1 of 61

PLANSWIFT TAKE-OFF

​

​

​

1

STANDARD OPERATION PROCEDURE

​

1

2 of 61

TABLE OF CONTENTS

  1. STARTING PLANSWIFT
  2. TEMPLATES
  3. SCALING
  4. TAKE OFF
  5. DETAILS
  6. ESTIMATING
  7. PRINTING REPORTS
  8. SENDING TO BEN

​

2

SOP on PSTO

PRESENTATION NAME

3 of 61

At Paydirt, accuracy and efficiency are critical in our estimation process. This SOP ensures a standardized approach to using PlanSwift, allowing us to perform precise takeoffs, streamline workflows, and deliver reliable estimates to our clients.

In this session, we will walk through the step-by-step process, from reviewing project plans to generating takeoff reports, ensuring that every team member follows best practices for consistency and accuracy.

323

3

4 of 61

  1. Access Email: Open your email to find the latest message with bid details from the contractor or manager.
  2. Gather Key Details: Identify essential information such as:
    • Contractor’s Company Name
    • Project Name
    • Assigned Team Member
    • Submission Due Date
  3. Download and Save Plan Set:
    • Locate the attachment or link for the plan set at the end of the email.
    • Download and save the file using the naming format: [Contractor’s Company Name - Project Name] for consistency and ease of access.

323

Locating your Project Assignment

4

5 of 61

STARTING PLANSWIFT

Knowing your tools

Scope: Erosion Control, Demolition, Stormwater Management, Water Services, Sewer Services, Curb and Gutter Installation

​

​

STARTING PLANSWIFT

Top Toolbar: It houses all the essential tools like Point, Line, Area, Segment, Modify, Settings, and others for interacting with project plans.

​

Templates Sidebar: On the right, the Templates sidebar is visible, which lists predefined templates for different project elements such as Curb and Gutter, Erosion Control, Foundations, etc. Each template can be used to quickly apply common attributes and calculations to drawings.

​

Properties Dialog Box: The dialog box open in the center, labeled 'Properties - Area Item', is where specific properties for selected items are adjusted. Here, you can modify item name, set unit cost, and enter formulas for automatic calculations.

​

Work Area: The central part of the screen displays the work area where the actual plans can be viewed and edited.

​

6

6 of 61

Uploading the PDF File:

  • Go to 'File' in the top menu, select 'Import,' then choose 'PDF.' Navigate to the file location, select your file, and click 'Open' to upload it into PlanSwift.

Creating Folders for Each Scope:

  • Right-click on the 'Estimates' tab or appropriate project name on the left side panel. Select 'New Folder' and name it according to the scope, like 'Demolition' or 'Foundation.'

Creating Sub-Items for Folders:

  • Within the created folders, right-click and choose 'New Part.' Name each part to organize different tasks or materials related to the scope.

​

​

7

Setting Up Folders for Project Scopes, Main Items, and Sub-Items for Activities Under Each Scope

7 of 61

Create a New Project

  • Add New Job - fill out tabs and description. You can use Company name - Project name

Import the Drawings

  • In the open job, right-click in the 'Job Tree' area and select 'Import Plans'. This option allows you to add your PDF or CAD files.
  • Browse to locate your files, select them, and then click to import.

Rename Imported Plans:

  • Name each sheet according to its specific content, using clear and descriptive titles like "Storm Sewer," "Sanitary Sewer," "Water Main," "Demolition," "Erosion Control."

323

Step 2 - Setting Up a New Project in PlanSwift

​

5

8 of 61

For each part, set up the formulas that will calculate the quantity needed.

For example:

    • Silt Fence: (Length of Disturbed Area / Length of Fence Roll) * Number of Tiers
    • Erosion Blankets: (Total Area to be Covered / Area Covered per Roll)
  • Enter these formulas in the ‘Calculation’ field for each part.

Input Unit Costs

  • Add cost information for each material in the ‘Properties’ panel. Include costs per unit length for items like silt fences or per roll for erosion blankets.
  • Also, incorporate labor costs associated with the installation of each material.

Assigning Properties

  • For accurate measurements, assign properties such as length, width, and unit cost directly in the parts setup. This ensures that when you measure an area or a line on the plan, PlanSwift calculates the total cost and quantity needed based on your inputs.

