setup MRP Area as

APO Location for Advanced Planning

for Storage Location MRP Control

2 of 91

  1. Missing Storage Location Segment in MRP4 view in S/4 and ECC.
  2. OMIR in S/4 and ECC.
  3. Example for MRP Planning with SLoc Ignore for MRP Planning in ECC.
  4. MMSC in ECC.
  5. Option for SLoc Ignore for MRP in S/4.
  6. Create MRP Area for 1010_0001 for SLoc 0001 (S/4).
  7. Setup MRP Area 1010_0001 for Material M01 (MM02).
  8. Check Stocks at Plant level and MRP Level (MD04).
  9. Run Program /SAPAPO/CREATE_LOCATION (SA38).
  10. Verify APO Location created for the MRP Area (/SAPAPO/MAT1).
  11. Activate Material M01 for Advanced Planning (MM02).
  12. Verify APO Product created for the APO Location for MRP Area (/SAPAPO/MAT1).
  13. Reconcile existing stocks to APO system (/SAPAPO/CCR).
  14. Verify Stocks, S/R List (MD04) and APO Product view (/SAPAPO/RRPE).
  15. Setup MTS Strategy (MM02), PIR (MD61), Plan for the non-MRP Area Storage Locations (Interactive Heuristics).
  16. Conclusion.

3 of 91

check SLoc Segment in MRP4 view for SLoc 101A

S/4 2022/2023

(MM01)

4 of 91

MRP 4 view at SLoc 101A

NO Longer have Storage Location Segment

S/4 2022/2023

(MM01)

5 of 91

S/4 2022/2023

(MMSC)

MMSC in S/4 also no longer have the MRP 4 SLoc segment data

6 of 91

check SLoc Segment in MRP4 view for SLoc 0001

ECC

EhP8

(MM01)

7 of 91

MRP 4 view at SLoc 101A

contain Storage Location segment in ECC

ECC

EhP8

(MM01)

8 of 91

ECC

EhP8

(MM01)

in ECC, the Storage Location segment in MRP4 data view can be used to configure to IGNORE Storage Location stocks for a specific Material for Planning

However, the MRP4 SLoc segment is not longer available in S/4!

9 of 91

  • Missing Storage Location Segment in MRP4 view in S/4 and ECC.
  • OMIR in S/4 and ECC.
  • Example for MRP Planning with SLoc Ignore for MRP Planning in ECC.
  • MMSC in ECC.
  • Option for SLoc Ignore for MRP in S/4.
  • Create MRP Area for 1010_0001 for SLoc 0001 (S/4).
  • Setup MRP Area 1010_0001 for Material M01 (MM02).
  • Check Stocks at Plant level and MRP Level (MD04).
  • Run Program /SAPAPO/CREATE_LOCATION (SA38).
  • Verify APO Location created for the MRP Area (/SAPAPO/MAT1).
  • Activate Material M01 for Advanced Planning (MM02).
  • Verify APO Product created for the APO Location for MRP Area (/SAPAPO/MAT1).
  • Reconcile existing stocks to APO system (/SAPAPO/CCR).
  • Verify Stocks, S/R List (MD04) and APO Product view (/SAPAPO/RRPE).
  • Setup MTS Strategy (MM02), PIR (MD61), Plan for the non-MRP Area Storage Locations (Interactive Heuristics).
  • Conclusion.

10 of 91

S/4 2022/2023

(OMIR)

ECC

EhP8

(MM01)

Menu path to access OMIR for SLoc MRP no longer possible in S/4

Menu path to access OMIR for SLoc MRP

is active and can be used in ECC

11 of 91

S/4 2022/2023

(OMIR)

OMIR for SLoc MRP no longer possible in S/4

t-code OMIR is available in S/4

BUT no longer can be used to configured Material independent SLoc MRP

12 of 91

ECC

EhP8

(OMIR)

SLoc MRP per Plant (Material independent) was available in ECC

13 of 91

ECC

EhP8

(OMIR)

ECC t-code OMIR configure Storage Locations in a Plant for MRP Control

14 of 91

ECC

EhP8

(OMIR)

ECC t-code OMIR configure Storage Locations in a Plant for MRP Control which is Material independent (ie: ALL Materials in this Plant 1000 SLoc 0002 and SLoc 0003 will be ignore)

