PPD APACC
REACCREDITATION 2023
#Platinum4PPD
CRITERION 6
OTHER RESOURCES
2
3
6.1
6.3
6.5
6.5
6.4
6.2
Financial Resources
Library
Information & Communication
Technology
Physical
Facilities
Tools &
Equipment
Repair & Maintenance Management
CRITERION 6: OTHER RESOURCES
INDICATOR
4
Mohamad Zamri Bin Muhamad
WGL
Shah Rizal Bin Zainal
Assistant WGL
Noor Azua Mohd Bahatera
Secretary
Nursuria binti Zainon
6.4 Tools and Equipment
CRITERION 6: OTHER RESOURCES
Norlaila Binti Nordin
6.1 Financial Resources
Nur Marlia Binti Jaafar
6.2 Physical Facilities
Marwanul Hakim Bin Mohd Noh
6.3 Library
Komathi A/P Krisnan
6.5 Information and Communication Technology
Khor Seow Loon
6.6 Repair and Maintenance Management
TEAM MEMBERS
5
BEST PRACTICES AND ACHIEVEMENTS
INDICATOR 6.6: SAFETY
ISO 45001:2018
INDICATOR 6.3: LIBRARY
Library Portal
CRITERION 6: OTHER RESOURCES
INDICATOR 6.1 FINANCIAL RESOURCES
6
6.1.1 Operational Budget (Working Capital/Recurrent Cost/Operational Budget)
6.1.2 Developmental Budget (infrastructure, tools and equipment, HRD)
6.1.3 Annual Budget Increment (average of last 3 years)
(Annex 24: Source of Additional Budget)
6.1.4 External Financial Audit
6.1.5 Contribution of Income generating fund to the annual budget for
institutional development
6.1.6 Budget Preparation and Planning
CRITERION 6: OTHER RESOURCES
Indicator 6.1: Financial Resources
7
Preparation Process of Budget Operating (ABM)
Indicator 6.1: Financial Resources
CRITERION 6: OTHER RESOURCES
FLOW CHART
WORKING PROCESS: PREPARATION PROCESS OF BUDGET OPERATING (ABM)
7
8
Preparation Process of Allocation (ABM)
Indicator 6.1: Financial Resources
CRITERION 6: OTHER RESOURCES
FLOW CHART
WORKING PROCESS: PREPARATION PROCESS OF BUDGET OPERATING (ABM)
9
6.1.1 Operational budget (Working Capital/Recurrent Cost/Operational Budget)
Percentage of Allocated Budget vs Planned Budget
Indicator 6.1: Financial Resources
CRITERION 6: OTHER RESOURCES
YEAR | PLANNED (RM) | ALLOCATED (RM) | PERCENTAGE |
2018 | 20,393,704.38 | 20,393,704.38 | 100% |
2019 | 45,024,717.45 | 45,024,717.45 | 100% |
2020 | 32,456,491.12 | 32,456,491.12 | 100% |
2021 | 47,879,265.80 | 47,879,265.80 | 100% |
2022 | 38,220,052.62 | 38,220,052.62 | 100% |
10
6.1.2 Developmental budget (infrastructure, tools and equipment, HRD)
Percentage of Allocated Budget vs Planned Budget
Indicator 6.1: Financial Resources
CRITERION 6: OTHER RESOURCES
YEAR | PLANNED (RM) | ALLOCATED (RM) | PERCENTAGE |
2018 | 310,579.42 | 310,579.42 | 100% |
2019 | 546,357.25 | 546,357.25 | 100% |
2020 | 2,404,033.53 | 2,404,033.53 | 100% |
2021 | 1,503,918.00 | 1,503,918.00 | 100% |
2022 | 1,420,134.00 | 1,420,134.00 | 100% |
11
6.1.3 Annual Budget Increment [average of last 3 years]
Percentage of Additional Budget
Indicator 6.1: Financial Resources
CRITERION 6: OTHER RESOURCES
YEAR | ANNUAL BUDGET (RM) | ADDITIONAL BUDGET (RM) | ADDITIONAL BUDGET PERCENTAGE |
2018 | 39,578,535.13 | 32,296,096.74 | 81.60% |
2019 | 45,571,074.70 | 45,695,018.70 | 100% |