Use the Measurement Tools

  • Go to the plan area in your project. Select the appropriate measurement tool (e.g., linear for silt fences or area for erosion blankets) from the toolbar.
  • Measure the required lengths or areas directly on your digital plans where the erosion control measures will be implemented.

​

HOW TO PUT FORMULAS INSIDE A FOLDER -

  • EROSION CONTROL

​

9 of 61

​

Formula:

  • Pipe Volume=π×(Diameter÷2)2 (squared) ○

Example: A 100’ long, 36” pipe: π×(36/12÷2)2×100=282.74

    • cubic feet Convert to cubic yards: 282.74÷27=10.47 CY ○

​

  • Bedding: Assume 6” of #57 stone unless specified. ○

Formula: Bedding Volume=(Trench Width)×(Bedding Thickness)×(Pipe Length) ○

Example: For a 36” pipe with a 4.5’ trench width over 100’: 4.5×0.5×100=225 cubic feet / 8.33 CY

HOW TO PUT FORMULAS INSIDE A FOLDER

Pipe Displacement Calculation:

​

​

10 of 61

​

p.8

Creating Sub-items in a folder under your scopes

  1. Create the Main Folder ("DEMOLITION")

In the Takeoff Items Window (usually found on the left or bottom of the screen):

    • Right-click anywhere inside the window.
    • Select New Folder.
    • Name it DEMOLITION and press Enter
  • Add Sub-Folders & Sub-Items Under "DEMOLITION"

A. Creating "DEMO - EXISTING PIPE"

  1. Right-click DEMOLITION, select New Folder.
  2. Name it DEMO - EXISTING PIPE.
  3. Right-click DEMO - EXISTING PIPE, select New Condition.
  4. Name it EXCAVATED VOLUME.

B. Creating "DEMO - ASPHALT"

  1. Right-click DEMOLITION, select New Folder.
  2. Name it DEMO - ASPHALT.
  3. Right-click DEMO - ASPHALT, select New Condition.
  4. Name it EXCAVATED VOLUME.

C. Creating "DEMO STRUCTURE" and Its Sub-Items

  1. Right-click DEMOLITION, select New Folder.
  2. Name it DEMO STRUCTURE.
  3. Right-click DEMO STRUCTURE, select New Condition, and create the following items one by one:
    • FOOTING VOLUME
    • DEBRIS VOLUME
    • HEIGHT ABOVE GROUND
    • BUILDING DIMENSION
    • SLAB CONCRETE VOLUME
    • SLAB BASE
    • SLAB REINFORCEMENT

4. Save and Organize

  • After adding all sub-items, save the project. You can drag and drop items if you need to rearrange them.

​

11 of 61

Backfill Calculation:

  • Formula for Backfill Volume: To find the amount of backfill needed, subtract both the pipe volume and the bedding volume from the total trench volume.

  • Backfill:
    • ○ Subtract pipe displacement and bedding from trench volume: Backfill Volume=(Trench Volume)−(Pipe Volume+Bedding Volume)

Excavated Volume: ○

Formula: Trench Volume=Trench Width×Trench Depth×Trench Length

Assume: ■ Trench Depth: Pipe invert depth + pipe diameter + 6” bedding. ■ Trench Width: Pipe diameter + 2’ on each side (default if no specs).

​

HOW TO PUT FORMULAS INSIDE A FOLDER

Backfill Calculation:

​

​

12 of 61

Trench Sizing Calculation

1. Depth Calculation:

  • Depth Components: Use pipe invert depth plus pipe diameter and 6” bedding.
  • Width: Pipe diameter + 2’ on each side unless otherwise specified

​

  • ​

​

HOW TO PUT FORMULAS INSIDE A FOLDER

TRENCH SIZE

​

​

13 of 61

Pavement Asphalt Patches for Utility Installations

Calculating Patches: Measure patch width and length from utility trench dimensions (e.g., trench width + 2’ on each side).

    • Example: For a 100’ long trench with a 4.5’ width:
      1. (4.5+2+2)×100=850 sq ft - convert to CYU w/ thickness ○

​

Special Considerations: ○

    • Asphalt patches in public roadways typically cost more due to:
      • ■ Additional compaction requirements.
      • ■ Traffic control costs (flaggers, barricades, signage).