15 of 91

  • Missing Storage Location Segment in MRP4 view in S/4 and ECC.
  • OMIR in S/4 and ECC.
  • Example for MRP Planning with SLoc Ignore for MRP Planning in ECC.
  • MMSC in ECC.
  • Option for SLoc Ignore for MRP in S/4.
  • Create MRP Area for 1010_0001 for SLoc 0001 (S/4).
  • Setup MRP Area 1010_0001 for Material M01 (MM02).
  • Check Stocks at Plant level and MRP Level (MD04).
  • Run Program /SAPAPO/CREATE_LOCATION (SA38).
  • Verify APO Location created for the MRP Area (/SAPAPO/MAT1).
  • Activate Material M01 for Advanced Planning (MM02).
  • Verify APO Product created for the APO Location for MRP Area (/SAPAPO/MAT1).
  • Reconcile existing stocks to APO system (/SAPAPO/CCR).
  • Verify Stocks, S/R List (MD04) and APO Product view (/SAPAPO/RRPE).
  • Setup MTS Strategy (MM02), PIR (MD61), Plan for the non-MRP Area Storage Locations (Interactive Heuristics).
  • Conclusion.

16 of 91

ECC

EhP8

(OMIR)

17 of 91

Material master MRP4 SLoc segment was used to setup the Material to ignore MRP Planning for the SLoc 0001

ECC

EhP8

(OMIR)

18 of 91

OMIR (via SPRO) can be used to setup Storage Locations to NOT Planned for MRP at the Plant level for ALL Materials in that Plant

ECC

EhP8

(OMIR)

19 of 91

ALL other Storage Location not setup for MRP Ignore either via Material MRP4 view of SPRO OMIR, the Stocks are displayed here and ARE relevant for MRP Planning

ECC

EhP8

(OMIR)

20 of 91

SLoc stock 0004 (100pc) still available for MRP Planning is used for Net Calculation for MRP Planning

Other SLoc setup for Ignore by MRP via:

0001 (via MRP4 SLoc segment)

0002,0003 (via OMIR)

are NOT used for Planning

ECC

EhP8

(OMIR)

21 of 91

  • Missing Storage Location Segment in MRP4 view in S/4 and ECC.
  • OMIR in S/4 and ECC.
  • Example for MRP Planning with SLoc Ignore for MRP Planning in ECC.
  • MMSC in ECC.
  • Option for SLoc Ignore for MRP in S/4.
  • Create MRP Area for 1010_0001 for SLoc 0001 (S/4).
  • Setup MRP Area 1010_0001 for Material M01 (MM02).
  • Check Stocks at Plant level and MRP Level (MD04).
  • Run Program /SAPAPO/CREATE_LOCATION (SA38).
  • Verify APO Location created for the MRP Area (/SAPAPO/MAT1).
  • Activate Material M01 for Advanced Planning (MM02).
  • Verify APO Product created for the APO Location for MRP Area (/SAPAPO/MAT1).
  • Reconcile existing stocks to APO system (/SAPAPO/CCR).
  • Verify Stocks, S/R List (MD04) and APO Product view (/SAPAPO/RRPE).
  • Setup MTS Strategy (MM02), PIR (MD61), Plan for the non-MRP Area Storage Locations (Interactive Heuristics).
  • Conclusion.

22 of 91

ECC

EhP8

23 of 91

ECC

EhP8

Other SLoc setup for Ignore by MRP via:

0001 (via MRP4 SLoc segment)

0002,0003 (via OMIR)

are NOT used for Planning

24 of 91

ECC

EhP8

Other SLoc setup for Ignore by MRP via:

0001 (via MRP4 SLoc segment)

0002,0003 (via OMIR)

are NOT used for Planning

25 of 91

  • Missing Storage Location Segment in MRP4 view in S/4 and ECC.
  • OMIR in S/4 and ECC.
  • Example for MRP Planning with SLoc Ignore for MRP Planning in ECC.
  • MMSC in ECC.
  • Option for SLoc Ignore for MRP in S/4.
  • Create MRP Area for 1010_0001 for SLoc 0001 (S/4).
  • Setup MRP Area 1010_0001 for Material M01 (MM02).
  • Check Stocks at Plant level and MRP Level (MD04).
  • Run Program /SAPAPO/CREATE_LOCATION (SA38).
  • Verify APO Location created for the MRP Area (/SAPAPO/MAT1).
  • Activate Material M01 for Advanced Planning (MM02).
  • Verify APO Product created for the APO Location for MRP Area (/SAPAPO/MAT1).
  • Reconcile existing stocks to APO system (/SAPAPO/CCR).
  • Verify Stocks, S/R List (MD04) and APO Product view (/SAPAPO/RRPE).
  • Setup MTS Strategy (MM02), PIR (MD61), Plan for the non-MRP Area Storage Locations (Interactive Heuristics).
  • Conclusion.

