1 of 4

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

CEB + Soil Mixer + Lime Kiln + Controller

Product Roadmap 2017

3D Printer Construction Set + Shredder + Filament Extruder + Wood/Plastic Composite Extruder + Polycarbonate Glazing Production + 3DP belts

CNC Torch Table Construction Set + Height Control + Rotary Encoder

Heavy Duty CNC Machining Construction Set + Tubing Cutter + CNC Hole Punch

Tractor + GPS Guidance + Hay Cutter + Baler + Hammermill (insulation) + Heavy Duty Shredder + Swingblade

Backhoe + 360 degree

Gasifier + Solar Power Cube

Charcoal Maker + Eco-tractor

House Systems: Water 2.0, Biodigester 2.0, Heat + TEG 2.0, Solar Hydrogen, Wind Turbine, Compressed Biogas, Off-Grid Materials Facility, Low-Head Hydro, Pit Greenhouse for$5

Aquaponic Workshop

Seed Eco-Home 2 Workshop

Eco Tractor XM

360 Backhoe XM

3DP XM

CNC Torch XM

Brick Press XM

Tractor XM

2 of 4

Product Roadmap 2017

Assumptions:

  • All projects require engineering team of 12-24 to produce visible inspirational velocity; projects begin development with 12 engineers in place
    • As in scrum, people pair up for a team of 12 building to 24
    • Each Team Member keeps a Work Log and Backlog.
  • Goal for HR function: weekly onboarding rate of 3 people per week, or 4 weeks to build a team; 4 week training period for CAD, Design Guides, etc.
  • 10 hour/person weekly average requirement
  • Serious recruiting function is developed
  • Retention via training and visible velocity
  • Weekly goal for an effective team is a combined 240 hours, or nominally 1.5 months of full time development
    • xPM manages 2 teams directly, and oversees 4 more teams indirectly
    • Process Managers report to xPM directly
    • 6 projects total at one time per xPM
    • After 6 projects are achieved, OSE Lieutenants in Training are started
  • Roadmap is fixed for the year based on ambitious build schedule + product ecology + 20 year roadmap

3 of 4

Key Milestones from 2016 Roadmap

4 of 4

SME Search - Candidates

  • Methane compression - how to store methane produced by biodigesters, beginning at the cubic meter scale;