​

  • ​

​

HOW TO PUT FORMULAS INSIDE A FOLDER

ASPHALT PAVEMENT PATCHES

​

​

14 of 61

Base Material: Base material, typically #57 stone or sand, provides a stable and level foundation for underground structures, helping to distribute loads and protect against damage from soil movement.

  • Assumption for Bedding: Unless otherwise specified by project requirements, assume a uniform bedding thickness of 6 inches.
  • Volume=(Length of Structure)×(Width of Structure)×(Bedding Thickness)

​

HOW TO PUT FORMULAS INSIDE A FOLDER

Underground Structures

Bedding and Backfill Calculations

​

​

15 of 61

Backfill Around Structures: Backfill provides support to underground structures, fills the excavation, and helps maintain the surrounding soil's stability.

  • Calculate backfill volume by subtracting structure volume from excavated volume.

​

HOW TO PUT FORMULAS INSIDE A FOLDER

Underground Structures

​

​

16 of 61

  • Storm Underground Storage Systems (USS) 1. Excavated Volume: Volume=(Trench Length)×(Trench Width)×(Trench Depth)
  • 2. Backfill Volume: Subtract total system volume (pipes, chambers) and bedding from excavation volume.
  • 3. Bedding: Use 6” of #57 stone across the system area.
  • 4. System Displacement: Use the pipe/chamber volume formula to determine displacement

​

HOW TO PUT FORMULAS INSIDE A FOLDER

Underground Structures

Storm Underground Storage System

�

​

​

​

​

17 of 61

​

  • Right-click on the "Curb and Gutter" folder.
  • Select ‘Add Part’ or ‘Add Assembly’ depending on the complexity of the formula you wish to add.
    • Add Part is used for simple calculations.
    • Add Assembly is used for more complex calculations involving multiple parts.

Define the Formulas

  • In the part or assembly creation window, input the name of the formula, such as "Concrete Volume Calculation".
  • Enter the necessary calculation parameters and formulas in the provided fields. This could involve dimensions, material properties, or cost factors that are relevant to the curb and gutter work.

Save Your Formulas

  • After inputting all the necessary information and formulas, click ‘OK’ to save the part or assembly into the "Curb and Gutter" folder.
  • Ensure that all information is correctly entered and saved within the folder.

​

HOW TO PUT FORMULAS INSIDE A FOLDER -

CURB AND GUTTER

​

18 of 61

Define Custom Properties

  • Right-click on your takeoff and select ‘Properties.’
  • Under ‘Custom Properties,’ add fields for Length, Width, Height, and Debris Factor.
  • Enter a default debris factor of 0.33, adjustable based on project specifics (e.g., 0.25 for large open areas).

Input Formulas for Volume and Tonnage

  • Set up a formula to calculate debris volume: Length * Width * Height * Debris Factor
  • Add another formula to convert this volume to tonnage: Debris Volume / 27 * 0.25 (since 0.25 tons per cubic yard is typical).

​

​

HOW TO PUT FORMULAS INSIDE A FOLDER -

DEMOLITION

19 of 61

Input Formulas for Volume and Tonnage

  • Set up a formula to calculate debris volume: Length * Width * Height * Debris Factor
  • Add another formula to convert this volume to tonnage: Debris Volume / 27 * 0.25 (since 0.25 tons per cubic yard is typical).

​

​

HOW TO PUT FORMULAS INSIDE A FOLDER

DEMOLITION

​

20 of 61

HOW TO PUT FORMULAS INSIDE A FOLDER -

FOUNDATION

21 of 61

  • ​
    1. ​

HOW TO PUT FORMULAS INSIDE A FOLDER -

STORM, SEWER AND WATER

​

Access Templates: In the Templates tab on the right side, find or create a new template for your utility type, such as water or sewer.

​

Customize Your Template: Click on the template you want to use. Customize it by adding specific items and details like size, material, and unit costs.

This is similar to the 'PVC SDR35 SANITARY' shown in your image, which has attributes like outside diameter, cost per foot, and other specifications pre-filled.

22 of 61

HOW TO PUT FORMULAS INSIDE A FOLDER -

STORM, SEWER AND WATER

23 of 61

RENAMING YOUR FOLDER

24 of 61

RENAMING YOUR FOLDER

25 of 61

Set the Known Dimension

  • On the plan, identify a known measurement.
  • Click at the starting point of this known dimension, then click at the end point.