26 of 91

S/4 2022/2023

MM02

27 of 91

To setup SLoc MRP control (Ignore MRP) looks like can only be achieved via

MRP Area

S/4 2022/2023

MM02

28 of 91

  • Missing Storage Location Segment in MRP4 view in S/4 and ECC.
  • OMIR in S/4 and ECC.
  • Example for MRP Planning with SLoc Ignore for MRP Planning in ECC.
  • MMSC in ECC.
  • Option for SLoc Ignore for MRP in S/4.
  • Create MRP Area for 1010_0001 for SLoc 0001 (S/4).
  • Setup MRP Area 1010_0001 for Material M01 (MM02).
  • Check Stocks at Plant level and MRP Level (MD04).
  • Run Program /SAPAPO/CREATE_LOCATION (SA38).
  • Verify APO Location created for the MRP Area (/SAPAPO/MAT1).
  • Activate Material M01 for Advanced Planning (MM02).
  • Verify APO Product created for the APO Location for MRP Area (/SAPAPO/MAT1).
  • Reconcile existing stocks to APO system (/SAPAPO/CCR).
  • Verify Stocks, S/R List (MD04) and APO Product view (/SAPAPO/RRPE).
  • Setup MTS Strategy (MM02), PIR (MD61), Plan for the non-MRP Area Storage Locations (Interactive Heuristics).
  • Conclusion.

29 of 91

this example will focus on SLoc 0001 to 0004 (non WM SLocs)

30 of 91

MRP Area was introduced in ECC4.0 (early 2000) as an alternative (enhanced) method for SLoc MRP for Materials,

the feature continue

to ECC6.0

and at present also in S/4HANA since 1511.

31 of 91

create MRP Area to setup SLoc 0001 to

Ignore MRP for a Material

32 of 91

MRP Area coding is

5 or more Alphanumeric

Assign SLoc 0001 as default Receiving SLoc for MRP Area 1000_0001

Assign one or more SLoc to the MRP Area 1000_0001 (including SLoc 0001)

33 of 91

Assign one or more SLoc to the MRP Area 1000_0001 (including SLoc 0001)

34 of 91

Assign one or more SLoc to the MRP Area 1000_0001 (including SLoc 0001)

35 of 91

  • Missing Storage Location Segment in MRP4 view in S/4 and ECC.
  • OMIR in S/4 and ECC.
  • Example for MRP Planning with SLoc Ignore for MRP Planning in ECC.
  • MMSC in ECC.
  • Option for SLoc Ignore for MRP in S/4.
  • Create MRP Area for 1010_0001 for SLoc 0001 (S/4).
  • Setup MRP Area 1010_0001 for Material M01 (MM02).
  • Check Stocks at Plant level and MRP Level (MD04).
  • Run Program /SAPAPO/CREATE_LOCATION (SA38).
  • Verify APO Location created for the MRP Area (/SAPAPO/MAT1).
  • Activate Material M01 for Advanced Planning (MM02).
  • Verify APO Product created for the APO Location for MRP Area (/SAPAPO/MAT1).
  • Reconcile existing stocks to APO system (/SAPAPO/CCR).
  • Verify Stocks, S/R List (MD04) and APO Product view (/SAPAPO/RRPE).
  • Setup MTS Strategy (MM02), PIR (MD61), Plan for the non-MRP Area Storage Locations (Interactive Heuristics).
  • Conclusion.

36 of 91

Advanced Planning NOT yet activated for Material M01

37 of 91

Assign MRP Area

1010_0001

for Material M01

38 of 91

Assign MRP Area

1010_0001

for Material M01

39 of 91

MRP Area

1010_0001

set MRP Type “ND”

click “Check” “Adopt”

40 of 91

41 of 91

MRP Exists

SAVE

Plant level

MRP Type is “PD”