2020 | 34,860,524.65 | 32,820,448.43 | 94.15% |
2021 | 49,383,183.8 | 48,233,652.43 | 97.67% |
2022 | 39,640,186.62 | 48,461,057.63 | 100% |
Average percentage of last 3 years = (81.6% + 100% + 94.15% + 97.67% + 100%) / 5 = 94.68%
Annex 24: Sources of Additional Budget:
Indicator 6.1: Financial Resources
CRITERION 6: OTHER RESOURCES
SOURCE | 2018 (RM) | 2019 (RM) | 2020 (RM) | 2021 (RM) | 2022 (RM) |
Income-Generating Projects | 274,960.00 | 46,740.00 | 11,500.00 | 0 | 0 |
Tuition Fee | 301,313.00 | 400,829.50 | 223,323.70 | 337,119.93 | 72,681.00 |
Enhanced Government Allocation | 31,643,138.24 | 45,024,734.20 | 32,456,491.12 | 47,879,532.50 | 48,388,376.63 |
Others, please specify | 76,685.50 | 222,715.00 | 129,134.00 | 17,000.00 | 0.00 |
TOTAL | 32,296,096.74 | 45,695,018.70 | 32,820,448.82 | 48,233,652.43 | 48,461,057.63 |
12
13
6.1.4 : External Financial Audit - Frequency of External Audit
Frequency of External Audit: More than once a year
Indicator 6.1: Financial Resources
CRITERION 6: OTHER RESOURCES
AUDIT AGENCIES | 2018 | 2019 | 2020 | 2021 | 2022 |
Accountant General of Malaysia | √ | √ | | | |
Ministry of Higher Education | √ | √ | √ | | |
Auditor General of Malaysia | | | | | |
TOTAL Frequency | 2 | 2 | 1 | 0 | 0 |
14
6.1.5 Contribution of IGF to the annual budget for institutional development
Contribution of Income Generating Fund (IGF)
:
Indicator 6.1: Financial Resources
CRITERION 6: OTHER RESOURCES
SOURCE | 2018 (RM) | 2019 (RM) | 2020 (RM) | 2021 (RM) | 2022 (RM) |
Income Generating Fund (IGF) | 274,960.00 | 46,740.00 | 11,500.00 | 0 | 0 |
Allocated Budget | 39,640,186.62 | 45,571,074.70 | 34,860,524.65 | 49,383,183.80 | 39,640,186.62 |
Percentage | 1% | 0% | 0% | 0% | 0% |
Average percentage of last 5 years = 0.2%
7
6.1.6 Budget Preparation and Planning
Management Team involved in Financial Planning::
Indicator 6.1: Financial Resources
CRITERION 6: OTHER RESOURCES
COMMITTEE | NUMBER OF MEMBERS |
Management Team | 27 |
Percentage and Account Committee | 27 |
Percentage | 100% |
Quarter Yearly Meeting with All Management Team (Refer Minutes of Meetings of Budget Planning (ABM)
15
INDICATOR 6.2 PHYSICAL FACILITIES
16
6.2.1 Area and Accessibility of Institution (Polytechnic, College, School, Centre)
6.2.2 Classrooms
6.2.3 Furniture
(Annex 25 : Furniture )
6.2.4 Labs, Workshops, and other facilities including maintenance management
(Annex 26 : Office and Academic Buildings/Rooms)
(Annex 27 : Workshops and Laboratories)
(Annex 28 : Hostels/Dormitories/Kitchen and Dining and other Service
Facilities)
CRITERION 6: OTHER RESOURCES
Indicator 6.2: Physical Facilities
17
6.2.1 Area and Accessibility of Institution
(Polytechnic, College, School, Center)
Indicator 6.2: Physical Facilities
CRITERION 6: OTHER RESOURCES
18
6.2.1 Area and Accessibility of Institution
(Polytechnic, College, School, Center)
Indicator 6.2: Physical Facilities
CRITERION 6: OTHER RESOURCES
Guidelines and Regulations of Building Planning, (Bil 2 ,2009) by Economic Planning Unit.