Enter the Real-World Measurement

  • After selecting the two points, a dialog box will appear where you can enter the actual length of the dimension as it should be in reality. For example, if the dimension is a 100-foot wall, you would enter '100 feet'.
  • Ensure you select the correct unit of measurement (feet, meters, etc.) according to the specifications of your project.

Confirm and Apply the Scale

  • Once the real-world dimension is entered, click ‘OK’ or 'Apply' to set the scale for the entire plan.
  • PlanSwift will now scale all measurements based on the dimension you set.

Verify the Scale

  • To ensure accuracy, use the measuring tool to check other known dimensions on the plan. If they match their expected real-world sizes, the scale is set correctly.
  • If there is a discrepancy, repeat the scaling process to adjust.

​

​

Scaling the paper

26 of 61

Create a New Takeoff

  • Go to the ‘Estimating’ tab.
  • Right-click on an empty space or an existing folder where you want to organize your takeoff data and select ‘New’ -> ‘Area’ or ‘Linear’, depending on the nature of the curb and gutter work. Linear is typically used for curb and gutter.

Name and Set Up Your Takeoff Item

  • Name the new takeoff item, e.g., "Curb and Gutter".
  • Set the properties, such as material type and dimensions, that will be used to calculate the quantities. You can specify the width and depth of the curb and gutter if necessary.

Start the Takeoff

  • Choose the ‘Linear’ tool from the toolbar to begin measuring.
  • Click at the start point of the curb on your plan, then click along its path wherever the direction changes, and double-click at the end point to finish.
  • As you click, PlanSwift calculates the linear feet or meters automatically.

Enter Details

  • Once you’ve traced the curb and gutter, enter specific details in the ‘Properties’ panel that will affect the cost calculation, such as:
    • Concrete volume per linear foot/meter.
    • Cost per unit of material.
    • Labor hours required per unit.

​

7

Taking off - Curb and Gutter

27 of 61

Key Erosion Control Measures and Calculations

A. Silt Fences

  • Measure the linear footage required along the perimeters of disturbed areas where silt fences will be installed to control sediment runoff.
  • Stake Spacing: Install stakes typically every 6 to 8 feet along the fence to ensure stability and effectiveness.

B. Inlet Protection

  • Count the number of stormwater inlets that need protection to prevent sediment entry.
  • Calculate the perimeter or area around these inlets to determine the quantity of protective materials needed, such as silt socks or gravel bags.

C. Erosion Control Matting

  • Measure the areas of slopes that require erosion control matting to stabilize soil.
  • Ensure there is a 6-12 inch overlap between rows of matting to prevent gaps.
  • Stake Requirement: Place stakes every 2 to 3 feet along the mat edges and at centerline intervals for secure installation.

D. Temporary Sediment Basins

  • Calculate the volume of excavation required to create sediment basins and the volume for any berms.
  • Design basins to facilitate easy sediment removal once they reach 50% capacity, ensuring continued effectiveness.

​

Taking off - EROSION CONTROL ITEMS

28 of 61

Temporary Sediment Basins

  • Calculate the volume of excavation required to create sediment basins and the volume for any berms.
  • Design basins to facilitate easy sediment removal once they reach 50% capacity, ensuring continued effectiveness.

Check Dams, Diversion Dikes, and Wattles

  • Measure the length of areas requiring check dams, diversion dikes, or wattles to control water flow and sediment on slopes.
  • Calculate the required materials and include any necessary stakes, stone, or other materials for stabilization.

Mulching and Seeding

  • Measure the total area of disturbed soil that needs stabilization post-construction.
  • Material Coverage: Apply mulch at a rate of 2 tons per acre and choose a seed mix based on project specifications to promote vegetation

​

​

Taking off - EROSION CONTROL ITEMS

29 of 61

​

​

Taking off - EROSION CONTROL ITEMS

30 of 61

7

Taking off - DEMOLITION ITEMS

31 of 61

Demolition Takeoffs

A. Structure/Building Demolition ● Calculate debris volume (Length × Width × Height × Debris Factor 0.33). ● Use .25 debris factor if large open area such as warehouse ● Convert debris to tonnage (0.25 tons per CY typical).