42 of 91

  • Missing Storage Location Segment in MRP4 view in S/4 and ECC.
  • OMIR in S/4 and ECC.
  • Example for MRP Planning with SLoc Ignore for MRP Planning in ECC.
  • MMSC in ECC.
  • Option for SLoc Ignore for MRP in S/4.
  • Create MRP Area for 1010_0001 for SLoc 0001 (S/4).
  • Setup MRP Area 1010_0001 for Material M01 (MM02).
  • Check Stocks at Plant level and MRP Level (MD04).
  • Run Program /SAPAPO/CREATE_LOCATION (SA38).
  • Verify APO Location created for the MRP Area (/SAPAPO/MAT1).
  • Activate Material M01 for Advanced Planning (MM02).
  • Verify APO Product created for the APO Location for MRP Area (/SAPAPO/MAT1).
  • Reconcile existing stocks to APO system (/SAPAPO/CCR).
  • Verify Stocks, S/R List (MD04) and APO Product view (/SAPAPO/RRPE).
  • Setup MTS Strategy (MM02), PIR (MD61), Plan for the non-MRP Area Storage Locations (Interactive Heuristics).
  • Conclusion.

43 of 91

GR 100pcs for SLoc 0001, 0002, 0003, 0004

44 of 91

notice MRP Area 1010_0001 (SLoc 0001) is displayed separately in MMBE

45 of 91

MRP Area 1010 means

Plant level means any SLoc not assigned to any MRP Area

MRP Type “PD” (at Plant level)

46 of 91

MRP Area

1010_0001 means for SLoc 0001

MRP Type “ND” (No Planning)

47 of 91

  • Missing Storage Location Segment in MRP4 view in S/4 and ECC.
  • OMIR in S/4 and ECC.
  • Example for MRP Planning with SLoc Ignore for MRP Planning in ECC.
  • MMSC in ECC.
  • Option for SLoc Ignore for MRP in S/4.
  • Create MRP Area for 1010_0001 for SLoc 0001 (S/4).
  • Setup MRP Area 1010_0001 for Material M01 (MM02).
  • Check Stocks at Plant level and MRP Level (MD04).
  • Run Program /SAPAPO/CREATE_LOCATION (SA38).
  • Verify APO Location created for the MRP Area (/SAPAPO/MAT1).
  • Activate Material M01 for Advanced Planning (MM02).
  • Verify APO Product created for the APO Location for MRP Area (/SAPAPO/MAT1).
  • Reconcile existing stocks to APO system (/SAPAPO/CCR).
  • Verify Stocks, S/R List (MD04) and APO Product view (/SAPAPO/RRPE).
  • Setup MTS Strategy (MM02), PIR (MD61), Plan for the non-MRP Area Storage Locations (Interactive Heuristics).
  • Conclusion.

48 of 91

CIF (Core-Interface) used in Classic APO-ECC no longer used to create APO Location (for Plant and MRP Area) in S/4 HANA 2022/2023

49 of 91

in SA38,

run this Program to Create APO Location for new Plants and

new MRP Areas

50 of 91

51 of 91

MRP Area 1010_0001

now extended to

Advanced Planning as

APO Location 1010_001

52 of 91

  • Missing Storage Location Segment in MRP4 view in S/4 and ECC.
  • OMIR in S/4 and ECC.
  • Example for MRP Planning with SLoc Ignore for MRP Planning in ECC.
  • MMSC in ECC.
  • Option for SLoc Ignore for MRP in S/4.
  • Create MRP Area for 1010_0001 for SLoc 0001 (S/4).
  • Setup MRP Area 1010_0001 for Material M01 (MM02).
  • Check Stocks at Plant level and MRP Level (MD04).
  • Run Program /SAPAPO/CREATE_LOCATION (SA38).
  • Verify APO Location created for the MRP Area (/SAPAPO/MAT1).
  • Activate Material M01 for Advanced Planning (MM02).
  • Verify APO Product created for the APO Location for MRP Area (/SAPAPO/MAT1).
  • Reconcile existing stocks to APO system (/SAPAPO/CCR).
  • Verify Stocks, S/R List (MD04) and APO Product view (/SAPAPO/RRPE).
  • Setup MTS Strategy (MM02), PIR (MD61), Plan for the non-MRP Area Storage Locations (Interactive Heuristics).
  • Conclusion.

