  • Project Overview

  • Key Project Goals

  • “Real-Time” Outreach

  • “Real-Time” Operations

  • “Real-Time” Updates

Agenda

© 2025 Iteris, Inc.  All rights reserved. www.iteris.com

2

3 of 34

I-10 Broadway Curve Improvement Project

  • Largest Urban Freeway Reconstruction Project in ADOT’s History

  • 11-mile Project Corridor; from Loop 202 Santan/South Mountain to I-17
  • Construction Duration: June 2021 through May 2025

© 2025 Iteris, Inc.  All rights reserved. www.iteris.com

3

4 of 34

Key Project Goals

  • Increase Safety
    • Reduce Conflicts, Weaving, and Merge locations
    • Improve Vulnerable Road Use Access across freeway
  • Reduce Congestion
    • Prepare for 25% traffic increase by 2040
    • Implement Collector-Distributor Roads
  • Maintain Traffic Throughout Construction
    • No reduction in # of lanes on I-10
    • Improved Outreach Throughout Construction

© 2025 Iteris, Inc.  All rights reserved. www.iteris.com

4

1968

NOW: 300,000 veh/day

5 of 34

Internal Project Goal

  • Maintain a positive project image with the Public!

© 2025 Iteris, Inc.  All rights reserved. www.iteris.com

5

6 of 34

Not a Widening Project – this is a MOT Project!

© 2025 Iteris, Inc.  All rights reserved. www.iteris.com

6

    • Bridge Construction
    • Freeway Widening
    • Interchange Reconstruction

Typical Project Focus

    • Maintenance of Traffic
    • Public Outreach
    • Stakeholder Engagement
    • Real-time Information

I-10 Broadway Curve’s Focus

7 of 34

Proactive Outreach and Marketing Campaign

  • Required Project

© 2025 Iteris, Inc.  All rights reserved. www.iteris.com

7

i10BroadwayCurve.com

Stay #AheadOfTheCurve

8 of 34

Project Specific Mobile App

The Curve �Free mobile app for iPhone and Android users

© 2025 Iteris, Inc.  All rights reserved. www.iteris.com

8

9 of 34

Maintained up-to-date App Information

  • Joint Venture Construction Team oversaw MOT set-ups/takedowns

  • 24/7/365 Coverage from Iteris’ Network Operations Center

© 2025 Iteris, Inc.  All rights reserved. www.iteris.com

9

10 of 34

Performance-based MOT with ClearGuide

© 2025 Iteris, Inc.  All rights reserved. www.iteris.com

10

Demonstrate past performance measurements for planning future closure hours and detours

Monitor construction traffic condition and compare to typical traffic conditions�

Quickly identify congestion hotspots and �verify mitigation effectiveness

11 of 34

Real-time view of Operations (24/7/365)

© 2025 Iteris, Inc.  All rights reserved. www.iteris.com

11

Weekend Closure

Detour

Detour

Detour

12 of 34

Resolve Signal Timing Bottlenecks�and Validate Operations

© 2025 Iteris, Inc.  All rights reserved. www.iteris.com

12

Concentrated delay at one signal

Local Alternate route

Signals along alternate route

Max Delay: �9 minutes

@ 2:10 PM

13 of 34

Monitor Stakeholder Concerns

© 2025 Iteris, Inc.  All rights reserved. www.iteris.com

13

Typical Weekend

(No Closures)

During Full EB Closure @ SR-51

Average Delay (Minutes)

14 of 34

Immediately evaluate Before/After Impacts

© 2025 Iteris, Inc.  All rights reserved. www.iteris.com

14

Before ramp modification

After ramp modification

Average Delay (Minutes)

Closure of

Off-ramp Lane

15 of 34

© 2025 Iteris, Inc.  All rights reserved. www.iteris.com

15

Configure Alerts

Receive Automatic Notifications

16 of 34

Dynamic conditions…

© 2025 Iteris, Inc.  All rights reserved. www.iteris.com

16

17 of 34

…meets a changing environment

  • Overwhelming reliance: One study found that 93% of Americans reported depending on their GPS to get around, with one in five using it daily.
  • Google Maps dominance: Surveys show that about 70% of U.S. drivers use Google Maps for navigation. One analysis found that over 71% of U.S. smartphone users rely on Google Maps weekly.
  • Waze and Apple Maps: These apps are the next most popular choices, used by about 27% and 25% of U.S. drivers, respectively.