National Standards Area:
100 acres
Politeknik Port Dickson
Area:
96.96acres
✓
7
6.2.1 Area and Accessibility of Institution
(Polytechnic, College, School, Center)
Indicator 6.2: Physical Facilities
CRITERION 6: OTHER RESOURCES
Public Transportation
19
20
6.2.1 Area and Accessibility of Institution
(Polytechnic, College, School, Center)
Indicator 6.2: Physical Facilities
CRITERION 6: OTHER RESOURCES
Building Permit
Land Title Grant
21
6.2.2 Classrooms
Indicator 6.2: Physical Facilities
CRITERION 6: OTHER RESOURCES
Comply with National Standard (Garis Panduan
dan Peraturan Bagi Perancangan Bangunan: Edisi 2015)
National Standard | POLITEKNIK PORT DICKSON | National Standard: 0.95m2 / student |
Guidelines and Regulations for Building Planning, 2015 Edition
| Institution’s Evaluation | |
Blok A & B: 64m² 64m²/ 40 = 1.6m²/student Blok D: 101.15m² 101.15 m²/ 40 = 2.53m²/student Blok E: 98m² 98m²/ 40 = 2.45m²/student |
✓
22
6.2.2 Classrooms
Indicator 6.2: Physical Facilities
CRITERION 6: OTHER RESOURCES
Example of classrooms Comply with National Standard (Garis Panduan dan Peraturan Bagi Perancangan Bangunan: Edisi 2015)
JABATAN KEJURUTERAAN ELEKTRIK | ||||||
No | Classroom | Provided Space | Student Capacity | Required Space (m2) Based on National Standards -Refer to Guideline | Remark | |
1 | BILIK KULIAH A13 | 64m² | 40 | 0.95m²/Student | 38m² | Comply |
2 | BILIK KULIAH A21 | 64m² | 40 | 0.95m²/Student | 38m² | Comply |
3 | BILIK KULIAH A22 | 64m² | 40 | 0.95m²/Student | 38m² | Comply |
4 | BILIK KULIAH D11 | 101.15m² | 40 | 0.95m²/Student | 38m² | Comply |
5 | BILIK KULIAH D12 | 101.15m² | 40 | 0.95m²/Student | 38m² | Comply |
6 | BILIK KULIAH D13 | 101.15m² | 40 | 0.95m²/Student | 38m² | Comply |
7 | BILIK KULIAH D14 | 101.15m² | 40 | 0.95m²/Student | 38m² | Comply |
8 | BILIK KULIAH E13 | 98m² | 40 | 0.95m²/Student | 38m² | Comply |
9 | BILIK KULIAH E14 | 98m² | 40 | 0.95m²/Student | 38m² | Comply |
10 | BILIK KULIAH E15 | 98m² | 40 | 0.95m²/Student | 38m² | Comply |
11 | BILIK KULIAH E16 | 98m² | 40 | 0.95m²/Student | 38m² | Comply |
12 | BILIK KULIAH E17 | 98m² | 40 | 0.95m²/Student | 38m² | Comply |
13 | BILIK KULIAH E18 | 98m² | 40 | 0.95m²/Student | 38m² | Comply |
23
6.2.2 Laboratories
Indicator 6.2: Physical Facilities
CRITERION 6: OTHER RESOURCES
GARIS PANDUAN DAN PERATURAN BAGI PERANCANGAN BANGUNAN
Pg 29
(Example of Laboratories/Workshops compliance to National Standards)
JABATAN KEJURUTERAAN AWAM | ||||||
No | Classroom | Provided Space | Student Capacity | Required Space (m2) Based on National Standards -Refer to Guideline | Remark | |
1 | MAKMAL SAINS BAHAN | 197.37 m² | 20 | 7.9m²/Student | 158m² | Comply |
2 | BENGKEL BATA | 132 m² | 40 | 0.95m²/Student | 38m² | Comply |
3 | BENGKEL PAIP | 118.42 m² | 40 | 0.95m²/Student | 38m² | Comply |
4 | MAKMAL UKUR TANAH DAN FOTOGRAMETRI | 64.92 m² | 40 | 0.95m²/Student | 38m² | Comply |
5 | BENGKEL KAYU | 298.87 m² | 20 | 7.9m²/Student | 158m² | Comply |
6 | MAKMAL HIDRAULIK | 119.53 m² | 40 | 0.95m²/Student | 38m² | Comply |
7 | MAKMAL SUMBER AIR | 64.09 m² | 40 | 0.95m²/Student | 38m² | Comply |
