Soil Nail Walls�Module 4: Construction Inspection Activities

Menu:

Introduction

Training support files are available as attachments from the resources link.

2 of 22

Course Map

Menu:

Course Map

Module 1

Module 2

Module 3

Module 4

Module 5

Introduction to Soil Nail Walls

Fundamentals of Soil Nail Walls

Pre-Construction and Construction

Construction Inspection Activities

Testing and Monitoring

Production: Please add relevant icons for each module. Do not use the example shown for Module 3.

Construction Inspection Activities

3 of 22

Module Overview

This module will take approximately 60 minutes to complete.

Menu:

Module Overview

Excavation and Drilling

Nail Installation and Grouting

Initial Wall Facing

Construction Inspection Activities

4 of 22

Module Learning Outcomes

Upon completion of this module, you should be able to:

  • Summarize the key inspection activities involved in the excavation and drilling steps of soil nail wall construction
  • Describe the key inspection activities involved in the nail installation, grouting, and drainage steps of soil nail wall construction
  • Summarize the key inspection activities involved in construction of the wall facing for a soil nail wall

Menu:

Module Learning Outcomes

Construction Inspection Activities

5 of 22

Pre-Construction and Inspection

Menu:

Constructional Inspection Activities

1b

Hello again! Welcome to this active construction site…

Select the “Enter Site” box to get started.

ENTER SITE

1a

1a

1b

Construction Inspection Activities

6 of 22

Construction Inspection Activities

Menu: [indent]

Step 1 - Excavation

Excavation

Drilling

Installation

Initial Facing

Subsequent Levels

Final Facing

Production: This image can be any construction background

You’ll recognize these six steps of top-down construction…

Select Step 1 – Excavation to learn…

1b

1a

1a

1b

Construction Inspection Activities

7 of 22

Construction Inspection Activities

Menu: [indent]

Excavation

Excavation

Drilling

Installation

Initial Facing

Subsequent Levels

Final Facing

Inspect It

See It

Step 1 – Excavation

In Step 1, excavation is done in stages if more than one row…

Wall face

Proper excavation of the wall face…

As an inspector, your role is to monitor excavation height…

1a

1b

1c

SMEs, do you have an animation or short video clip to demonstrate?

Note: Ideally, all of the “See it” diagrams would be replaced with SME-provided animations or a set of pictures we could animate.

Construction Inspection Activities

8 of 22

Construction Inspection Activities

Menu: [indent]

Excavation

Excavation

Drilling

Installation

Initial Facing

Subsequent Levels

Final Facing

Inspect It

See It

Step 1 - Excavation

  • Evaluate type, nature, and moisture condition of excavated materials and those present at the excavation face
  • Identify unexpected soft zones, seepage areas, or fill
  • Monitor for recurrent raveling or sloughing of the excavation face
  • Document condition of the excavation face at the start and end of each work day
  • Note which portions of the face have been left unprotected, if any
  • Verify stability of the retained soils, area behind or upslope of the wall, and the bottom of the excavation (at least twice daily)

Production: “X” appears only on Inspect It tab. Please improve design.

SMEs, do you have any photos we could use?

Construction Inspection Activities

9 of 22

Construction Inspection Activities

Menu: [indent]

Drilling of the Nails

Excavation

Drilling

Installation

Initial Facing

Subsequent Levels

Final Facing

Inspect It

See It

Step 2 – Drilling of Nails

SMEs, do you have an animation or short video clip to demonstrate?

Steel Casing

Used in unstable soil

Drilling Equipment

Rotary or percussion

Drill Angle

Slightly downward

Nail Spacing

Typically 5 ft apart

Drilled Hole

Diameter and depth must match the design

1a

1d

1e

1b

Uncased

Used in stable soil

1c

1f

Construction Inspection Activities

10 of 22

Construction Inspection Activities

Menu: [indent]

Drilling of the Nails

Excavation

Drilling

Installation

Initial Facing

Subsequent Levels

Final Facing

Inspect It

See It

Step 2 – Drilling of Nails

  • Note equipment and installation method
  • Check drill fluid pressure, flow rate, and volume
  • Watch for ground subsidence above drill location
  • Look for excess soil removal with little drill progress
  • Record drill method, bit type, casing diameter and length, drill string length, and fluid type
  • Measure drill bit, string, and casing before drilling
  • Record final hole length after flushing
  • Track how long hole stays open before tendon insertion

SMEs, do you have any photos we could use?

