Article 7: Adopt the Specialized Energy Code
November 28, 2023
Article 7: Specialized Energy Code
To see if the Town will vote to accept and adopt the so-called “Specialized Energy Code”, found at 225 CMR 22 and 23 and Appendices RC and CC, including amendments or modifications thereto, with an effective date of July 1, 2024, a copy of which is on file with the Town Clerk, all for the purpose of regulating the design and construction of buildings for the effective use of energy and reduction of greenhouse gas emissions, and to amend the Town By-laws, Article XXXII to reflect adoption of such code as follows; or take any other action relative thereto.
Specialized Energy Code: What & Why
What
Specialized Energy Code: What & Why
What
Why
Building Codes: Story of Change
Massachusetts Building Policy
The 2021 Climate Act commits MA to Net Zero in 2050.
Approach to Building Sector
Future MA Building Code Options
Recommendation
2021 Stretch Code
301 of 351 MA communities, including Weston.
Today
All-Electric Pilot Program
Updated Stretch Energy Code
Specialized Energy Code
July 1, 2024
The HERS Index Rates a Building’s Efficiency
HERS Index: Nationally-recognized standard to measure a home’s energy efficiency using variables like walls, insulation, ceiling/roof/window/doors, and HVAC systems.
Building Type | Stretch Energy Code | Specialized Energy Code |
All-Electric New Construction | HERS 45 | |
Mixed Fuel New Construction | HERS 42 | + Pre-wiring + Rooftop solar |
Additions & Alterations | Specialized Code Does Not Apply | |
Historic Buildings | Energy Codes Do Not Apply | |
Applies to: new construction only; all building types (residential, multi-family, municipal)
Frequently Asked Questions
Question | Answer | |
Is it expensive to comply? | No. DOER study shows All-Electric homes cost $20K less to build and $548/yr less to operate. But the Specialized Code does not require all-electric construction. | |
Does this apply to 40Bs? | Yes. | |
What about backup power? | You can install a fossil fuel backup generator on an “All-Electric” home. | |
Will I have to cut down trees to install rooftop solar? | No. Homes are exempt where solar access is less than 70% or the roof is too steep. | |
Will the grid be ready? | Yes. Eversource has filed plans to increase grid capacity by 180% to support “full electrification.” | |
Specialized Energy Code: Key Points
Essential to Weston’s Climate Goals
Essential to Weston’s Climate Goals
#1 for % EV ownership.
Specialized Energy Code essential.
Consistent to Surrounding Communities
Why Weston, Why Now
Please Vote Yes on Article 7
Appendix
Detailed Code Requirements
Appendix for
Permanent Building Committee
Questions I’ve Heard
Cost of Net Zero Buildings in MA
Key Findings from 2019 report and 2023 reports on MA Net Zero and Net Zero Ready buildings:
Cost of Net Zero Projects, 2023
Grid Readiness: Per Ian Finlayson, DOER
Stretch/Specialized Code buildings typically have lower peak heating loads and dramatically lower peak cooling loads than existing buildings and often new code gas buildings. Driven by strong envelopes + efficient tech.
Thus the Specialized Code doesn’t increase the load on the grid. (Note: ISO-NE peaks in summer)
The reasons for this are:
Grid Investment in Massachusetts
National Grid said it is planning to spend $2 billion over the next five years for new and upgraded power lines, transformers and substations, to meet an anticipated doubling of system peak demand.
According to Eversource, its plan will increase its grid capacity by 180%, or 3.4 GW, enabling “full electrification” for customers adopting EVs or heat pumps
Heat Pumps: Case Study from the Nordics
https://www.resilience.org/stories/2023-10-03/how-heat-pumps-became-a-nordic-success-story/
More FAQs for PBC
Does this impact affordable housing?
Minimally, if at all. Passive multi-family buildings are 3.7% more expensive to construct before rebates. Monthly bills are 30-50% lower for residents.
What about Accessory Dwelling Units (ADUs)?
If connected to the home, it’s considered an addition and subject to the normal code (like any addition). If not connected, then subject to new building codes.