8 | MAKMAL KONKRIT | 87.61 m² | 40 | 0.95m²/Student | 38m² | Comply |
9 | MAKMAL STRUKTUR | 87.54 m² | 40 | 0.95m²/Student | 38m² | Comply |
10 | MAKMAL JALAN RAYA | 87.64 m² | 40 | 0.95m²/Student | 38m² | Comply |
11 | MAKMAL TANAH / GEOTEKNIK | 117.36 m² | 40 | 0.95m²/Student | 38m² | Comply |
12 | MAKMAL UKUR | 96.7 m² | 40 | 0.95m²/Student | 38m² | Comply |
24
6.2.3 Furniture
Indicator 6.2: Physical Facilities
CRITERION 6: OTHER RESOURCES
National Standard | POLITEKNIK PORT DICKSON | |
Malaysian Education Blueprint 2013 - 2025 | Institution’s Status | Institution’s Evaluation |
1 table and chair per student, 1 whiteboard or blackboard per classroom | Per class: 40 student tables 40 student chairs 1 lecturer table 1 lecturer chair | 100% adequate furniture for students and lecturers |
25
6.2.3 Furniture
Indicator 6.2: Physical Facilities
CRITERION 6: OTHER RESOURCES
No. | Inventory (4 years) | ||||
Furniture | 2018 | 2019 | 2020 | 2021 | |
1 | Student Table | 2232 | 2232 | 2232 | 2307 |
2 | Student’s Chair | 4253 | 4253 | 4528 | 4528 |
3 | Lecturer’s Table | 83 | 84 | 84 | 93 |
4 | Lecturer’s Chair | 216 | 261 | 301 | 301 |
5 | White Board | 117 | 117 | 123 | 123 |
6 | Soft Board | 35 | 37 | 37 | 44 |
Classroom Furniture
26
6.2.4 Labs, Workshops, and other facilities including maintenance management
Indicator 6.2: Physical Facilities
CRITERION 6: OTHER RESOURCES
Repair and Maintenance System
27
6.2.4 Labs, Workshops, and other facilities including maintenance management
Indicator 6.2: Physical Facilities
CRITERION 6: OTHER RESOURCES
Occupational Safety
& Health and Sanitation System
Act 514 (OSHA 1994)
POLITEKNIK PORT DICKSON SAFETY POLICY - DASAR KESELAMATAN
UBBL 1984
28
6.2.4 Labs, Workshops, and other facilities including maintenance management
Indicator 6.2: Physical Facilities
CRITERION 6: OTHER RESOURCES
Emergency Building Escape Plan
Fire Alarm Control Panel
Alarm Bell
Emergency Light
Fire Extinguisher
Heat Detector
Hose Reel
FIRE FIGHTING SYSTEM
Emergency Exit
INDICATOR 6.3 LIBRARY
29
6.3.1 Library Resources including Learning Resource Centre (print and non-
print, journals, magazines, newspapers, instructional materials)
(Annex 29 : Library Collection based on TVET Program Offerings/Courses)
6.3.2 Resource sharing with other libraries
(Annex 30 : Networking with Other Libraries)
6.3.3 Library Space and Facilities
6.3.4 Library Management System
6.3.5 Budget for the Operation of Library
6.3.6 Library Staff Quantity and Educational Qualifications
(Annex 31 : Library Staff Profile)
CRITERION 6: OTHER RESOURCES
Indicator 6.1: Financial Resources
30
Indicator 6.3.1 : Library Resources Including Learning Resource Centers
Indicator 6.3: Library
CRITERION 6: OTHER RESOURCES
Koleksi asas universiti hendaklah mencapai jumlah 10,000 judul (termasuk elektronik) dengan jumlah pelajar 1,500 orang.
(Standard Perpustakaan Universiti Malaysia, m/s 5 (5.2)
Bagi setiap judul teks utama, perpustakaan perlu menyedia sekurang-kurangnya tiga (3) buah naskhah bagi setiap 100 orang pelajar.
(Standard Perpustakaan Universiti, m/s 5 (4.1.1 b.)