53 of 91

MRP Area created as APO Location 1010_001 as (Ignore Location Type 1001.. see next slide)

54 of 91

MRP Area created as APO Location 1010_001 as Location Type 1007

55 of 91

56 of 91

  • Missing Storage Location Segment in MRP4 view in S/4 and ECC.
  • OMIR in S/4 and ECC.
  • Example for MRP Planning with SLoc Ignore for MRP Planning in ECC.
  • MMSC in ECC.
  • Option for SLoc Ignore for MRP in S/4.
  • Create MRP Area for 1010_0001 for SLoc 0001 (S/4).
  • Setup MRP Area 1010_0001 for Material M01 (MM02).
  • Check Stocks at Plant level and MRP Level (MD04).
  • Run Program /SAPAPO/CREATE_LOCATION (SA38).
  • Verify APO Location created for the MRP Area (/SAPAPO/MAT1).
  • Activate Material M01 for Advanced Planning (MM02).
  • Verify APO Product created for the APO Location for MRP Area (/SAPAPO/MAT1).
  • Reconcile existing stocks to APO system (/SAPAPO/CCR).
  • Verify Stocks, S/R List (MD04) and APO Product view (/SAPAPO/RRPE).
  • Setup MTS Strategy (MM02), PIR (MD61), Plan for the non-MRP Area Storage Locations (Interactive Heuristics).
  • Conclusion.

57 of 91

Activate Material for

Advanced Planning

58 of 91

  • Missing Storage Location Segment in MRP4 view in S/4 and ECC.
  • OMIR in S/4 and ECC.
  • Example for MRP Planning with SLoc Ignore for MRP Planning in ECC.
  • MMSC in ECC.
  • Option for SLoc Ignore for MRP in S/4.
  • Create MRP Area for 1010_0001 for SLoc 0001 (S/4).
  • Setup MRP Area 1010_0001 for Material M01 (MM02).
  • Check Stocks at Plant level and MRP Level (MD04).
  • Run Program /SAPAPO/CREATE_LOCATION (SA38).
  • Verify APO Location created for the MRP Area (/SAPAPO/MAT1).
  • Activate Material M01 for Advanced Planning (MM02).
  • Verify APO Product created for the APO Location for MRP Area (/SAPAPO/MAT1).
  • Reconcile existing stocks to APO system (/SAPAPO/CCR).
  • Verify Stocks, S/R List (MD04) and APO Product view (/SAPAPO/RRPE).
  • Setup MTS Strategy (MM02), PIR (MD61), Plan for the non-MRP Area Storage Locations (Interactive Heuristics).
  • Conclusion.

59 of 91

Material M01

extended to

APO Location 1010

60 of 91

Material M01

extended to

APO Location 1010_0001

61 of 91

  • Missing Storage Location Segment in MRP4 view in S/4 and ECC.
  • OMIR in S/4 and ECC.
  • Example for MRP Planning with SLoc Ignore for MRP Planning in ECC.
  • MMSC in ECC.
  • Option for SLoc Ignore for MRP in S/4.
  • Create MRP Area for 1010_0001 for SLoc 0001 (S/4).
  • Setup MRP Area 1010_0001 for Material M01 (MM02).
  • Check Stocks at Plant level and MRP Level (MD04).
  • Run Program /SAPAPO/CREATE_LOCATION (SA38).
  • Verify APO Location created for the MRP Area (/SAPAPO/MAT1).
  • Activate Material M01 for Advanced Planning (MM02).
  • Verify APO Product created for the APO Location for MRP Area (/SAPAPO/MAT1).
  • Reconcile existing stocks to APO system (/SAPAPO/CCR).
  • Verify Stocks, S/R List (MD04) and APO Product view (/SAPAPO/RRPE).
  • Setup MTS Strategy (MM02), PIR (MD61), Plan for the non-MRP Area Storage Locations (Interactive Heuristics).
  • Conclusion.

62 of 91

Since Stocks (MRP Elements) exists in the Classic Planning environment before “Advanced Planning” Activation, run this Program to Reconcile all MRP Elements to the Advanced Planning environnement

63 of 91

Enter the current S/4 System

64 of 91

Reconcile SLoc Stocks from the Classic Planning environment to APO Planning environment

65 of 91

Reconcile Stock for the new Material M01 for all SLoc

66 of 91

67 of 91

Reconciled

68 of 91

  • Missing Storage Location Segment in MRP4 view in S/4 and ECC.
  • OMIR in S/4 and ECC.
  • Example for MRP Planning with SLoc Ignore for MRP Planning in ECC.
  • MMSC in ECC.
  • Option for SLoc Ignore for MRP in S/4.
  • Create MRP Area for 1010_0001 for SLoc 0001 (S/4).
  • Setup MRP Area 1010_0001 for Material M01 (MM02).
  • Check Stocks at Plant level and MRP Level (MD04).
  • Run Program /SAPAPO/CREATE_LOCATION (SA38).
  • Verify APO Location created for the MRP Area (/SAPAPO/MAT1).
  • Activate Material M01 for Advanced Planning (MM02).
  • Verify APO Product created for the APO Location for MRP Area (/SAPAPO/MAT1).
  • Reconcile existing stocks to APO system (/SAPAPO/CCR).
  • Verify Stocks, S/R List (MD04) and APO Product view (/SAPAPO/RRPE).
  • Setup MTS Strategy (MM02), PIR (MD61), Plan for the non-MRP Area Storage Locations (Interactive Heuristics).
  • Conclusion.

