Soil Nail Walls��Module 4: Construction Inspection Activities
Menu:
Introduction
Training support files are available as attachments from the resources link.
Course Map
Menu:
Course Map
Module 1
Module 2
Module 3
Module 4
Module 5
Introduction to Soil Nail Walls
Fundamentals of Soil Nail Walls
Pre-Construction and Construction
Construction Inspection Activities
Testing and Monitoring
Production: Please add relevant icons for each module. Do not use the example shown for Module 3.
Construction Inspection Activities
Module Overview
This module will take approximately 60 minutes to complete.
Menu:
Module Overview
Excavation and Drilling
Nail Installation and Grouting
Initial Wall Facing
Construction Inspection Activities
Module Learning Outcomes
Upon completion of this module, you should be able to:
Menu:
Module Learning Outcomes
Construction Inspection Activities
Pre-Construction and Inspection
Menu:
Constructional Inspection Activities
1b
Hello again! Welcome to this active construction site…
Select the “Enter Site” box to get started.
ENTER SITE
1a
1a
1b
Construction Inspection Activities
Construction Inspection Activities
Menu: [indent]
Step 1 - Excavation
Excavation
Drilling
Installation
Initial Facing
Subsequent Levels
Final Facing
Production: This image can be any construction background
You’ll recognize these six steps of top-down construction…
Select Step 1 – Excavation to learn…
1b
1a
1a
1b
Construction Inspection Activities
Construction Inspection Activities
Menu: [indent]
Excavation
Excavation
Drilling
Installation
Initial Facing
Subsequent Levels
Final Facing
Inspect It
See It
Step 1 – Excavation
In Step 1, excavation is done in stages if more than one row…
Wall face
Proper excavation of the wall face…
As an inspector, your role is to monitor excavation height…
1a
1b
1c
SMEs, do you have an animation or short video clip to demonstrate?
Note: Ideally, all of the “See it” diagrams would be replaced with SME-provided animations or a set of pictures we could animate.
Construction Inspection Activities
Construction Inspection Activities
Menu: [indent]
Excavation
Excavation
Drilling
Installation
Initial Facing
Subsequent Levels
Final Facing
Inspect It
See It
Step 1 - Excavation
Production: “X” appears only on Inspect It tab. Please improve design.
SMEs, do you have any photos we could use?
Construction Inspection Activities
Construction Inspection Activities
Menu: [indent]
Drilling of the Nails
Excavation
Drilling
Installation
Initial Facing
Subsequent Levels
Final Facing
Inspect It
See It
Step 2 – Drilling of Nails
SMEs, do you have an animation or short video clip to demonstrate?
Steel Casing
Used in unstable soil
Drilling Equipment
Rotary or percussion
Drill Angle
Slightly downward
Nail Spacing
Typically 5 ft apart
Drilled Hole
Diameter and depth must match the design
1a
1d
1e
1b
Uncased
Used in stable soil
1c
1f
Construction Inspection Activities
Construction Inspection Activities
Menu: [indent]
Drilling of the Nails
Excavation
Drilling
Installation
Initial Facing
Subsequent Levels
Final Facing
Inspect It
See It
Step 2 – Drilling of Nails
SMEs, do you have any photos we could use?
Construction Inspection Activities
Construction Inspection Activities
Menu: [indent]
Nail Installation and Grouting
Excavation
Drilling
Installation
Initial Facing
Subsequent Levels
Final Facing
Inspect It
See It
Step 3 – Nail Installation and Grouting
SMEs, do you have an animation or short video clip to demonstrate?
In part one, the steel tendon is placed into the drilled hole along with a tremie grout pipe…
…it fills up the space around the outside of the tendon
In part two, the strip drains are installed…
1a
1b
1c
Construction Inspection Activities
Construction Inspection Activities
Menu: [indent]
Nail Installation and Grouting
Excavation
Drilling
Installation
Initial Facing
Subsequent Levels
Final Facing
Inspect It
See It
Step 3 – Nail Installation and Grouting
SMEs, do you have any photos we could use?
Nail Installation
Wall Batter
Grouting
Drainage
Construction Inspection Activities
Construction Inspection Activities
Menu: [indent]
Construction of the Initial Shotcrete Facing
Excavation
Drilling
Installation
Initial Facing
Subsequent Levels
Final Facing
Inspect It
See It
Step 4 – Construction of the Initial Shotcrete Facing
SMEs, do you have an animation, short video clip, or photos to use here
…an initial shotcrete facing is applied to the exposed surface.
Welded-wire mesh is placed in the middle of the layer…
…a steel bearing plate is pressed into the fresh shotcrete…
1c
1a
1b
Construction Inspection Activities
Construction Inspection Activities
Menu: [indent]
Construction of the Initial Shotcrete Facing
Excavation
Drilling
Installation
Initial Facing
Subsequent Levels
Final Facing
Inspect It
See It
Step 4 – Construction of the Initial Shotcrete Facing
The full inspection checklist comes after Step 6, but here’s a closer look at a few key details from Step 4.