Indicator 6.3.1 : Library Resources Including Learning Resource Centers
Indicator 6.3: Library
CRITERION 6: OTHER RESOURCES
31
PROGRAMMES | QUANTITY | PERCENTAGE |
JKA | 3540 | 17.6% |
JKE | 2547 | 12.6% |
JKM | 960 | 4.7% |
JP | 7776 | 38.6% |
JPA | 5286 | 26.2% |
TOTAL | 20109 | 100% |
QUANTITY OF BOOKS BASED ON PROGRAMMES
32
Indicator 6.3.2 : Resource Sharing with other libraries
Indicator 6.3: Library
CRITERION 6: OTHER RESOURCES
Institutions that have MOU/ networking /cooperative activities and resource sharing with Politeknik Port Dickson library
Letter of Intent Collaboration with other Polytechnic
33
Indicator 6.3.2 : Resource Sharing with other libraries
Indicator 6.3: Library
CRITERION 6: OTHER RESOURCES
Resource sharing and activities with INTI University Colleges
Resource sharing and activities with SK Permatang Pasir Linggi
Resource sharing and digital literacy with Pendita Za’ba Library Kuala Pilah Matriculation
Resource sharing and benchmark with Palace of Justice Malaysia
Benchmark to Citation and Infometric Center of Malaysia
Collaboration and activity Library Club with other Polytechnic
34
Indicator 6.3.3 : Library Space And Facilities
Indicator 6.3: Library
CRITERION 6: OTHER RESOURCES
35
Indicator 6.3.3 : Library Space And Facilities
Indicator 6.3: Library
CRITERION 6: OTHER RESOURCES
PERPUN Standard Page 8
35
Indicator 6.3.3 : Library Space And Facilities
Indicator 6.3: Library
CRITERION 6: OTHER RESOURCES
Indicator 6.3.3 : Library Space And Facilities
Reading Area
Open area 1.90 square meter square per person
b. Cubicle 1.90 square meter square per person
Reading area = 1,152 m2
YEAR | RESULTS |
2018 | 38.98% extra space available |
2019 | 37.33% extra space available |
2020 | 30.73% extra space available |
2021 | 29.08% extra space available |
2022 | 28.26% extra space available |
PERPUN Standard Page 7
iii. Reading Area
Open area 1.9 square meter per person
36
Indicator 6.3.3 : Library Space And Facilities
Indicator 6.3: Library
CRITERION 6: OTHER RESOURCES
37
Indicator 6.3.4 : Library Management System
Indicator 6.3: Library
CRITERION 6: OTHER RESOURCES
COLLECTION MANAGEMENT | |
Process | Tools |
Cataloging | Anglo-American Cataloging Rules (AACR2) |
Classification | Library Of Congress Classification Scheme (LCC) |
Subject Heading | Library Of Congress Subject Heading (LCSH) |
Library Of Congress Classification Scheme (LCC )
38
Indicator 6.3.4 : Library Management System
Indicator 6.3: Library
CRITERION 6: OTHER RESOURCES
LIBRARY PORTAL
WEB OPAC
U-PUSTAKA
39
Indicator 6.3.4 : Library Management System
Indicator 6.3: Library
CRITERION 6: OTHER RESOURCES
LIBRARY ACTIVITIES
40
Indicator 6.3.5 : Budget For The Operation Of Library
Indicator 6.3: Library
CRITERION 6: OTHER RESOURCES
41
Indicator 6.3.6 : Library Staff Quantity and Educational Qualifications
Indicator 6.3: Library
CRITERION 6: OTHER RESOURCES
INDICATOR 6.4 TOOLS AND EQUIPMENT
42
6.4.1 Tools, Equipment, and Accessories (by program)
(Annex 32 : Tools and Equipment)
6.4.2 Maintenance of tools and equipment
CRITERION 6: OTHER RESOURCES
Indicator 6.4: Tools and Equipment
43
6.4.1 Tools, Equipment, and Accessories (by program)
(Annex 32 : Tools and Equipment)
Indicator 6.4: Tools and Equipment
CRITERION 6: OTHER RESOURCES
Pneumatic System
KUKA System
44
6.4.2 Maintenance of tools and equipment
Indicator 6.4: Tools and Equipment
CRITERION 6: OTHER RESOURCES
45
6.4.2 Maintenance of tools and equipment
Indicator 6.4: Tools and Equipment
CRITERION 6: OTHER RESOURCES
System of Maintenance
Plan of maintaining tools and equipment maintenance report
Example of KewPA 15 form
INDICATOR 6.5 INFORMATION AND COMMUNICATION TECHNOLOGY