Construction Inspection Activities

11 of 22

Construction Inspection Activities

Menu: [indent]

Nail Installation and Grouting

Excavation

Drilling

Installation

Initial Facing

Subsequent Levels

Final Facing

Inspect It

See It

Step 3 – Nail Installation and Grouting

SMEs, do you have an animation or short video clip to demonstrate?

In part one, the steel tendon is placed into the drilled hole along with a tremie grout pipe…

…it fills up the space around the outside of the tendon

In part two, the strip drains are installed…

1a

1b

1c

Construction Inspection Activities

12 of 22

Construction Inspection Activities

Menu: [indent]

Nail Installation and Grouting

Excavation

Drilling

Installation

Initial Facing

Subsequent Levels

Final Facing

Inspect It

See It

Step 3 – Nail Installation and Grouting

  • Confirm correct nail are being used
  • Check bar size and length, corrosion protection and centralizers
  • Verify centralizers are spaced according to specs and securely attached to the tendon
  • Check grout consistency and identify if mix appears too thin or watery
  • Report any issues to your team or engineer
  • Confirm the hole is grouted withing the required time after drilling
  • Confirm grout placement and coverage is reached
  • Confirm wall batter matches design plans (vertical or sloped)
  • Confirm nail inclination follows the wall batter.
  • Verify nails are aligned with the slope of the wall
  • Confirm strip drains are:
    • Spaced according to plans
    • Facing the correct direction
    • Attached securely (stapled or pinned)
    • Installed per manufacturer’s instructions

SMEs, do you have any photos we could use?

Nail Installation

Wall Batter

Grouting

Drainage

Construction Inspection Activities

13 of 22

Construction Inspection Activities

Menu: [indent]

Construction of the Initial Shotcrete Facing

Excavation

Drilling

Installation

Initial Facing

Subsequent Levels

Final Facing

Inspect It

See It

Step 4 – Construction of the Initial Shotcrete Facing

SMEs, do you have an animation, short video clip, or photos to use here

…an initial shotcrete facing is applied to the exposed surface.

Welded-wire mesh is placed in the middle of the layer…

…a steel bearing plate is pressed into the fresh shotcrete…

1c

1a

1b

Construction Inspection Activities

14 of 22

Construction Inspection Activities

Menu: [indent]

Construction of the Initial Shotcrete Facing

Excavation

Drilling

Installation

Initial Facing

Subsequent Levels

Final Facing

Inspect It

See It

Step 4 – Construction of the Initial Shotcrete Facing

The full inspection checklist comes after Step 6, but here’s a closer look at a few key details from Step 4.

Select each item to learn more

The steel bearing plate is pressed into the fresh surface while it’s still curing. A washer and hex nut are added to secure the nail head.

1a

1b

1a

1a

Welded wire mesh is placed before shotcrete is applied.

Construction Inspection Activities

15 of 22

Construction Inspection Activities

Menu: [indent]

Construction of Subsequent Levels

Excavation

Drilling

Installation

Initial Facing

Subsequent Levels

Final Facing

Inspect It

See It

Step 5 – Construction of Subsequent Levels

SMEs, do you have an animation, short video clip, or photos to use here

…the same process you saw in Steps 1 through 4 is repeated…

At each level, the strip drain is unrolled downward…

1a

1b

Construction Inspection Activities

16 of 22

Construction Inspection Activities

Menu: [indent]

Construction of Subsequent Levels

Excavation

Drilling

Installation

Initial Facing

Subsequent Levels

Final Facing

Inspect It

See It

Step 5 – Construction of Subsequent Levels

The full inspection checklist comes after Step 6, but here’s a closer look at a few key details from Step 5

Select each item to learn more

Each new welded-wire mesh panel must overlap the one above it by at least one full mesh cell. This keeps the facing reinforced between lifts.