B. Slab and Footer Removal ● Slab: Measure area and thickness (e.g., Length×Width×Thickness / 27 to get CYU) ● Footer: Assume 2’ x 3’ around perimeter unless specified.

C. Backfill for Demolished Footers ● Calculate backfill volume using footer dimensions. Include compaction.

TAKING OFF

Demolition Items

�

​

​

​

​

​

32 of 61

Define Areas for Storm Water and Sewer

  • Use the ‘Area’ tool for defining areas where storm water and sewer systems will be placed.
  • Click on the starting point and trace around the area you want to calculate. Repeat this for all relevant areas.

5. Linear Takeoffs for Pipes

  • Select the ‘Linear’ tool to measure the length of storm water and sewer pipes.
  • Click at the start point of a pipe and click again at the end point. Continue this process along the pipe route.

Taking off - STORM, SEWER and WATER ITEMS

33 of 61

The purpose of the project takeoff Word document is to efficiently record and present project details to clients. It ensures accuracy and clarity, facilitating transparent communication about project scope and requirements. The template streamlines progress tracking and updates, which are crucial for meeting client expectations and deadlines. Its standardized format promotes consistency in reporting and can be adapted for future projects, saving time and enhancing professionalism in client submissions.

7

TAKING DOWN NOTES (FINDING DETAILS ON CIVIL PLAN) -

Setting-up Word File

34 of 61

TAKING DOWN NOTES (FINDING DETAILS ON CIVIL PLAN) -

Setting-up Word File

35 of 61

TAKING DOWN NOTES (FINDING DETAILS ON CIVIL PLAN) -

CURB AND GUTTER

36 of 61

TAKING DOWN NOTES (FINDING DETAILS ON CIVIL PLAN) -

EROSION CONTROL

37 of 61

TAKING DOWN NOTES (FINDING DETAILS ON CIVIL PLAN) -

DEMOLITION STRUCTURE

38 of 61

TAKING DOWN NOTES (FINDING DETAILS ON CIVIL PLAN) -

SEWER I

39 of 61

TAKING DOWN NOTES (FINDING DETAILS ON CIVIL PLAN) -

SEWER II

40 of 61

TAKING DOWN NOTES (FINDING DETAILS ON CIVIL PLAN) -

STORM

41 of 61

ESTIMATING (BASE ON THE NOTES)

GETTING THE CYU FOR CURB AND GUTTER

​

​

42 of 61

ESTIMATING (BASE ON THE NOTES)

GETTING THE CYU FOR CURB AND GUTTER

​

​

43 of 61

ESTIMATING (BASE ON THE NOTES)

GETTING THE CYU FOR Construction Entrance

​

​

44 of 61

ESTIMATING (BASE ON THE NOTES)

GETTING THE CYU FOR Demo Structure

​

45 of 61

ESTIMATING (BASE ON THE NOTES)

GETTING THE CYU FOR Storm

46 of 61

ESTIMATING (BASE ON THE NOTES)

GETTING THE CYU FOR SEWER

47 of 61

ESTIMATING (BASE ON THE NOTES)

GETTING THE CYU FOR WATER

48 of 61

ESTIMATING (BASE ON THE NOTES)

DOUBLE CHECKING BEFORE PRINTING

49 of 61

PRINTING REPORTS FOR SUBMISSION

PRINTING ESTIMATING REPORTS IN EXCEL FORMAT

50 of 61

PRINTING REPORTS FOR SUBMISSION

PRINTING MARKED UP TAKEOFFS

51 of 61

PRINTING REPORTS FOR SUBMISSION

PRINTING PLANSWIFT REPORTS

52 of 61

PRINTING REPORTS FOR SUBMISSION

PRINTING & EDITING EXCEL REPORT

53 of 61

Select all the files you want to include in your submission.

Right-click on the selected files, choose "Send to," and then select "Compressed (zipped) folder."

Name the zip file following the format >>> Client - Project Name -PSTO

​

PRINTING REPORTS FOR SUBMISSION

COMPRESSING REPORTS INTO ZIP

54 of 61

SENDING YOUR FINAL OUTPUT

55 of 61

Define Custom Properties

  • Right-click on your takeoff and select ‘Properties.’
  • Under ‘Custom Properties,’ add fields for Length, Width, Height, and Debris Factor.
  • Enter a default debris factor of 0.33, adjustable based on project specifics (e.g., 0.25 for large open areas).