46
6.5.1 Computers and Required Software
(Annex 33 : General Computing Facilities of the Institution)
6.5.2 Multimedia Centre or Other Information Technology Facilities
6.5.3 Maintenance of information technology equipment
6.5.4 ICT Teaching and Non-Teaching Staff (number, qualification
and experience)
(Annex 34: Teaching and Non-Teaching Staff Trained in ICT)
CRITERION 6: OTHER RESOURCES
Indicator 6.5: Information and Communication Technology
47
6.5.1 Computers and Required Software
Indicator 6.5: Information and Communication Technology
CRITERION 6: OTHER RESOURCES
6.5.1 Computers and Required Software
Indicator 6.5: Information and Communication Technology
CRITERION 6: OTHER RESOURCES
Norma Peralatan Pengajian Politeknik | Computer Labs | |
40 | Makmal AM 1 | 41 |
ACAD 1 | 41 | |
ACAD 2 | 41 | |
MEKA ACAD | 41 | |
MIKRO-P | 41 | |
ECOMM | 41 | |
ECAD | 41 | |
48
6.5.2 Other Information Technology Units
(Computer Lab, Language Lab, Student Resource Centre)
Indicator 6.5: Information and Communication Technology
CRITERION 6: OTHER RESOURCES
49
Technology Enable Collaborative Classroom (TECC)
e-Learning Lab
Language Lab
Unit for Instructional Development & Multimedia (UIDM)
50
6.5.3 Maintenance of Information Technology Equipment
Indicator 6.5: Information and Communication Technology
CRITERION 6: OTHER RESOURCES
2) Corrective Maintenance (CM)
Maintenance works performed on computer labs are implemented on a schedule basis to ensure smooth operation.
Maintenance works performed to repair or replace components after computer equipment damage or cannot operate
Once a Year
(Done by Company)
Once a Week
(Done by UICT staffs)
By user reports complaints
51
6.5.4 ICT Teaching and Non-Teaching Staff
Proof of Trainings Provided
Indicator 6.5: Information and Communication Technology
CRITERION 6: OTHER RESOURCES
INDICATOR 6.6 REPAIR AND MAINTENANCE MANAGEMENT
52
6.6.1 Maintenance of Workshops/Laboratories
6.6.2 Safety measures and signage
CRITERION 6: OTHER RESOURCES
Indicator 6.6: Repair and Maintenance Management
The area adequacy of Workshops/Laboratory
All workshops / laboratories area in Politeknik Port Dickson are complied with Higher Learning Institution norm of floor area stated in Guidelines and Regulations of Building Planning (2015) by Economic Planning Unit.
53
6.6.1 Maintenance of Laboratories/ Workshops
Indicator 6.6: Repair and Maintenance Management
CRITERION 6: OTHER RESOURCES
54
6.6.1 Maintenance of Laboratories/ Workshops
Indicator 6.6: Repair and Maintenance Management
CRITERION 6: OTHER RESOURCES
55
6.6.1 Maintenance of Laboratories/ Workshops
Indicator 6.6: Repair and Maintenance Management
CRITERION 6: OTHER RESOURCES
6.6.2 Safety measure and signage
Indicator 6.6: Repair and Maintenance Management
CRITERION 6: OTHER RESOURCES
56
57
6.6.2 Safety measure and signage
Indicator 6.6: Repair and Maintenance Management
CRITERION 6: OTHER RESOURCES
2nd SURVEILLANCE AUDIT OSHMS ISO45001:2018
13-14 Oktober 2022
Example of Emergency Evacuation Plan
(Electrical Engineering Department)
58
6.6.2 Safety measure and signage
Indicator 6.6: Repair and Maintenance Management
CRITERION 6: OTHER RESOURCES
ASSEMBLY
POINT 4
BLOK A
BLOK B
(Notification of Accident, Dangerous Occurrence, Occupational Poisoning and Occupational Disease) Regulations 2004
JKKP 8 (DOSH)
6.6.2 Safety measure and signage
Indicator 6.6: Repair and Maintenance Management
CRITERION 6: OTHER RESOURCES
Year | Total number of accident | Place of accident |
2018 | 0 | nil |
2019 | 0 | nil |
2020 | 0 | nil |
2021 | 0 | nil |
2022 | - | - |
59
Example of
NADOPOD Report
Thank You
From CRITERION 6 Team Members
Politeknik Port Dickson, Malaysia
60