.L. 117-58)

3

OPERATION AND MAINTENANCE (Price ranges are IAW FAR 36.204)

  • GATHRIGHT DAM AND LAKE MOOMAW, VA  Repair Gathright Dam Intake Tower (Range $1M – $5M)
  • LYNNHAVEN INLET, VA Dredging and Surveys (Range $1M – $5M)
  • MILFORD HAVEN, VA Jetty maintenance, including surveys, plans, and specs, dredging, including surveys, plans, and specs. (Range $5M – $10M)

CONSTRUCTION

  • CITY OF NORFOLK, VA Complete Plans and Specs for the project and initiate construction of the project. ($399M) (NEW START)
  • NORFOLK HARBOR AND CHANNELS, VA (DEEPENING) Continue construction in combination with the FY22 President’s Budget amount. ($141.7M)(NEW START) Newport News and Norfolk Inner Channels, Atlantic Ocean Channel, Anchorage F
    • PPA signed in April, first Federal contract awarded August 2022 for Channel to Newport News and Norfolk Inner Channel

CONTINUING AUTHORITIES PROGRAM WORK PLAN  ($420,000 TOTAL)

  • HAMPTON ROADS BENEFICIAL USE, VA (SEC 204) Continuing the feasibility study (Range $250K – $500K)
  • INDIAN RUN, VA (CAP SECTION 14) Completing PED/Initiating Construction (Range $100K – $250K)

GENERAL INVESTIGATIONS

  • VIRGINIA BEACH + VICINITY COASTAL STORM RISK MANAGEMENT ($1.5M)(NEW START) – Agreement signed with City in July 2022.

4 of 8

NORFOLK COASTAL STORM RISK MANAGEMENT

4

5 of 8

OVERALL NORFOLK CSRM PROJECT SCOPE

Area 1 Ghent-Downtown-Harbor Park

Area 2 Pretty Lake

Area 3 Lafayette

Area 4 Broad Creek

Non-Structural (concurrent to other work)

City’s Priorities for Construction Sequence:

Phase 1

1

2

3

4

2

3

1

4

Non-Structural Measures throughout City of Norfolk:

Berkley, Campostella, Elizabeth Park, Ingleside, Norfolk International Terminals (NIT), Willoughby

6 of 8

VIRGINIA BEACH COASTAL STORM RISK MANAGEMENT STUDY

6

  • Feasibility study kicked off on 21 July 2022

  • 50/50 Cost-share with the City of Virginia Beach

  • 3x3x3 Does not apply due to the size and complexity of the study

  • Analyzing measures to reduce storm and flood risk

  • Next step is the Tentatively Selected Plan

7 of 8

NORFOLK HARBOR NAVIGATION IMPROVEMENTS

7

8 of 8

QUESTIONS?

8