Select each item to learn more
The steel bearing plate is pressed into the fresh surface while it’s still curing. A washer and hex nut are added to secure the nail head.
1a
1b
1a
1a
Welded wire mesh is placed before shotcrete is applied.
Construction Inspection Activities
Construction Inspection Activities
Menu: [indent]
Construction of Subsequent Levels
Excavation
Drilling
Installation
Initial Facing
Subsequent Levels
Final Facing
Inspect It
See It
Step 5 – Construction of Subsequent Levels
SMEs, do you have an animation, short video clip, or photos to use here
…the same process you saw in Steps 1 through 4 is repeated…
At each level, the strip drain is unrolled downward…
1a
1b
Construction Inspection Activities
Construction Inspection Activities
Menu: [indent]
Construction of Subsequent Levels
Excavation
Drilling
Installation
Initial Facing
Subsequent Levels
Final Facing
Inspect It
See It
Step 5 – Construction of Subsequent Levels
The full inspection checklist comes after Step 6, but here’s a closer look at a few key details from Step 5
Select each item to learn more
Each new welded-wire mesh panel must overlap the one above it by at least one full mesh cell. This keeps the facing reinforced between lifts.
1a
1b
1a
1a
SMEs, do you have a photo of a new welded-wire mesh panel being placed below a previous one?
SMEs, do you have a photo showing the strip drain being extended to a new lift?
At each new lift, the strip drain is unrolled downward to continue the drain path.
Construction Inspection Activities
Construction Inspection Activities
Menu: [indent]
Construction of the Final Facing
Excavation
Drilling
Installation
Initial Facing
Subsequent Levels
Final Facing
Inspect It
See It
Step 6 – Construction of the Final Facing
SMEs, do you have an animation, short video clip, or photos to use here
In step 6, construction wraps up with the final facing.
These can include weepholes, a foot drain at the base, and drainage ditches.
1a
1b
Construction Inspection Activities
Construction Inspection Activities
Menu: [indent]
Construction of the Final Facing
Excavation
Drilling
Installation
Initial Facing
Subsequent Levels
Final Facing
Inspect It
See It
Step 6 – Construction of the Final Facing
SMEs, do you have 3-4 high quality photos of completed soil nail walls?
Construction Inspection Activities
Limitations of Soil Nail Walls
Read each description below and choose the step number that matches the activity being described. Write your answer in the provided box. Select Submit when you’re satisfied with your answers.
Menu:
Knowledge Check – Name that Step!
Knowledge Check – Name that Step!
Submit
Description | Step Number (your answer) |
A). A new mesh panel overlaps the one above, and shotcrete connects with the previous layer. | |
B). Grout is placed from the bottom up using a tremie tube. | |
C). The wall is excavated one lift at a time to expose a fresh face for drilling | |
D). After all nails are installed, the final facing and drainage features are installed. | |
E). Holes are cleaned and centralizes are placed on the tendon before it’s inserted. | |
F). Shotcrete is applied, and a bearing plate is pressed into place over the wall. | |
Answer Choices
Step 1 – Excavation
Step 2 – Drilling of Nails
Step 3 – Nail Installation and Grouting
Step 4 – Construction of Initial Facing
Step 5 – Construction of Subsequent Levels
Step 6 – Construction of Final Facing
Construction Inspection Activities
Limitations of Soil Nail Walls
Read each description below and choose the step number that matches the activity being described. Write your answer in the provided box. Select Submit when you’re satisfied with your answers.
Menu: [Indent]
Name that Step - Debrief
Name that Step - Debrief
Submit
Description | Step Number (your answer) |
A). A new mesh panel overlaps the one above, and shotcrete connects with the previous layer. | |
B). Grout is placed from the bottom up using a tremie tube. | |
C). The wall is excavated one lift at a time to expose a fresh face for drilling | |
D). After all nails are installed, the final facing and drainage features are installed. | |
E). Holes are cleaned and centralizes are placed on the tendon before it’s inserted. | |
F). Shotcrete is applied, and a bearing plate is pressed into place over the wall. | |
Step 5
Step 3
Step 1
Step 6
Step 2
Step 4
Answer Choices
Step 1 – Excavation
Step 2 – Drilling of Nails
Step 3 – Nail Installation and Grouting
Step 4 – Construction of Initial Facing
Step 5 – Construction of Subsequent Levels
Step 6 – Construction of Final Facing
Construction Inspection Activities
Learning Outcomes
You should now be able to:
Menu:
Learning Outcomes
Construction Inspection Activities
Summary
This concludes Module 4: Construction Inspection Activities
Menu:
Module Complete
You have reached the end of this module.
Select the next module to continue.
Construction Inspection Activities