THRU PEDESTAL INSTALLATION SEQUENCE

SUGGESTED STEPS FOR EFFICIENT INSTALLATION WHEN SYSTEM REQUIRES DIRECT BOND TO SUBSTRATE OR MEMEBRANE.

2 of 11

3 of 11

Establising pedestal placement. Able to set the heights with the base plate and rod installed.

4 of 11

Template or paver without stainless straps installed -speeds up pedestal placement

5 of 11

When pedestal placement determined, trace around the base. Apply glue within outline.

6 of 11

Glued down plate.

7 of 11

After stainless Base Plate has been glued down, it is time to trim the threaded rod height to fit the pedestal. This short video is also available on website: https://www.underlockusa.com/videos

8 of 11

9 of 11

Finished Installation Under Paver Surface

10 of 11

Direct Bond Termination of System

Double Plate connected by internal Threaded Rod

11 of 11

Termination of System At Perimeter

System side of the paver is secured with socket screw and other side is cut and direct glued to the stainless-steel top plate at the perimeter. Bottom plate at perimeter is glued to the membrane.