Input Formulas for Volume and Tonnage

  • Set up a formula to calculate debris volume: Length * Width * Height * Debris Factor
  • Add another formula to convert this volume to tonnage: Debris Volume / 27 * 0.25 (since 0.25 tons per cubic yard is typical).

​

​

Slab & Footer Removal and C. Backfill for Demolished Footers

​

56 of 61

  • Under "EROSION CONTROL," locate or create the "Construction Entrance" sub-item if it’s not already there.

Step 2: Add or Select the Stone Volume Item

  • If "Stone Volume" is not already listed under "Construction Entrance," right-click on "Construction Entrance," choose 'New' > 'Item', and name it "STONE VOLUME."
  • Select "STONE VOLUME" by clicking on it.

Step 3: Define Properties for Stone Volume

  • With "STONE VOLUME" selected, access its properties by right-clicking and selecting ‘Properties’.
  • In the Properties window, you might want to set up custom properties first, such as Area and Depth, which are needed for the volume calculation.

​

Structural Erosion Control

57 of 61

. Slab and Footer Removal

  1. Set Up Slab Takeoff
    • Use the ‘Area’ takeoff tool for measuring the slab area.
    • Add properties for Length, Width, and Thickness.
    • Formula for cubic yards (CYU): Length * Width * Thickness / 27
  2. Set Up Footer Takeoff
    • Typically, footers run around the perimeter, so use a ‘Linear’ takeoff tool.
    • Add custom properties for default dimensions (e.g., 2 feet by 3 feet depth unless specified).
    • Use formula: Linear Length * 2 * 3 / 27 for CYU.

C. Backfill for Demolished Footers

  1. Backfill Volume Calculation
    • Assuming backfill uses the same dimensions as the footer removal:
    • Use the same ‘Linear’ takeoff or duplicate the footer takeoff.
    • Change the formula to reflect backfill material specifics, which might differ in density or compaction from removed footer material.

General Configuration Tips

  • Utilize Layers: Organize different demolition components into layers for easy visibility and management.

​

Setup for Demolition and Foundation

58 of 61

​

  • Instructions:
    1. After setting up your item and formulas, save these settings as a template for future use.
    2. Navigate to the Templates Pane to save and manage these settings.

Using Templates and Saving Work

​

59 of 61

Step 4: Input the Formula for Stone Volume

  • Click on the 'Advanced' tab within the Properties window.
  • Input the formula for volume calculation. Assuming you measure area in square feet and depth in feet, the formula might be:�mathematica�Copy�Volume = Area * Depth / 27
  • This formula calculates the volume in cubic yards, given that one cubic yard is 27 cubic feet.

Step 5: Add or Select the Excavated Volume Item

  • Similarly, add a new item named "EXCAVATED VOLUME" under "Construction Entrance" if it doesn’t exist.
  • Select it and open its properties.

Step 6: Define Properties for Excavated Volume

  • Define relevant properties such as Excavation Length, Width, and Depth.

Step 7: Input the Formula for Excavated Volume

  • In the 'Advanced' tab, input the excavation volume formula. If you’re considering straight excavation without accounting for any bulking or shrinkage factors, it would typically be:�mathematica�Copy�Excavated Volume = Length * Width * Depth / 27

​

Renaming the folder

60 of 61

Setting Up a New Project in PlanSwift

​

Create a New Project:

Go to the ‘File’ menu and select ‘New.’

Enter the Project Name and Contractor’s Company Name as described in the email.

Select the appropriate Template if applicable.

Import the Plan Set:

Go to the ‘File’ menu, select ‘Import,’ and choose the saved plan set file.

Confirm that the plan set is correctly loaded into the software.

“

PRESENTATION NAME

61 of 61

Scaling Quantities Step 4: Performing the Takeoff

​

​

  1. Use the ‘Takeoff’ tool to begin measuring and quantifying materials and areas.
  2. Input Quantities into the software, categorizing them under the respective layers.
  3. Review and Adjust any measurements or quantities to ensure accuracy.

​

“

PRESENTATION NAME