1a

1b

1a

1a

SMEs, do you have a photo of a new welded-wire mesh panel being placed below a previous one?

SMEs, do you have a photo showing the strip drain being extended to a new lift?

At each new lift, the strip drain is unrolled downward to continue the drain path.

Construction Inspection Activities

17 of 22

Construction Inspection Activities

Menu: [indent]

Construction of the Final Facing

Excavation

Drilling

Installation

Initial Facing

Subsequent Levels

Final Facing

Inspect It

See It

Step 6 – Construction of the Final Facing

SMEs, do you have an animation, short video clip, or photos to use here

In step 6, construction wraps up with the final facing.

These can include weepholes, a foot drain at the base, and drainage ditches.

1a

1b

Construction Inspection Activities

18 of 22

Construction Inspection Activities

Menu: [indent]

Construction of the Final Facing

Excavation

Drilling

Installation

Initial Facing

Subsequent Levels

Final Facing

Inspect It

See It

Step 6 – Construction of the Final Facing

  • Confirm the nozzleman is experienced and certified if required
  • Verify shotcrete depth, rebar spacing, coverage, and nail head hardware
  • Check that shotcrete is placed from the bottom up
  • Check there are no voids behind mesh, rebar, and bearing plates
  • Confirm wall surface has clean edges and accurate lines
  • Verify weather conditions are acceptable or properly managed

SMEs, do you have 3-4 high quality photos of completed soil nail walls?

Construction Inspection Activities

19 of 22

Limitations of Soil Nail Walls

Read each description below and choose the step number that matches the activity being described. Write your answer in the provided box. Select Submit when you’re satisfied with your answers.

Menu:

Knowledge Check – Name that Step!

Knowledge Check – Name that Step!

Submit

Description

Step Number (your answer)

A). A new mesh panel overlaps the one above, and shotcrete connects with the previous layer.

B). Grout is placed from the bottom up using a tremie tube.

C). The wall is excavated one lift at a time to expose a fresh face for drilling

D). After all nails are installed, the final facing and drainage features are installed.

E). Holes are cleaned and centralizes are placed on the tendon before it’s inserted.

F). Shotcrete is applied, and a bearing plate is pressed into place over the wall.

Answer Choices

Step 1 – Excavation

Step 2 – Drilling of Nails

Step 3 – Nail Installation and Grouting

Step 4 – Construction of Initial Facing

Step 5 – Construction of Subsequent Levels

Step 6 – Construction of Final Facing

Construction Inspection Activities

20 of 22

Limitations of Soil Nail Walls

Read each description below and choose the step number that matches the activity being described. Write your answer in the provided box. Select Submit when you’re satisfied with your answers.

Menu: [Indent]

Name that Step - Debrief

Name that Step - Debrief

Submit

Description

Step Number (your answer)

A). A new mesh panel overlaps the one above, and shotcrete connects with the previous layer.

B). Grout is placed from the bottom up using a tremie tube.

C). The wall is excavated one lift at a time to expose a fresh face for drilling

D). After all nails are installed, the final facing and drainage features are installed.

E). Holes are cleaned and centralizes are placed on the tendon before it’s inserted.

F). Shotcrete is applied, and a bearing plate is pressed into place over the wall.

Step 5

Step 3

Step 1

Step 6

Step 2

Step 4

Answer Choices

Step 1 – Excavation

Step 2 – Drilling of Nails

Step 3 – Nail Installation and Grouting

Step 4 – Construction of Initial Facing

Step 5 – Construction of Subsequent Levels

Step 6 – Construction of Final Facing

Construction Inspection Activities

21 of 22

Learning Outcomes

You should now be able to:

  • Identify the key responsibilities of an inspector in the construction of soil nail walls
  • Recall the key activities related to pre-construction preparation and materials inspection of soil nail walls
  • List the key steps in a typical soil nail wall construction sequence

Menu:

Learning Outcomes

Construction Inspection Activities

22 of 22

Summary

This concludes Module 4: Construction Inspection Activities

Menu:

Module Complete

You have reached the end of this module.

Select the next module to continue.

Construction Inspection Activities