69 of 91

70 of 91

Plant level

SLoc without MRP Area

MRP Area 1010_0001

SLoc 0001

71 of 91

check equivalent to MD04 S/R List for APO

72 of 91

Product View of Location 1010 (Plant level)

73 of 91

Stocks for all non-MPR Area

74 of 91

Product View of Location 1010_0001 (MRP Area for SLoc 0001)

75 of 91

Stocks for all MPR Area

1010_0001

ie: SLoc 0001

76 of 91

  • Missing Storage Location Segment in MRP4 view in S/4 and ECC.
  • OMIR in S/4 and ECC.
  • Example for MRP Planning with SLoc Ignore for MRP Planning in ECC.
  • MMSC in ECC.
  • Option for SLoc Ignore for MRP in S/4.
  • Create MRP Area for 1010_0001 for SLoc 0001 (S/4).
  • Setup MRP Area 1010_0001 for Material M01 (MM02).
  • Check Stocks at Plant level and MRP Level (MD04).
  • Run Program /SAPAPO/CREATE_LOCATION (SA38).
  • Verify APO Location created for the MRP Area (/SAPAPO/MAT1).
  • Activate Material M01 for Advanced Planning (MM02).
  • Verify APO Product created for the APO Location for MRP Area (/SAPAPO/MAT1).
  • Reconcile existing stocks to APO system (/SAPAPO/CCR).
  • Verify Stocks, S/R List (MD04) and APO Product view (/SAPAPO/RRP3).
  • Setup MTS Strategy (MM02), PIR (MD61), Plan for the non-MRP Area Storage Locations (Interactive Heuristics).
  • Conclusion.

77 of 91

MTS Strategy at the Plant level for Plant level also applied for All MRP Area (but note that MRP Area 1010_0001 with MRP Type “ND” while Plant level MRP Type is “PD”

78 of 91

MRP Area can be entered here, but this example to enter PIR at the Plant level which will not appear in the MRP Area planning

79 of 91

PIR at the Plant level

80 of 91

PIR created at Plant level is not relevant for this MRP Area

PIR created at Plant level is only relevant for Plant level

This SLoc (MRP Area) is NOT Planned (or Ignore for Planning) unless PIR is created for the MRP Area and the MRP Area is assigned with valid MRP Type

81 of 91

No Planning for APO Location 1010_0001

82 of 91

Shortage at Location 1010 (Plant level) for the PIR created at the Plant level

83 of 91

84 of 91

Run the “Product Heuristic”

85 of 91

86 of 91

Product Heuristics executed for the Material at Plant level

87 of 91

PRs created (no Planned Orders for External Procurement) via Product Heuristics

88 of 91

  • Missing Storage Location Segment in MRP4 view in S/4 and ECC.
  • OMIR in S/4 and ECC.
  • Example for MRP Planning with SLoc Ignore for MRP Planning in ECC.
  • MMSC in ECC.
  • Option for SLoc Ignore for MRP in S/4.
  • Create MRP Area for 1010_0001 for SLoc 0001 (S/4).
  • Setup MRP Area 1010_0001 for Material M01 (MM02).
  • Check Stocks at Plant level and MRP Level (MD04).
  • Run Program /SAPAPO/CREATE_LOCATION (SA38).
  • Verify APO Location created for the MRP Area (/SAPAPO/MAT1).
  • Activate Material M01 for Advanced Planning (MM02).
  • Verify APO Product created for the APO Location for MRP Area (/SAPAPO/MAT1).
  • Reconcile existing stocks to APO system (/SAPAPO/CCR).
  • Verify Stocks, S/R List (MD04) and APO Product view (/SAPAPO/RRP3).
  • Setup MTS Strategy (MM02), PIR (MD61), Plan for the non-MRP Area Storage Locations (Interactive Heuristics).
  • Conclusion.

89 of 91

PPDS generated PR is now in S/R List for Plant level 1010

90 of 91

Since no Planning decided for the MRP Area 1010_0001 (SLoc 0001) and PIR or Sales Order etc will not be created for the MRP Area or SLoc 0001, no Planning here in this case