per Google AI: https://share.google/aimode/IPz20fM7brbRK1Y4F

© 2025 Iteris, Inc.  All rights reserved. www.iteris.com

17

18 of 34

Google Maps

  • Map Update Interface is available for all Google Users

  • Updates are not automatic, and they require validation by Google prior to implementation

© 2025 Iteris, Inc.  All rights reserved. www.iteris.com

18

19 of 34

© 2025 Iteris, Inc.  All rights reserved. www.iteris.com

19

20 of 34

© 2025 Iteris, Inc.  All rights reserved. www.iteris.com

20

Google rejected approximately 50% of my changes on initial submittal

    • They could not verify new alignments against their aerial information

    • Be persistent – You will receive e-mail notifications of any rejections or acceptance.

    • All interactions were via electronic submission – no people to interact with

21 of 34

Apple Maps

  • Apple Maps GIS Group will implement map changes
  • Can review current Apple basemapping online at https://maps.apple.com/
  • Established recurring monthly calls to review upcoming changes
  • Submitted modifications via e-mail, typically implemented within one week, often within a few days.

© 2025 Iteris, Inc.  All rights reserved. www.iteris.com

21

22 of 34

Apple Map Contacts

  • Generic Information Updates; i.e. Temporary Road Closures, minor changes, or business information

Email: maps@apple.com

  • Apple also has a team to handle large scale changes and construction projects

Email: maps-construction@apple.com

© 2025 Iteris, Inc.  All rights reserved. www.iteris.com

22

23 of 34

Waze

© 2025 Iteris, Inc.  All rights reserved. www.iteris.com

23

  • Map updates for a State are by the identified State Manager

Ryan, SunDevil2213 AZ State Manager sundevilwazer@gmail.com

  • Established weekly coordination calls to verify closures and to review updates to the Waze Basemap
  • Updates were scheduled to implement based upon closure opening – also provided real-time updates via e-mail/text when roadways opened early

24 of 34

Google and Waze are the same company

© 2025 Iteris, Inc.  All rights reserved. www.iteris.com

24

I know what many of you are thinking…

25 of 34

�No. Updates to the Waze Map are not a workaround to update Google Maps�

© 2025 Iteris, Inc.  All rights reserved. www.iteris.com

25

I know what many of you are thinking…

26 of 34

The only constant is change…

© 2025 Iteris, Inc.  All rights reserved. www.iteris.com

26

27 of 34

Engaging with Waymo

  • The I-10 Broadway Curve Project impacted roadways within Waymo’s Phoenix and Tempe Service areas.

  • Established monthly coordination calls to discuss upcoming closures/shifts and to identify segments of the project as they were opened to their final configuration.

  • Waymo outreach and technical staff wanted to understand timeline for improvements to come online – vehicles needed to be re-trained.

© 2025 Iteris, Inc.  All rights reserved. www.iteris.com

27

28 of 34

In Conclusion

Improve the Traveler Expericence through the use of real-time:

  • Data
  • Operations
  • Engagement

© 2025 Iteris, Inc.  All rights reserved. www.iteris.com

28

29 of 34

Thank you.

Contact information

Michael Washkowiak

mwashkowiak@iteris.com

602.819.9134

© 2025 Iteris, Inc.  All rights reserved. www.iteris.com

29

30 of 34

Questions?

Contact information

Michael Washkowiak

mwashkowiak@iteris.com

602.819.9134

© 2025 Iteris, Inc.  All rights reserved. www.iteris.com

30

31 of 34

Monitoring of Adaptive Operations

  • The City of Tempe implemented an Adaptive Corridor on Baseline Road to accommodate traffic during construction
  • Early in the project communication in the Baseline Corridor was not reliable.
  • Iteris staff established congestion alerts for the Baseline Corridor to identify if the travel time through the corridor moderately, or significantly.

© 2025 Iteris, Inc.  All rights reserved. www.iteris.com

31

32 of 34

Monitoring of Adaptive Operations

© 2025 Iteris, Inc.  All rights reserved. www.iteris.com

32

33 of 34

Monitoring of Adaptive Operations