1 of 21

Square Kilometre Array

Steve Torchinsky�responsable scientifique du projet Européen SKADS

Meudon le 20 sep 2007

Steve Torchinsky

Forum RI

2 of 21

Projet global

  • “Europe” projet SKADS: 13 pays,
    • dont Australie et Afrique du Sud
  • USA
  • Canada
  • Chine
  • Inde
  • Argentine
  • Afrique du Sud
  • Australie

Meudon le 20 sep 2007

Steve Torchinsky

Forum RI

3 of 21

Meudon le 20 sep 2007

 

Le projet SKA: feuille de route

FP6: SKADS, étude préparatoire

FP7: PREPSKA, phase préparatoire

Australia

South Africa

Steve Torchinsky

Forum RI

4 of 21

SKA en Afrique du Sud

  • 2006: ~USD50M pour KAT
    • Durée: 4 ans
    • Premières observations prévues pour 2009
    • Gouv. ajoute ~50 à 100 M$ pour infrastructure
      • Réseau haut débit
      • Réseau d’alimentation électrique
      • Zone protegée d’émetteurs radio
      • routes

Meudon le 20 sep 2007

Steve Torchinsky

Forum RI

5 of 21

MeerKAT

Meudon le 20 sep 2007

Steve Torchinsky

Forum RI

6 of 21

SKA en Australie

  • 2007: ~AUS101M pour ASKAP (anciennement xNTD)
    • Pour une période de 4 ans
    • Développement des paraboles avec “phased array feed”

Meudon le 20 sep 2007

Steve Torchinsky

Forum RI

7 of 21

Mapping Speeds

Meudon le 20 sep 2007

Staveley-Smith

Steve Torchinsky

Forum RI

8 of 21

Mapping Speed 1.0GHz

Meudon le 20 sep 2007

Staveley-Smith

Steve Torchinsky

Forum RI

9 of 21

SKA Mapping speed

Meudon le 20 sep 2007

Staveley-Smith

Steve Torchinsky

Forum RI

10 of 21

Meudon le 20 sep 2007

SKA FP6: SKADS – SKA Design Studies

Etude préparatoire de concept technique (06/2005- 06/2009)

Objectif: démonstration de la technologie de réseaux phasés multi-lobes

Budget global: 38 MEUR, dont 10.8 de la CE (1.8 MEUR pour la France)

En total sur 4 ans: Europe France

MEUR ETP ETP

OPAR (Obs. de Paris) 1.48 12 28

UORL (Univ. d’Orléans) 0.24 1.3 2.2

IRCOM (Univ. de Limoges) 0.33 0.75 2.7

OMMIC (Philips) 0.18 0.75 1.25

en France: 12 ETP/an, pendant 4 ans

Steve Torchinsky

Forum RI

11 of 21

Meudon le 20 sep 2007

La France dans SKADS

Australia

South Africa

Steve Torchinsky

Forum RI

12 of 21

Meudon le 20 sep 2007

 

PREPSKA: FP7 Preparatory Phase - Work Packages

Budget: 5.5 MEUR pour 3 ans + les fonds nationaux

participation mondiale

  1. Management
  2. SKA design
  3. SKA sites

4 SKA governance

5 SKA procurement and industrial involvement

6 SKA funding model

[Impact on current radio astronomy facilities]

8 SKA implementation plan, final report

Steve Torchinsky

Forum RI

13 of 21

Meudon le 20 sep 2007

PREPSKA: organigramme

Steve Torchinsky

Forum RI

14 of 21

Meudon le 20 sep 2007

 

PREPSKA WP2 (SKA Design) - objectifs

Primary deliverable: costed design for the SKA, including a detailed system design, and design verification units, for SKA Phase 1 (10% SKA).

Primary purpose: integrate this distributed design knowledge into a coherent costed design for the SKA, in preparation for construction of the telescope.

This will be achieved by establishing a central engineering program with strong links to regional activities – the likely form of the SKA construction model.

Central Design and Integration Team (CDIT): 17 persons to be recruited

Steve Torchinsky

Forum RI

15 of 21

Meudon le 20 sep 2007

 

Central Design and Integration Team (CDIT) & Regional teams - 1

Australia

South Africa

Steve Torchinsky

Forum RI

16 of 21

Meudon le 20 sep 2007

 

Central Design and Integration Team (CDIT)

17 personnes à recruter

Steve Torchinsky

Forum RI

17 of 21

Meudon le 20 sep 2007

 

WP2 FTE = k€ EC organisations

2.1.7 SKA manufacturing studies 1 90 0 OPAR NXP

2.6.1 Low-noise amplifiers 2.5 150 40 OPAR XLIM

2.6.2 Integrated receivers 3.5 210 40 OPAR XLIM

2.8.1 Station DSP 4.2 252 + 12 60 OPAR UORL NXP

2.8.3 Interference mitigation 2 120 + 12 40 OPAR UORL NXP

Total 13.2 822 + 24 180

Partenaire: CNRS

Organisations: OPAR Observatoire de Paris Observatory (USN +GEPI, LESIA)

UORL Université d’Orléans (LESI)

XLIM Université de Limoges

NXP (ex-Philips Semiconductors), Caen

PREPSKA – contribution française

Steve Torchinsky

Forum RI

18 of 21

Meudon le 20 sep 2007

 

SKA – où trouver le milliard?

Europe: 500 MEUR

- UK, NL; FR, IT, S, D

CE, ESO?

France: X0 MEUR

Afrique du Sud / Australie: 300

USA: 200

- Decadal Review 2010-2020

pas avant ~2018

Steve Torchinsky

Forum RI

19 of 21

Meudon le 20 sep 2007

Les défis actuels du projet SKA International

  • Sélection de la meilleure technologie: science/coût

→ Reference Design: réseau phasé au cœur, paraboles autour

  • Sélection du site: Australie ou Afrique du Sud?
  • Structure de gouvernance (financement 1.5 G€)

Décisions sur gouvernance et site par les Agences

Création d’un International SKA Forum d’agences en cours

Liens forts avec Phase Préparatoire FP7 PrepSKA et l’ISSC

  • Construction de la Phase 1 (10% de SKA) en 2014
  • Construction du SKA complet en 2020

Steve Torchinsky

Forum RI

20 of 21

Meudon le 20 sep 2007

SKA – concept de référence

Station:

réseau de paraboles (de 12m?)

avec réseau phasé au foyer

Coeur:

réseau phasé multi-lobes en tuiles

Steve Torchinsky

Forum RI

21 of 21

Square Kilometre Array

Steve Torchinsky�responsible scientifique du projet Européen SKADS

Meudon le 20 sep 2007

Steve Torchinsky

Forum RI